Title: Controlled Software Management


1
Controlled Software Management
  • HNF-PRO-309
  • Rev. 5

2
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

3
Purpose of HNF-PRO-309
  • Manage software lifecycle activities including
  • Identify Requirements,
  • Control Configuration,
  • Acquire Evaluate,
  • Design Implement,
  • Verify Validate,
  • Operate Maintain, and
  • Retire software

4
Software Management Method
  • Systematic
  • Disciplined
  • Quantifiable

5
Software Control Consequences
  • Therac 25
  • Patriot Missile System
  • Ariane 5

6
Therac 25
7
Patriot Missile System
8
Ariane 5
9
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

10
Scope
  • Applies to all controlled software.
  • Controlled software includes nuclear,
    safety-related, high-risk and quality affecting
    software currently in use at the Hanford Site
    under the Project Hanford Management Contract
    (PHMC)

11
Exemptions
  • Site licensed and metered software
  • Firmware
  • WIPP Controlled by other procedures
  • OCRWM Controlled by other procedures
  • Single-use spreadsheets

12
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

13
Roles and Responsibilities
  • Project/Facility/Function Manager
  • Software SME
  • Software Owner
  • Independent Technical Reviewer
  • Test Personnel
  • FH Chief Information Officer

14
Procedure Process Setup
  • Manage the Project
  • Acquire
  • Evaluate Legacy/COTS
  • Accept for New Scope
  • Manage Requirements
  • Design

15
Procedure Process Execution
  • Implement
  • Test
  • Approve for Use
  • Install
  • Operate
  • Maintain

16
Software Project Management (5.1.2)
  • Software Classification
  • Risk Management
  • Quality Planning

17
Software Classification (Appendix A)
  • Controlled Software Determination Checklist
  • Level A Safety Systems
  • Level B Safety-related analysis (SARP)
  • Level C High-risk
  • Level D Medium-risk
  • Level E Low-risk

18
Risk Management (5.1.3)
  • Functional Requirements Document
  • Controlled Software Determination Checklist
  • Computer System Evaluation
  • Acquisition/Development Strategy
  • Alternatives Analysis

19
Quality Planning (5.1.4)
  • A description of the software need
  • Organizations responsible for software
  • Configuration Management Methodology
  • Supporting documentation to be prepared
  • Required Software Reviews
  • Programming standards, conventions, techniques or
    methodologies.

20
Quality Planning contd
  • Error reporting/corrective action methods
  • Preparation of Contingency and Disaster Recovery
    Plans (HNF-PRO-597)
  • Data and Information Management Standards
    (HNF-PRO-656)
  • Functional Security Requirements/ Application
    Development (HNF-PRO-311)

21
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

22
Software Acquisition (5.2)
  • Statement of Work (HNF-PRO-186)
  • CIO Approval for Level A, B, or C software
  • Purchase software (HNF-PRO-123)
  • Virus scan files (HNF-PRO-592)
  • License agreements

23
Acquisition contd
  • Establish primitive baseline
  • Prepare Software Management Plan
  • Manage software code media
  • Archive completed code in Source Integrity/Visual
    Source Safe
  • Manage documents (HNF-RD-8310)

24
COTS/LEGACY Evaluation (5.3)
  • Functional Requirements Document
  • Software Evaluation Report
  • intended use of software
  • adequacy of software to support application
  • adequacy of test plans/test reports
  • adequacy of user documentation
  • compensatory measures

25
Acceptance for New Scope (5.4)
  • Functional Requirements Document
  • Evaluate existing software baseline
  • intended use of software
  • adequacy of software to support application
  • adequacy of SRS/SDD documentation
  • adequacy of test plans/test reports
  • adequacy of user documentation

26
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

27
Lifecycle phases
  • Requirements
  • Design
  • Implementation
  • Testing
  • Installation
  • Operation Maintenance
  • Retirement

28
Requirements Management (5.5)
  • Software Requirements Specification
  • Functionality
  • Performance
  • Design Constraints
  • Attributes
  • External Interfaces
  • Software and Data Security Controls

29
Requirements Management
  • Identify critical characteristics for putting a
    payload into space.

30
Software Design (5.6)
  • Design Description
  • Description of major components
  • Technical Description
  • Allowable Input/Output ranges
  • Integration Points (HLAN)
  • Data Model (Metadata)
  • Hardware and Software Configuration

