Cal DQM Report - PowerPoint PPT Presentation

About This Presentation
Title:

Cal DQM Report

Description:

Checkout runs done: QINJ 18361. UNO 18362. PED 18363. LASER 18364. LED 18365 ... Called by ZCR at 10:30, the hip presenter shows 12 new b.c's for QINJ during run 50684 ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 16
Provided by: michel176
Category:
Tags: dqm | cal | checkout | report

less

Transcript and Presenter's Notes

Title: Cal DQM Report


1
Cal DQM Report
  • July 7 July 14, 2004

2
July 8th
  • Updated bad channel list using CAL quick-calib
    50632
  • Created version 3653 with 357 bad channels, 0
    holes.
  • 6 bad FECs, 3 bad ADCs

3
B5 UNO
4
July 9th
  • Updated bad channels using CAL quick-calib 50644
  • Version 3654 created with 361 b.cs and 0 holes
  • Same bad FECs ADCs
  • Checkout runs done
  • QINJ 18361
  • UNO 18362
  • PED 18363
  • LASER 18364
  • LED 18365
  • Created version 3654 by mistake-didnt use it

5
July 9th (cont.)
  • Full Electronic Calibration
  • CALIB version 3656 66 b.cs, 0 holes
  • Trimming
  • UNO 18375 59(0) 121(0) 29(0)
  • UNO 18380 44(0) 116(0) 27(0)
  • Created version 3657 with 302 b.cs and 0 holes
  • 3 FECs and 2 ADCs

6
July 10
  • Updated bad channel list with CAL quick-calib
    50661
  • Created version 3658 313 b.cs 0 holes

7
July 11
  • Updated bad channel list with CAL quick-calib
    50677
  • Created version 3659 316 b.cs 0 holes
  • Called by ZCR at 1030, the hip presenter shows
    12 new b.cs for QINJ during run 50684
  • Compare QINJ for 50677 and online QINJ histos,
    bad channels in R5. I told the ZRC to take a CAL
    quick-calib, and that I would use it to update
    the b.cs

8
Comparison of R5 for 2 runs
9
July 12
  • Updated bad channel list using CAL quick-calib
    50687
  • Unfortunately R5 is not bad anymore
  • Created version 3660 with 321 b.cs and 0 holes
  • ZCR calls-1 hour break
  • Run auto_adc2volt.sh
  • Creates adc2volt version 2381, cal verison 3662,
    with 295 b.cs, 0 holes

10
R5 revisited, problem gone
11
July 12 (cont.)
  • Did checkout runs
  • QINJ 18390
  • UNO 18391
  • PED 18392
  • LASER 18393
  • LED 18394

12
July 13
  • Updated b.cs using CAL quick-calib 50698,
    version 3663 303 b.cs, 0 holes (done the
    previous night)
  • Took checkout runs
  • QINJ 18395
  • UNO 18396
  • PED 18397
  • LASER 18398
  • LED 18399
  • Break in morning but no call from ZCR, instead
    they did a CAL quick-calib, so I used it to
    update the b.cs, version 3664 306 b.cs, 0
    holes.

13
Problems
  • No calls from ZCR! (Except for the R5 thing)

14
DQM
  • Checked all runs taken during the week, all
    seemed fine, some weird thing in the pull for
    BCAL.

15
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com