PRELIMINARY DESIGN REVIEW - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

PRELIMINARY DESIGN REVIEW

Description:

Unable to hear forklift due to his impairment. Creates an unsafe working condition ... Enhance safety conditions. Develop assistive technology ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 33
Provided by: msu138
Category:

less

Transcript and Presenter's Notes

Title: PRELIMINARY DESIGN REVIEW


1

DESIGN REVIEW
GUARDIAN 2000
2
SENIOR DESIGN TEAM
Design Team Leader Ted Anderson Design Team
Members Cedric George, Dale Pittman
Faculty Advisor Dr. Randolph Follett
Project Advisor Dr. Gary McFadyen T. K. Martin
Center
3
PROBLEM STATEMENT
  • Hearing-impaired employee
  • Unable to hear forklift due to his impairment
  • Creates an unsafe working condition

4
OBJECTIVES
  • Enhance safety conditions
  • Develop assistive technology
  • Develop practical and cost effective solution

5
DESIGN CONSTRAINTS
  • Safety
  • Monitoring System
  • Power Specification
  • Durability
  • Physical Packaging
  • Cost

6
Layout of Project Grid
 
7
Layout of Project Grid
 
8
Layout of Project Grid
 
9
Guardian 2000 Overview
10
Hardware
11
Monitoring System
12
Monitoring System
12 Volt Battery Tester
Transmitting Photo Diode
13
CALCULATIONS
14
CALCULATIONS
Fixed gain inverted amplifier
Fixed gain non-inverted amplifier
Voltage Comparison
15
Transmitter Circuit Design
16
PCB for Transmitter
17
Monitoring System Simulation
Frequency
3 kHz output from the Transmitter
18
Monitoring System
Infrared Signal
Sensor
Strobe Light
Indicators
19
Receiver Circuit Design
20
PCB for Receiver
21
Monitoring System Simulation
Receiver detecting the transmitter signal
22
Monitoring System Simulation
Output indicates an unbroken beam
Receiver Output
23
Monitoring System Simulation
Output indicates broken beam !!!!
Transmitter Output
Receiver Output
24
Cost/Availability Factors
Estimated Cost 200.00 6.00 5.00
5.00 15.00 25.00 ------------------- Total
256
  • Transmitter and Receiver
  • Voltage Regulator and Relay
  • 555 Timer and 74123
  • Push Button and 7432
  • Package items
  • Other components

25
FUTURE WORK
  • Test System
  • Proximity System

26
SUMMARY
  • Problem
  • Solution
  • Approach

27
DEMONSTRATION
28
Layout of Project Grid
 
29
Environmental Problems
  • What type of environmental problems may
  • affect the sensors?
  • Dust
  • Moisture
  • Smoke

30
QuestionAnswers
31
Layout of Project Grid
 
32
Pager and Test System
Pager Unit
Receiver
Test Button
Vibrating Motor
Transmitter
Receiver (Detector System)
Write a Comment
User Comments (0)
About PowerShow.com