31
Technical Description
  • Theoretical basis
  • Mathematical model
  • Control Flow
  • Data Flow
  • Control Logic
  • Data Structures

32
Independent Design Review
  • Complete
  • Verifiable
  • Consistent
  • Traceable to requirements

33
Software Implementation (5.7)
  • Create source code
  • Analyze and debug software
  • Document code
  • Code walkthrough (Level A/B/C only)
  • Prepare user documentation

34
User Documentation
  • Software name and version identifier
  • Description of user interaction
  • Description of required training
  • Input/Output specifications
  • Input/Output format

35
User Documentation contd
  • Description of system limitations
  • System configuration
  • Information for maintenance support
  • Description of user messages and how user can
    respond
  • Process for reporting problems

36
Establish software baseline
  • Manage software media
  • Archive code in Source Integrity/Visual Source
    Safe
  • Manage documentation as supporting documents
  • Register baseline in Hanford Information System
    Inventory (HISI)

37
Software Testing (5.8)
  • Assign test personnel
  • Prepare Test Plan
  • Specify test methods
  • Independent Technical Review
  • Perform testing
  • Prepare Acceptance Test Report

38
Test Plan
  • Test objectives and technical approach,
  • Required ranges of input parameters,
  • Requirements for testing logic branches,
  • Requirements for hardware integration,
  • Evaluation method(s) to be used,
  • Sequence of required activities, and
  • Acceptance criteria.

39
Test Methods
  • Hand calculations,
  • Calculations using comparable proven problems,
  • Comparison with confirmed published data,
  • Comparisons with validated computer programs,
  • Comparisons with experiments and tests, and
  • Manual inspections of system performance.

40
Case Study test planning
41
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

42
Acceptance Test Report
  • Demonstrate that test results address the
    specified test acceptance criteria
  • Changes to methods, inputs, or sequence
  • Date of test
  • Simulation models used, where applicable
  • Hardware used and test configuration
  • Test results and conclusions
  • Requirements Traceability Matrix

43
Approval for Use (5.9)
  • Register the software application in the Hanford
    Information System Inventory (HISI) by completing
    the required links to supporting documentation.
  • Software SME Approval for Level A/B/C/D Software
  • CIO Approval for Level A/B Software

44
Software Installation (5.10)
  • NETWORK
  • Prepare PRRB Submission Package
  • Obtain PRRB approval
  • Perform installation
  • Prepare Software IC Form
  • Archive completed software in Source
    Integrity/Visual Source Safe
  • DESKTOP
  • Perform installation
  • Prepare Software IC Form
  • Archive completed software in Source
    Integrity/Visual Source Safe

45
PRRB Submittal
  • PRRB Submission Form
  • Implementation Plan

46
Software Operation (5.11)
  • Manage Authorized User List
  • Establish user access controls
  • Document user qualification (Level A/B)
  • Log usage for Level A/B Software
  • Operate software
  • Perform periodic operational testing (Level A)
  • Software retirement

47
Software Maintenance (5.12)
  • User notification of required software change
  • Software Owner resolves problem with Computer
    Technical Support
  • Complete Problem Report to identify software
    problem and determine impact
  • Report error in accordance with HNF-PRO-052
  • Propose updates/changes by completing PR/CR
  • SME approval of proposed software changes

48
Maintenance contd
  • Implement approved software change
  • Define test cases required to verify minor change
    and to support regression testing
  • Independent Technical Review
  • Perform required testing
  • Document testing on PR/CR or Test Report
  • Review and approve PR/CR test documentation
  • Update HISI when new or revised software products
    are approved for use

49
Learning Objectives
  • Understand the consequence of inadequate software
    management control
  • Identify scope of procedure and approved
    exemptions
  • Specify Software Project Management activities
  • Determine process for software acceptance
  • Develop software test plan
  • Define Software Operation and Maintenance
    Requirements
  • Define Lifecycle phases and documentation
    requirements

50
Conclusion
  • HNF-PRO-309 manages software lifecycle using a
    graded approach
  • Identify Requirements,
  • Control Configuration,
  • Acquire Evaluate,
  • Design Implement,
  • Verify Validate,
  • Operate Maintain, and
  • Retire software