Current Status/Plan
  • Currently powered on, gt10 LPA taken.
  • (1) Scripts from TKR CPT.
  • (2) Install revised ACD scripts.
  • (3) Power down ACD HV bias.
  • (4) Execute scripts from ACD Full Functional.
    List from Lester.
  • (5) Power down LAT, power up Single Tower 0.
  • (6) Execute CAL CPT with single tower.
  • (7) If any TKR CPT scripts run into the large
    datagram problem, execute them single tower.

2
LAT IT System Test Hit List
Action Responsible
1 Complete TKR CPT troubleshooting E. Grove/G. Haller
2 Run ACD CPT L. Miller
3 Remove EPU1 for RAD 750 Inspection L. Manger
4 Complete FSW updates for B0-6-5 JJ Russell
5 Complete CCB for B0-6-5 Environment K. Fouts
6 Run CAL ACD CPT B. Grist