Activities on B3G in China - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Activities on B3G in China

Description:

Manufactures, Universities, Research Institutes... MOST. MII. Wireless. Committee. JEG ... B3G research in CCSA. In line with ITU work plan ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 12
Provided by: YB1
Category:
Tags: b3g | activities | china | study | time

less

Transcript and Presenter's Notes

Title: Activities on B3G in China


1
Activitieson B3G in China
  • Wan Yi
  • Director
  • Radio and Mobile Communication Department
  • Institute of Communication Standards Research

2
Main contents
  • Organization Structure
  • CCSA TC5 Activity
  • Service and Market
  • Spectrum for B3G
  • FuTURE
  • New Technology
  • International cooperation

3
Research Structure of B3G in China
MOST
MII
  • RD
  • Standardization
  • Spectrum
  • Service/Market

CCSA
Wireless Committee
JEG
4
Research Activity on Beyond 3G
  • FuTURE project is focus on Beyond 3G
  • A new B3G WG was set up in April 2004 in the
    Wireless Technical Committee of CCSA
  • One of key fields of the strategic study in CCSA
  • Joint Expert Group (JEG) between CCSA and FuTURE
    Project was set up in August 2002
  • Participated ITU-R WP8F and ITU-T SSG(SG19)
    activity from the beginning

5
B3G research in CCSA
  • In line with ITU work plan
  • Research on Services/market, Spectrum, Key
    technologies research of Beyond 3G.
  • Research on evolution path from 3G to B3G
  • Core Network
  • Radio Access Network
  • Service

6
Vision (Draft) From Network Aspect
7
Vision (Draft) From User Aspect
8
Service and Market
  • Several contribution have been sent to WP8F
  • Service Survey
  • Send the response to Geneva meeting
  • Many Local Company participate in the
    Contribution
  • Sharing Information with Japan and Kerea
  • IMT.Market
  • IMT.Service

9
Spectrum
  • Spectrum Calculation Methodology
  • Many Contribution have been sent to 8F
  • Time and Region weighting factor Flow Chat
  • Quality of service (QoS)
  • Spectrum Calculation
  • A Group has been Set up
  • Candidate Spectrum
  • Prepare Contribution to Next 8F meeting

10
International Cooperation
  • CJK-B3G
  • WWRF
  • WINNER

11
Thanks!
Write a Comment
User Comments (0)
About PowerShow.com