Title: SSEC Agenda Suggestions


1
SSEC Agenda Suggestions
Preparations for SSEC2at Cape TownBob
Preston
2
SSEC Agenda Suggestions
  • More time should be spent at SSEC meetings on
    crucial SKA issues
  • Too large a fraction of time is spent on
    informational and administrative matters
  • How about adding an additional discussion day
    before each meeting?
  • SSEC members would feel development of the SKA
    was being examined and monitored in sufficient
    depth
  • Too late to change usual 2-day meeting at Cape
    Town, but maybe larger fraction of agenda can be
    devoted to these issues
  • Two possible focus issues for Cape Town meeting
  • SKA-mid timeline
  • SKA program structure

3
SKA-mid Timeline Discussion
  • Current SKA-mid timeline thought to be very
    optimistic by many SSEC members (although latest
    version is improved)
  • Aggressive project schedules are usually good in
    the selling phase
  • But unrealistic schedules can hurt a projects
    credibility
  • Important to have solid international timeline
    for U.S. decadal survey
  • SSEC discussion suggestion
  • Lengthy session on SKA timeline at Cape Town
  • Focus on items that limit progress irrespective
    of available funding
  • Realistic funding constraints over time also
    important, so SSEC members should prepare
    prognosis for funding in their regions
  • Compare to experience on other large scale
    projects
  • Plan session months in advance so adequate
    preparation time
  • Goal Generate consensus view of SKA timeline
    that entire SSEC could support

4
Current SKA Timeline
Phase 1 funding approval
Phase 2 funding approval
SKA-midlow Complete
Site Select
Reference Design selected
Phase 1 complete
Preliminary SKA specs
Prod. Readiness Review
External Engineering Review of design
Sites short-listed
Early Science SKA midlow
SKA Operations
Pathfinder science
06 08 10 12 14 16 18 20
22 24
System Design
Full SKA mid low construction and commissioning
Concept Design
Phase 1 Prod. Eng. Tooling
Phase 1 Construction
SKA-high Construction
Pathfinder Suite Construction
System design SKA-hi
Concept design for SKA-high
5
SSEC Discussion on SKA Program Structure
  • There are many fundamental unresolved questions
    about the overall structure of SKA program
  • Many such questions are not discussed often or
    deeply enough by SSEC
  • Difficult for SSEC members to determine if SKA is
    on best development course
  • SSEC discussion suggestion
  • Lengthy session at Cape Town and all subsequent
    SSEC meetings on these topics
  • A draft list of possible topics was already
    circulated to SSEC
  • Decide on final list well before Cape Town to
    allow SSEC members, SPDO, and SWG sufficient time
    to develop supporting material
  • Two options for Cape Town meeting (or combination
    of options)
  • Brainstorming session on set of topics
  • Frank discussion of various points of view (no
    public minutes)
  • Reaching conclusions not critical - but should
    identify routes to reaching answers
  • Focused discussion on one or more issues - with
    more in-depth preparation

6
Examples of SKA Program Issues
  • SKA-general
  • What are the best estimates of funding source
    amounts, timing, and restrictions on use?
  • What can be done to improve international
    cohesiveness of SKA program?
  • Is the operational phase affordable?
  • How do we achieve an open-sky policy?
  • SKA-mid
  • Will limits on funding and technology prevent
    transformational science?
  • What is a realistic assessment of FOV expansion
    maturity and cost?
  • Should SKA-mid be designed for targeted as well
    as survey investigations?
  • Is Phase 1 sellable?
  • SKA-low - What is the international SKA projects
    role?
  • SKA-high
  • What can be done to keep some focus on planning
    for this instrument?
  • What is the process for identifying
    scientifically and politically viable sites?