Title: Project assignments TMR4240


1
Project assignments TMR4240
  • Positioning of Floating LNG Barge
  • Intelligent structures
  • Fault-tolerant control of CyberShip 3
  • Thruster control of CyberShip 3
  • Evaluation 30 of final grade.

2
1) Positioning of Floating LNG Barge
  • In cooperation with Statoil
  • Position mooring of barge.
  • Relative positioning during offloading, using
    CyberShip 2 as LNG tanker
  • Simulations with MCSim
  • Model tests in MCLab
  • Teaching assistant Per Ivar Berntsen

3
2) Intelligent structures
  • In cooperation with Statoil
  • Motion/vibration damping of heat exchange
    structure on FLNG barge
  • Passivity based control
  • Space industry technology transfer
  • Teaching assistant Per Ivar Berntsen
  • Affiliated master student Anne Marthine Rustad

4
3) Fault-tolerant control of CyberShip 3
  • CyberShip 3 (CS3) will be brand new
  • Construction of a DP system for CS3 for
  • Normal conditions
  • Extreme conditions
  • Simulations with MCSim
  • Possibly model testing in MCLab
  • Teaching assistant Øyvind Smogeli
  • Affiliated master student Martin Austad

5
4) Thruster control of CyberShip 3
  • Construction of a thrust allocation system for
    CS3
  • Construction of local thruster control schemes
    for CS3
  • Simulations with MCSim
  • Possibly model testing in MCLab
  • Teaching assistant Øyvind Smogeli

6
Project Phase 1
  • Start Today
  • Deadline Wednesday 28th of January
  • Feedback Friday 30th of January
  • Required content
  • Definition of motivation/background, activities,
    duration, resources and milestones
  • Description of mathematical models
  • Description of relevant control strategies
  • Description of learning goals
  • Reporting plan

7
Project Phase 2
  • Start Immediately after feedback phase 1
  • Scope Carry out the plan from phase 1
  • Theoretical work to be done during weeks 9-10
    (23.02 05.03)
  • Allotted time in MCLab Week 12 (15.03 19.03)
  • Report deadline Wednesday 21st of April
  • Mandatory presentation Tuesday 11th of May

8
Groups
  • There will be 4 groups, one for each project
  • Each group should consist of students from both
    marine technology and engineering cybernetics.
  • The groups will be decided by the teaching
    assistants.

9
Dates and deadlines
  • Phase 1 start 23.01
  • Phase 1 deadline 28.01
  • Phase 1 feedback 30.01
  • Phase 2 start 30.01
  • MCLab 15.03 -19.03
  • Phase 2 report deadline 21.04
  • Phase 2 presentation 11.05