Title: Guide to Beehive Roundabout
1Guide to Beehive Roundabout Highway Improvements
November 2009
2Guide to Beehive Roundabout Highway Improvements
- Importance of Haslingden Road Corridor
- Key strategic route into Blackburn from the M65
Motorway - Provides access to key health care, employment
and education in the area - Royal Blackburn Hospital, Shadsworth Business
Park, Local Primary and Secondary Schools - Number of planned future developments along the
corridor
3Guide to Beehive Roundabout Highway Improvements
- Existing Problems and Challenges
- High levels of tidal congestion during peak
travel periods - High levels of delay northbound to Beehive
Roundabout in AM period - High levels of delay southbound to Guide
Roundabout in the PM period - Associated delay on M65 Off-slips, queues extend
back to mainline carriageway - Results in significant delays on side arms along
the - corridor
4- Whats already been achieved
- www.sharedwheels.co.uk
- Improved transport links with the hospital and
the town centre - Developed information material to promote public
transport to the hospital - Development of National Cycle Route 6
5Guide to Beehive Roundabout Highway Improvements
6Guide to Beehive Roundabout Highway Improvements
Traffic Queuing AM Peak Period
Royal Blackburn Hospital
Beehive
Guide
Key Queue
7Guide to Beehive Roundabout Highway Improvements
Traffic Queuing PM Period
Royal Blackburn Hospital
Beehive
Guide
Key Queue
8Guide to Beehive Roundabout Highway Improvements
Existing M65 to Beehive AM Peak Hour Average
Journey Times
AM Northbound 2.5 Minutes
9Guide to Beehive Roundabout Highway Improvements
Existing Grimshaw Park to Guide PM Peak Hour
Average Journey Times
PM Southbound 14.5 Minutes
10Guide to Beehive Roundabout Highway Improvements
- Haslingden Road Corridor Transport Study
- Detailed transport study undertaken to identify
problems and issues along the corridor - Study identified capacity and lane discipline
problems on stretch of carriageway between Guide
and Beehive roundabouts - Lack of capacity and lane merging causes queues
to block back along the corridor during peak
periods - Detailed microsimulation traffic model of
corridor developed to test different improvement
options
11Guide to Beehive Roundabout Highway Improvements
12Guide to Beehive Roundabout Highway Improvements
Preferred Improvement Option
13- PARAMICS Model Videos
- AM Base Vs AM Do Something (Preferred Option)
- PM Base Vs PM Do Something (Preferred Option)
14Guide to Beehive Roundabout Highway Improvements
- Improvement Scheme Benefits
- Before After Time Saving
- AM Northbound 2.5 minutes 2 minutes 30 seconds
- (M65 to Beehive Roundabout)
- PM Southbound 14.5 minutes 5 minutes 9.5 minutes
- (Grimshaw Park to Guide Roundabout)
- Reduced queuing on approach to approaches to
Guide roundabout, and on the M65 off-slips
during the AM peak period - Reduced southbound delay on the approach to
Guide Roundabout in PM peak period improving
side road access - New controlled crossing to improve safety for
pedestrians and reduce severance providing
improved access to bus stops
15Guide to Beehive Roundabout Highway Improvements
Thank you