UGBS Main Plate
Patrick Schmid (left) of ETHZ did the CNC
machining of the plate. Urs Horisberger (ETHZ)
Completed follow up machining
2
UGBS Plate Machining
  • Back (top) Front (right) sides of plate

3
UGBS Subassemblies
4
UGBS Plumbing Model
  • Model was made to
  • perform a Fit check of the subassemblies
  • Weld the whole system
  • Test the valves system

5
MV197 Bracket
6
MV197 Bracket Tube welding
  • The full assembly looks like this
  • Easier to look at half! The welding procedure
    will look at only half since the other side is
    mirror symmetrical

7
2 Step Construction
Step 1
Step 2
  • First the U (welding steps 1,2,3) are welded
    not mounted in the bracket.
  • Then the xv254 and the filter are mounted and
    welded (steps 4-6)
  • The GP50 is installed and all remaining welds
    performed.
  • The welded components are now removed to allow
    for the welding of the MV197 valves
  • The MV197s are installed and secured as shown
  • The U (steps 1,2) is pre-welded and then welded
    to the valves (steps 3,4)
  • the 1/4-1/8 reducers are pre-welded to the
    T-junctions and then welded to the valves (steps
    7,8)
  • The U is then welded (steps 9,10)
  • The U to the xv234is then welded per step 11.

8
Step 3
  • The Step 1 components are then mounted and welded
    (It may be more practical that all 4 mv197 are
    mounted before installing the pre-welded pressure
    and filter units)
  • Perform same steps for mirror side
  • Note also, all 1/8 tubes going to the buffer
    volumes or otherwise (NOT SHOWN -but at the ends
    of all 1/4-18 reduction pieces) need to be
    pre-welded -the welding head will not fit later.

9
4 Valve Bracket Welding Sequence
  • Follow sequence as shown
  • Welds 1 5 need attention since they may need to
    be done first

10
4 Valve Bracket
11
2 Valve Bracket
12
2Valve Bracket Welding Sequence
Step 2 (valves)
Step 1 (Oriface/Filter Unit)
  • Welding follows the sequence above.
  • Step (12) is welded after inserting the filter
    into the bracket.
  • Weld 4 in the 2nd step should be performed after
    the oriface/filter unit is loosely fitted into
    the bracket
  • After welding is copleted RTV is injected in the
    Filter cavity

2 valve bracket Completed
13
Venting Valve Bracket
14
TRD Gas System Mechanics StatusR.Becker (MIT)
October 30, 2002
  • UGBS design done, commercial version being
    assembled
  • Flight main plate ordered, most flight brackets
    manufactured
  • UGBS kit including welding procedures being
    prepared for ARDE
  • UGBC design needs to be finalized
  • UGBC to TRD manifold plumbing bracketry designs
    needed

Radiator not shown
15
UGBC (Circulation System)
  • Status
  • Sealed cylindrical container design feasible
  • CERN welding experts state that such a cylinder
    can be welded cleanly.
  • Rough mechanical design done (Right)
  • components arranged within boundaries (wasnt
    easy)
  • 4-valve bracket adapted from UGBS
  • Detailed design foreseen by early December