Title: Carrie C McCaslin
1Carrie C McCaslin Chief Information
Officer Exploration Systems Mission Directorate
2The Vision for Space Exploration
THE FUNDAMENTAL GOAL OF THIS VISION IS TO ADVANCE
U.S. SCIENTIFIC, SECURITY, AND ECONOMIC INTEREST
THROUGH A ROBUST SPACE EXPLORATION PROGRAM
Implement a sustained and affordable human and
robotic program to explore the solar system and
beyond Extend human presence across the solar
system, starting with a human return to the Moon
by the year 2020, in preparation for human
exploration of Mars and other destinations Develo
p the innovative technologies, knowledge, and
infrastructures both to explore and to support
decisions about the destinations for human
exploration and Promote international and
commercial participation in exploration to
further U.S. scientific, security, and economic
interests.
3Integrated Collaborative Environment
ICE is web-centric environment which will be used
by industry, academia and government for
sharing, collaborating, integrating, accessing
and controlling management information and
product data defining all of the products which
are part of Exploration Systems.
- Single source access to all ESMD data
- Integrated programmatics
- Accessibility from anywhere in the world
ICE is the authoritative source for all program
data
4ICE Major Components
- Product Life Cycle Management w/ Integration Bus
enables access to all sources of authoritative
program data resident in multiple data sources. - Programmatic Management Management of all
programmatic data (cost, schedule, performance,
risk) as well as providing a single view into
information allowing users to develop earned
value metrics and risk mitigation plans. - Project Collaboration Application for sharing
and teaming among all ICE constituents that
provides access control, discussion forums,
resource management and project reporting. - Process Automation (Workflow) automated process
management ensuring consistency across programs. - Visualization web-centric capability providing
2D and 3D visual collaboration, mock-up,
prototyping, review and study as part of the
product development process.
5ICE Integrated Business Process View
Systems Engineering (Rqt Mgt/PLM/SBA)
Risk Management (RiskRqt Mgt/WBS)
ICE Portal
Program Management (IMS/IMP/EVMS)
Other Agency Applications
Design Engineering Process (PLM/CAD/SBA)
Web Browser
Configuration Management (PDM/SBA/Rqts)
Center Data Systems
Manufacturing Process (PLM/CAD/SBA)
ICE Provides Tools which Support the Business
Process and Cross Process Integration
Portfolio Management (PLM/EVMS/IMP/S)
NASA IFMP
Requirements Management (Rqts Mgt/PLM)
Contractor Systems
Test Evaluation (PLM/SBA/Rqt Mgt)
Data Management (PDM/WBS/IMS/P)
VVA (PLM/SBA/Rqt Mgt)
Document Management (PDM/WBS/IMS/P)
6ICE Integration Options CEV RFP
- Option 1 Use NASA ICE as contractor work area
- Option 2 Deploy an Agent to a Single Repository
of all Contractor Data - Option 3 Integrate with ICE using an
integration layer
7Why ICE?
- ICE Compresses ESMD Program/Project Delivery
Schedules By - Enabling simultaneous development and
synchronized releases of multiple independently
developed systems as a deployable package to NASA - Acceleration of alternative designs and systems
for ESMD - Providing a single collaboration environment
enabling the compression of numerous critical
process life cycles. - ICE Reduces ESMD Program/Project Performance Risk
By - Providing better program visibility, control and
decisions throughout the program life cycle - Enabling assessment and review of ESMD
Program/Project components throughout the
development life cycle - Enabling virtual test and evaluation of digital
representations of systems - ICE Reduces ESMD Program/Project Cost By
- Better and faster selection and incorporation of
technologies - Reduction in travel costs and paper based
communication costs - ICE Improves Mission Assurance and Mission
Safety - Ensures availability of all data related to ESMD
products during ESMD operations key lessons
learned from Space Shuttle Station
8 Integrated Roadmap
- 2005
- Applications Deployment
- - Requirements Tool
- - wInsight
- - IMP/IMS
- - Single Sign On
- - Virtual Meeting/On Line Col.
- - Active Risk Manager
- Infrastructure Upgrades
- - Production Cluster
- - Integration Cluster
- - Staging Cluster
- - Development Environment
- - Application Server Upgrade
- - Storage Area Network
- - Sun Cluster Guard
- Capabilities
- - System Engineering Rqts
- - Mgmt/CM/DM/SE/SBA
2006 Applications Deployment - Integration
Broker - CAD Agents (Visualization) - ICE
Source Code Control System - ECAD Data
Manager - MCAD Data Manager Infrastructure
Upgrades - Addl application nodes - R8
Upgrade Capabilities - Engineering -
MCAD/ECAD - Software/CM -
Visualization - Contractor Integration
- Integration Layer/NExIOM - Enterprise
Architecture - Mission Segment Simulators -
Operator in the Loop Simulation Capability
(ground flight)
2007 Applications Deployment -
TBD Infrastructure Upgrade - Geographic
Failover Capabilities - Enterprise
Architecture - Operator in the Loop
Simulation Capability (crew) - Mission
Segment Simulators (increased fidelity) -
Preliminary Hardware in the Loop
2008 Applications Deployment -
TBD Infrastructure Upgrade - H/W Technology
Refresh Capabilities - Enterprise Architecture
9Summary
- ICE is the authoritative source of all ESMD data.
- ICE compresses ESMD program/project schedules
reduces risks reduces costs and improves
mission assurance and safety. - ICE is more than a data repository. ICE enables,
supports and integrates business processes. - ICE is more than Windchill. ICE will be a set of
tools integrated together and accessed through a
single interface. - ICE will be the means by which contractors
deliver data to the NASA.