Title: UCSB 4-Hybrid Thermal Test System Status


1
UCSB 4-Hybrid Thermal Test System Status
7 July 2003 Sam Burke UCSB HEP Group
2
Progress
  • Designed Pitch Adaptor Antenna
  • In Machine Shop
  • Assembly of Cold Box with all Sensors
  • First System Test using full modified CERN Code
  • Temperature Sensor Test
  • Humidity Sensor Test

3
Pitch Adapter Antenna
4
Progress

5
1st Cold Box System Test
6
Future Plans
  • Complete T/E Element Cabling
  • Assembly of Relay Control Board
  • T/E Element Testing
  • CERN Code
  • Chiller Water
  • Room Temp to - 20 deg C
  • Fabricate Flow Control Panel (see photo)
  • 19 Panel in HEP Shop (Chris)
  • Lance to start assembly soon

7
Flow Control Panel
8
Flow Control Panel
9
Flow Control Panel
  • Note following components
  • Digital I/O board
  • Solid State Relays
  • Solenoid valves
  • Flow sensor

10