1DSSD update
2Outline
- DSSD design in Vienna How it is done
- First test batch of SVD DSSDs
- Status of the purchase
- Responses from the vendors
- Construction of a prototype ladder
- Status of the trapezoidal DSSD design
3DSSD design in Vienna
- ICstudio by Mentor Graphics Inc. commercial
software for design of integrated circuits. - ICstudio can be steered by a script program
written in AMPLE to draw a design automatically.
4DSSD design in Vienna
- The sensor design is defined by a list of
parameters, which are used by the AMPLE program
at runtime. - This way, one can account for the design rules of
the vendor quickly by changing the parameter in
question and rerun the program.
5Status of test batch purchase
- Two commercial vendors have been selected to
produce one DSSD test batch each - (Norway)
- (UK)
- Due to KEK rules, purchase requires official
bidding procedure carried out in Japan - Both vendors can be contacted via
- Micron prefers
6Comparison of vendors
SINTEF Micron
Commencing 6 months
Wafer Procurement 10 weeks -
Completion 30 weeks7.5 months 9 months
Contingency /- 1 month /- 1 month
Masks, Testing 8.0 M 5.1 M
Administration 1.6 M -
Processing 13 M (23 pcs) 2.5 M (first 10 pcs.) 5 M (next 20pcs.)
Total Sum 22.5 M (178 k) 15 M (120 k)
Sensors received 23 30
Cost per sensor 1 M (8k ) 0.5 M (4k )
7Status of test batch purchase
- While official purchase procedure is ongoing and
carried out by KEK (Tsuboyama-san knows more), we
started the technical discussion with the
companies. - They each got a preliminary DSSD design as basis
for discussion of design rules - rectangular sensor for layer
3 122.8x38.4mm² active area, 160/50µm pitch - rectangular sensor for layer
4 122.8x57.6mm² active area, 240/75µm pitch
8Response from
- Contact person Colin Wilburn (Boss)
- Few answers to technical questions
- Lower bias resistor value will improve tolerance
control. - Proposes as japanese agency, KEK has
already worked with them. - Manufacturing could take 6-12 months, maybe even
longer.
9Response from
- Contact person Thor-Erik Hansen (Chief
scientist) - Technical discussion started, we already received
valuable hints - We need two additional masks for inclusion of
silicon nitride in the polysilicon resistors - Strip numbering, labels and alignment markers
have to be mirrored on the backplane to appear
correctly on the device - The vias have to be larger to avoid the risk of
spiking -
- Thor-Erik Hansen is on vacation from July 13
until beginning of August.
10Construction of a prototype ladder
- Prototype of ladder 4
- including Origami modules
- including trapezoidal sensor
- Plan for the purchase
- Order rectangular sensors at
- Order wedge sensors at
- Little time left, design of wedge sensors has
started.
11Construction of a prototype ladder
Layer Ladders Rect. Sensors 50µm Rect. Sensors 75µm Wedge Sensors APVs
6 17 0 68 17 850
5 14 0 42 14 560
4 10 0 20 10 300
3 8 16 0 0 192
Sum 49 16 130 41 1902
12Status of the trapezoidal design
- The existing AMPLE script used for sensor design
is not capable of drawing wedge-shaped sensors. - Rewriting necessary, started two weeks ago.
- Status
- AC strips of frontplane ready
- AC strips of backplane including p-stop ready
- To do
- Implement bias ring, guard ring, edge ring
- Implement labels, strip numbering, alignment
markers
13Status of the trapezoidal design
14Status of the trapezoidal design
Frontplane p strips in n bulk material (p-side,
junction side)
Note This is not a sensor design, its just a
proof of concept!
15Status of the trapezoidal design
Backplane n strips in n bulk material
surrounded by p-stop atolls (n-side, ohmic side)
Note This is not a sensor design, its just a
proof of concept!
16Restart of production at Hamamatsu
- Good news (Japan) will
restart the production of 6 DSSDs. - But the first testable devices will be available
in one year minimum. So they are not eligible for
the production of a test batch. - However, they could be back in the game for the
final production.
17Summary
- Both companies and
have been contacted to start the
discussion, even without official quotation. - Rectangular sensor design ready for discussion,
wedge design under construction. - What are the next steps?
- Will KEK request quotations directly from the
vendors? - Do we have to wait for the official bidding to
take place?
18The End