Guide to Beehive Roundabout - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Guide to Beehive Roundabout

Description:

Provides access to key health care, employment and education in the area ... Study identified capacity and lane discipline problems on stretch of carriageway ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 16
Provided by: twi59
Category:

less

Transcript and Presenter's Notes

Title: Guide to Beehive Roundabout


1
Guide to Beehive Roundabout Highway Improvements
November 2009
2
Guide to Beehive Roundabout Highway Improvements
  • Importance of Haslingden Road Corridor
  • Key strategic route into Blackburn from the M65
    Motorway
  • Provides access to key health care, employment
    and education in the area
  • Royal Blackburn Hospital, Shadsworth Business
    Park, Local Primary and Secondary Schools
  • Number of planned future developments along the
    corridor

3
Guide to Beehive Roundabout Highway Improvements
  • Existing Problems and Challenges
  • High levels of tidal congestion during peak
    travel periods
  • High levels of delay northbound to Beehive
    Roundabout in AM period
  • High levels of delay southbound to Guide
    Roundabout in the PM period
  • Associated delay on M65 Off-slips, queues extend
    back to mainline carriageway
  • Results in significant delays on side arms along
    the
  • corridor

4
  • Whats already been achieved
  • www.sharedwheels.co.uk
  • Improved transport links with the hospital and
    the town centre
  • Developed information material to promote public
    transport to the hospital
  • Development of National Cycle Route 6

5
Guide to Beehive Roundabout Highway Improvements
6
Guide to Beehive Roundabout Highway Improvements
Traffic Queuing AM Peak Period
Royal Blackburn Hospital
Beehive
Guide
Key Queue
7
Guide to Beehive Roundabout Highway Improvements
Traffic Queuing PM Period
Royal Blackburn Hospital
Beehive
Guide
Key Queue
8
Guide to Beehive Roundabout Highway Improvements
Existing M65 to Beehive AM Peak Hour Average
Journey Times
AM Northbound 2.5 Minutes
9
Guide to Beehive Roundabout Highway Improvements
Existing Grimshaw Park to Guide PM Peak Hour
Average Journey Times
PM Southbound 14.5 Minutes
10
Guide to Beehive Roundabout Highway Improvements
  • Haslingden Road Corridor Transport Study
  • Detailed transport study undertaken to identify
    problems and issues along the corridor
  • Study identified capacity and lane discipline
    problems on stretch of carriageway between Guide
    and Beehive roundabouts
  • Lack of capacity and lane merging causes queues
    to block back along the corridor during peak
    periods
  • Detailed microsimulation traffic model of
    corridor developed to test different improvement
    options

11
Guide to Beehive Roundabout Highway Improvements
12
Guide to Beehive Roundabout Highway Improvements
Preferred Improvement Option
13
  • PARAMICS Model Videos
  • AM Base Vs AM Do Something (Preferred Option)
  • PM Base Vs PM Do Something (Preferred Option)

14
Guide to Beehive Roundabout Highway Improvements
  • Improvement Scheme Benefits
  • Before After Time Saving
  • AM Northbound 2.5 minutes 2 minutes 30 seconds
  • (M65 to Beehive Roundabout)
  • PM Southbound 14.5 minutes 5 minutes 9.5 minutes
  • (Grimshaw Park to Guide Roundabout)
  • Reduced queuing on approach to approaches to
    Guide roundabout, and on the M65 off-slips
    during the AM peak period
  • Reduced southbound delay on the approach to
    Guide Roundabout in PM peak period improving
    side road access
  • New controlled crossing to improve safety for
    pedestrians and reduce severance providing
    improved access to bus stops

15
Guide to Beehive Roundabout Highway Improvements
Thank you
Write a Comment
User Comments (0)
About PowerShow.com