Alpha Magnetic Spectrometer NASA / DOE
AMS-02 Avionics Kennedy Space Center
(KSC) Functional Integration Test (FIT) Review
Tim Urban / ESCG April 14, 2005
2
KSC Functional Integration Test (FIT)
Review Purpose
Alpha Magnetic Spectrometer NASA / DOE
  • AMS-02 Cargo Integration Test Equipment (CITE)
    Test
  • Functional end-to-end test of AMS-02 / STS
    interfaces
  • Commands created by STS test systems to AMS-02
    J-Crate
  • AMS-02 housekeeping data to STS test systems
  • AMS-02 Payload Test and Checkout System (PTCS)
    Test
  • Functional end-to-end test of AMS-02 / ISS
    interfaces
  • Ground generated commands to AMS-02 J-Crate and
    ACOP
  • ACOP generated commands to AMS-02 J-Crate
  • AMS-02 science and housekeeping data to ACOP
  • AMS-02 and ACOP down-linked science and
    housekeeping data

April 14, 2005
T. J. Urban / ESCG
2
3
KSC FIT Review AMS-02 Hardware Tested
Alpha Magnetic Spectrometer NASA / DOE
  • ACOP and J-Crate Engineering Models
  • AMS-02 ground computers
  • Payload Operations Control Center (POCC)
  • Telescience Resource Kit (TREK)
  • AMS-02 PDS was unavailable KSC 28 VDC power
    supply used
  • Flight-like cable design build-ups
  • Included build-up with Class I flight Passive
    Umbilical Mechanism Assembly (UMA) cable harness
  • Verified cable designs

T. J. Urban / ESCG
3
April 14, 2005
4
KSC FIT Review PTCS Test Schematic
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
4
April 14, 2005
5
KSC FIT Review PTCS Test Block Diagram
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
5
April 14, 2005
6
KSC FIT Review Test Participants
Alpha Magnetic Spectrometer NASA / DOE
  • KSC FIT supported by the following organizations
  • KSC
  • AMS-02
  • AMS-02 Project Office (APO)
  • Collaboration
  • MSFC JSC
  • Orbiter Interface Unit (OIU)
  • Mission Operations Directorate (MOD)
  • ISS Payload Integration (OZ)
  • Boeing Communications and Tracking (CT)

T. J. Urban / ESCG
6
April 14, 2005
7
KSC FIT Review Test Team
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
7
April 14, 2005
8
KSC FIT Review Test Results
Alpha Magnetic Spectrometer NASA / DOE
  • KSC FIT was considered an engineering development
    test, to verify interfaces and command / data
    structures prior to flight implementation.
  • Two cable (pin-out) errors were found
  • RS-422 cable between AMS-02 and the Shuttle test
    bed
  • 1553 cable for PTCS between AMS-02 and the ISS
    test bed
  • Cable modifications made and verified by test.
  • These design changes will be implemented for
    flight.
  • Minor issues with some data formatting and
    configurations.
  • PTCS APS encountered loss of sync with HRDL.
  • Characterized during FIT, but exact cause still
    unclear.
  • KSC created IPR (problem report) no. IP000765.

T. J. Urban / ESCG
8
April 14, 2005
9
KSC FIT Review Test Results (continued)
Alpha Magnetic Spectrometer NASA / DOE
  • Remote Terminal (RT) address was not as expected,
    which necessitated a software change in JROM to
    accept the correct RT.
  • Load testing of data systems was not possible due
    to inadequate systems for both Payload Data
    Services System (PDSS) and Ground Recording
    System (GRS).
  • Test procedures developed and refined real-time
    with lessons learned.

T. J. Urban / ESCG
9
April 14, 2005
10
KSC FIT Review Test Summary
Alpha Magnetic Spectrometer NASA / DOE
  • STS CITE Tests
  • All communications functionalities and interfaces
    verified.
  • After FIT, AMS-02 support for KSC CITE was
    discontinued, and will not be available for
    AMS-02 flight hardware integrated testing. Other
    testing capabilities are being investigated.
  • ISS PTCS Tests
  • All communications functionalities and interfaces
    verified.
  • AMS-02 test team gained an improved understanding
    of ISS based command and data flow management.

T. J. Urban / ESCG
10
April 14, 2005
11
KSC FIT Review Follow-On Tests
Alpha Magnetic Spectrometer NASA / DOE
  • HRDL-APS Loss of Sync
  • Further testing to understand the sync anomaly
    and test solutions.
  • Will be performed this year at JSC ISS Systems
    Integration Lab (ISIL) facility (See next
    slides).
  • AMS-02 PDS Unavailability
  • Power quality test requirements, location and
    schedule being identified at this time.
  • AMS-02 SSRMS Configuration Interconnect
    Verification
  • Will verify interfaces through flight cable
    harnesses for Power and Video Grapple Fixture
    (PVGF) to External Berthing Camera System (EBCS)
    to AMS-02 PDS, possibly 4th quarter of 2005.

T. J. Urban / ESCG
11
April 14, 2005
12
KSC FIT Review Follow-On Test - ISS Systems
Integration Lab (ISIL)
Alpha Magnetic Spectrometer NASA / DOE
  • Test Objectives
  • The exact cause of this problem was not
    understood by AMS or ISS test teams.
  • Attempt to reproduce and quantify the loss of
    data problem.
  • Develop an AMS-02 work-around in the event the
    data loss is repeatable.
  • Test Description
  • ACOP and AMS/ACOP hardware readily on hand in
    Houston.
  • APS, HCOR, HRFM, TAXI Analyzer provided by ISS
    Systems Integration Lab (ISIL).
  • Test procedures being developed.
  • Test Status
  • Require schedule inputs from AMS Collaboration
    team regarding foreign nationals
  • Visa availability / renewal
  • To support JSC and ISIL badging processes
  • HCOR and HRFM are not currently located in the
    ISIL.
  • All Issues should be resolved to support the
    planned test window of mid-June.

T. J. Urban / ESCG
12
April 14, 2005
13
KSC FIT Review Follow-On Test - ISS Systems
Integration Lab
Alpha Magnetic Spectrometer NASA / DOE
Configuration Diagram
APS
HCOR
HRFM
AMS-02/ ACOP
FEP
ACOP
TAXI Analyzer
ACOP - AMS Crew Operations Post AMS - Alpha
Magnetic Spectrometer APS - Automated Payload
Switch FEP Front-end Processor HCOR - High
Rate Communications Outage Recorder HRFM - High
Rate Frame Multiplexor TAXI Transparent
Asynchronous eXchange Interface
T. J. Urban / ESCG
13
April 14, 2005
Write a Comment