NSD Update - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

NSD Update

Description:

Two meetings: Rare Isotope Summer School, JUSEIPEN ... New Hires. RHIC Low Energy Scan. Medium Term. Physics with HFT, ALICE. Long Term. EIC, or... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 27
Provided by: jamess81
Category:
Tags: nsd | scan | update

less

Transcript and Presenter's Notes

Title: NSD Update


1
NSD Update
  • James Symons 9/14/09

2
88-Inch Cyclotron / Accelerator Based Nuclear
Science News
  • Element 114 Confirmation
  • Fixed Vacuum Leak in D - July 2009
  • 1.88m ARRA Funding
  • Move to different RF Tube
  • Intensity Upgrade with new Injection System
  • Signature of Extension of MOA through 2015
    Imminent
  • GRETINA Installation has started in Cave 4C
  • Capital equipment (900k)
  • DOE and MSU signed cooperative agreement to build
    FRIB (completion around 2017/18)
  • Two meetings Rare Isotope Summer School,
    JUSEIPEN

3
Historic Repair of 88-Inch Cyclotrons Suspended
Two-Ton Cover Plate By Jim Morel 7/31/09
4
88-Inch Cyclotron / Accelerator Based Nuclear
Science News
  • Element 114 Confirmation
  • Fixed Vacuum Leak in D - July 2009
  • 1.88m ARRA Funding
  • Move to different RF Tube
  • Intensity Upgrade with new Injection System
  • Signature of Extension of MOA through 2015
    Imminent
  • GRETINA Installation has started in Cave 4C
  • Capital equipment (900k)
  • DOE and MSU signed cooperative agreement to build
    FRIB (completion around 2017/18)
  • Two meetings Rare Isotope Summer School,
    JUSEIPEN

5
System Assembly
  • Started at the 88 Cyclotron

Support structure in Cave 4C
6
88-Inch Cyclotron / Accelerator Based Nuclear
Science News
  • Element 114 Confirmation
  • Fixed Vacuum Leak in D - July 2009
  • 1.88m ARRA Funding
  • Move to different RF Tube
  • Intensity Upgrade with new Injection System
  • Signature of Extension of MOA through 2015
    Imminent
  • GRETINA Installation has started in Cave 4C
  • Capital equipment (900k)
  • DOE and MSU signed cooperative agreement to build
    FRIB (completion around 2017/18)
  • Two meetings Rare Isotope Summer School,
    JUSEIPEN

7
Challenges
  • Short term
  • Get VENUS Running
  • Prepare for GRETINA RUN in 2011
  • Reinvigorate Trapping Program
  • Medium term
  • Heavy Element Upgrade
  • Injection AIP Project
  • BGS Focal plane gas stopper
  • Detector Upgrades
  • Long Term
  • Replacement of the 88

8
Small Digression
  • Sometimes you get what you ask for, although it
    may take a little longer than expected
  • 2001 NSAC Long range plan laid out a broad vision
    for the field important questions, big plans
  • 2001
  • RIA 1BN 2012
  • Jlab 12GeV Upgrade 160M 2008
  • DUSEL 130M 2009
  • RHIC II 100M 2010
  • (eRHIC) circa 2015

9
Small Digression
  • Sometimes you get what you ask for, although it
    may take a little longer than expected
  • 2001 NSAC Long range plan laid out a broad vision
    for the field important questions, big plans
  • 2001 2009
  • FRIB 1BN 2012 550M 2018
  • Jlab 12GeV Upgrade 160M 2008 350M 2014
  • DUSEL 130M 2009 gt1B 2017
  • RHIC II 100M 2010 80M 2014
  • (eRHIC) circa 2015 After 2020

10
Drivers for Accelerator-based LENP program in
next 8 years
  • FRIB Construction
  • FRIB Instrumentation
  • Isotope Production Program

11
Neutrinos, etc.
  • DUSEL Progress
  • Project Office on Campus
  • NSF S4 Awards
  • DIANA
  • Majorana
  • CUORE
  • Prototype Crystals look great
  • CD2/3 imminent
  • KamLAND
  • Purification for Solar Neutrino Phase going well
  • DUSEL Science Report

12
Solving the Solar Neutrino Problem
SNO 1 kton D2O water Cherenkov 6 kmwe overburden
KamLAND 1 kton mineral oil scintillation 3 kmwe
overburden
13
Solar Physics with Neutrinos
14
(No Transcript)
15
Challenges
  • Short Term
  • Data taking for Kamland Solar Phase
  • CD-1 for Majorana Demonstrator Project
  • Start Construction Phase of CUORE
  • Medium Term
  • CUORE
  • Technical design of DIANA
  • Demonstrator at Sanford Lab
  • Long Term
  • DUSEL Experiments

16
Another Digression
  • If DUSEL goes ahead, it will be focus of activity
    for US groups
  • Long baseline neutrino experiments
  • Dark Matter Searches
  • Neutrinoless double-beta decay
  • Nuclear Astrophysics
  • . . .

17
Nuclear Theory News
  • Spin Workshop
  • New Arrival - Wick Haxton, Joint Appointment with
    UCB
  • Submitted materials for DOE Program Review
  • Submitted two topical center proposals
  • Quantitative Jet and Electromagnetic Tomography
    (JET) of Extreme Phases of Matter in Heavy-ion
    Collisions,
  • XN Wang, B Mueller, PIs
  • Nuclear Physics and Nuclear Astrophysics through
    high performance computing
  • W. Haxton, G. Fuller PIs

18
Challenges
  • Short Term
  • Catching their breath
  • Medium Term
  • Topical Center(s)
  • Long Term
  • Computational End Station

19
RNC News
  • Long polarized proton run completed, including
    first data at 500Gev
  • DOE/BNL proceeding with Heavy Flavor Tracker
  • Four calorimeter modules installed in ALICE
  • Interviews for open positions

20
(No Transcript)
21
RNC News
  • Long polarized proton run completed at RHIC,
    including first data at 500Gev
  • DOE/BNL proceeding with Heavy Flavor Tracker
  • CD1 Review in November
  • Four calorimeter modules installed in ALICE
  • 4/11 of Calorimeter for first running
  • Scientific case for additional modules
  • Interviews for open positions

22
Challenges
  • Short term
  • ALICE Computing at PDSF and LLNL
  • New Hires
  • RHIC Low Energy Scan
  • Medium Term
  • Physics with HFT, ALICE
  • Long Term
  • EIC, or

23
(No Transcript)
24
Challenges
  • Short term
  • ALICE Computing at PDSF and LLNL
  • New Hires
  • RHIC Low Energy Scan
  • Medium Term
  • Physics with HFT, ALICE
  • Long Term
  • EIC, or

25
Digression
  • Directors Review Report is on its way
  • Divisions Program Outstanding
  • Observation
  • Spread rather thin
  • Recommendations
  • New Chemistry faculty
  • New Staff in Low Energy

26
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com