Authors: - PowerPoint PPT Presentation

About This Presentation
Title:

Authors:

Description:

Only change from previous draft is inclusion of appendix to show interesting ... Accelerate stress on Control Plane via Instability Conditions ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 6
Provided by: spore
Learn more at: http://www.ietf.org
Category:

less

Transcript and Presenter's Notes

Title: Authors:


1
Terminology for BenchmarkingCore Router
Accelerated Life Testing(draft-ietf-bmwg-acc-benc
h-term-00.txt)
  • Authors
  • Scott Poretsky, Avici Systems
  • Shankar Rao, Qwest Communications
  • Ray Piatt, Cable and Wireless

57th IETF Meeting Vienna
2
Status Update
  • draft-ietf-bmwg-acc-bench-term-00.txt posted as
    official BMWG work item.
  • Only change from previous draft is inclusion of
    appendix to show interesting White Box benchmarks
  • Minimum Available Memory
  • Maximum CPU Utilization
  • Now working draft-ietf-bmwg-acc-bench-meth-00.txt
  • Startup and In-situ methodologies covered
  • May drive changes to Terminology draft

3
Test Setup
  • Router Configuration
  • Data Plane
  • Line Cards/Interfaces
  • Security Plane
  • Traffic Forwarding with and without ACLs
  • Control Plane
  • Routing
  • BGP
  • IGP
  • MPLS
  • TE
  • L2/L3 VPNs
  • Management Plane
  • User Access
  • SNMP
  • Logging/Debug
  • Packet Statistics
  • Collection

BGP
Security Plane Module
Management Plane Module
OSPF
ControlPlane Module
Data Plane Module
LDP
PIM-SM
  • Instability Conditions
  • Interface Shutdown Cycling Rate
  • BGP Route Flap Rate
  • IGP Route Flap Rate
  • Route Convergence Due to Better Next-Hop
  • LSP Reroute Rate

. . .
4
General Methodology
  • Enable and scale all features simultaneously
  • Monitor all Planes
  • Accelerate stress on Control Plane via
    Instability Conditions
  • all features - including feature monitored
  • Failure when
  • Control Plane Session Lost
  • Data Plane Misrouted, lost, or reordered packet
  • Management Plane Denial of Access
  • Security Plane Incorrect permitted/denied
    packet
  • Pass when Success Threshold reached and no
    failures observed
  • Reporting format to be provided
  • Features enabled
  • Scaling values
  • Stress rates

5
Next Steps
  • Submit Methodology Draft 00
  • Include Reporting Format
  • Include Procedures
  • Submit Terminology Draft 01
  • Add new terms including
  • Success Threshold
  • Control Plane Failure
  • Data Plane Failure
  • Management Plan Failure
  • Security Plane Failure
  • Incorporate comments from mailing list
Write a Comment
User Comments (0)
About PowerShow.com