Presentation to MACRUC Pennsylvania Quality of Service - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Presentation to MACRUC Pennsylvania Quality of Service

Description:

Pennsylvania Quality of Service. Joseph K. Witmer, Assistant Counsel ... These Are Not The Views or Rules of The Pennsylvania Public Utility Commission. ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 16
Provided by: leannm
Category:

less

Transcript and Presenter's Notes

Title: Presentation to MACRUC Pennsylvania Quality of Service


1
Presentation toMACRUC Pennsylvania Quality of
Service
  • Joseph K. Witmer, Assistant Counsel
  • Pennsylvania Public Utility Commission
  • Presentation to MACRUC
  • Email joswitmer_at_state.pa.us
  • June 2008
  • The Views Expressed Are Those of the Presenter.
  • These Are Not The Views or Rules of The
    Pennsylvania Public Utility Commission.

2
INADEQUATE SERVICE, MONITORING
REPAIR.PENNSYLVANIASPERFORMANCE STANDARDS52
PA.Code 63.11-63.65
3
Service Quality Measures52 Pa.Code 63.11- 63.36
  • 63.12 Interference Inductive Effect
  • 63.20 Line Extensions
  • Based on Filed Tariffs
  • 63.23 Maintenance Based on 81 NEC
  • 63.24 Continuous Service
  • Service Outage Rebates.
  • 63.32 Systems of Accounts

4
Service Quality Measures52 Pa.Code 63.51-65
  • 63.51-52 General Purpose IXCs exempt.
  • 63.53 Service based on tariffs.
  • 63.54 Retain bills for 90 days or until dispute
    is resolved.
  • 63.55 Commission must be told if service quality
    standard is not met for 3 months study with
    results reported to Commission.

5
Service Quality Standards52 Pa.Code 63.51-65
  • 63.56 Measurements based on industry standards.
  • 63.57 Emergency out of service restored in 3
    hours others outages within 24 hours except
    weekends involving less than 15.
  • 63.58 Primary service installed within 5 working
    days nonprimary within 20 of receipt unless
    there is an agreement to an alternative.

6
Service Quality Measures52 Pa.Code 63.51-65
  • 63.59 Answering Service Calls
  • a) Average operator answering rates of 10 seconds
    for toll and operator-assisted
  • b) 85 of repair service within 20 second during
    normal working house
  • c) Compliance based on a monthly basis

7
Service Quality Standards52 Pa.Code 63.51-65
  • 63.61 Local Dial Service
  • a) Ninety-eight percent of calls shall be
    provided a dial tone within 3 seconds
  •    b) Ninety-seven percent of correctly dialed
    intraoffice calls shall be completed.
  •    c) Ninety-six percent of correctly dialed
    interoffice calls shall be completed.

8
Service Quality52 Pa.Code 63.62
  • Direct Dialed Distance
  • - trunk and related switching mandates
  • - 97 of outgoing completed to the trunk group
  • - 98 of income completed to the trunk group
  • - applies ONLY to calls placed exclusively over
    the facilities of the public utility or over
    which the utility leases for the completion of
    local exchange calls.

9
Service Quality Standards52 Pa.Code 63.51-65
  • 63.63 Transmission Standards
  • a) Based upon the use of telephone sets
    connected to a 48-Volt dial central office,
    measured at a frequency of 1000 Hertz (Hz)
  • b) Termination requires a loop resistance not
    exceeding the operating design of the central
    office equipment
  • c) Overall transmission loss on a customer loop
    shall not exceed 15 decibels.

10
Service Quality Standards52 Pa.Code 63.51-65
  • 63.64 Metering Inspections
  • 63.65 Safety Mandate to Meet Federal
    Occupational Health Safety (OSHA)
    Requirements

11
Issue of Technology Change
  • Standards Focus on Copper
  • Fios (Fiber) is replacing Copper
  • Triple Play Relies on Fiber
  • Fiber Investment is Carrier Focus
  • Service Quality is A Concern.

12
RECENT DEVELOPMENTSP-00021985
  • 2002 Consumer Advocate Petition alleged quality
    of service problems
  • Verizon-OCA settlement.
  • Commission approved Request to Withdraw Petition
    no PUC approval.

13
Recent DevelopmentsP-00021985
  • Joint Statement of Vice-Chairman Cawley and
    Commissioner Christy
  • Ongoing PUC authority to seek data under 66
    Pa.C.S. 504-505.
  • 66 Pa.C.S. 3019(b)(2) authority to review and
    revise quality of service standards that
    address the safety, adequacy, reliability and
    privacy of telecommunications services

14
Questions?
15
Presentation toMACRUC Pennsylvania Quality of
Service
  • Joseph K. Witmer, Assistant Counsel
  • Pennsylvania Public Utility Commission
  • Presentation to MACRUC
  • Email joswitmer_at_state.pa.us
  • June 2008
  • The Views Expressed Are Those of the Presenter.
  • These Are Not The Views or Rules of The
    Pennsylvania Public Utility Commission.
Write a Comment
User Comments (0)
About PowerShow.com