Transcript and Presenter's Notes

Title: MRS, TEST STAND, EXTRUDER NEWS Victor Rykalin


1
MRS, TEST STAND, EXTRUDER NEWSVictor Rykalin

2
MRS inside !
  • 8 channels (2 spare) has been delivered from
    CPTA Moscow Russia.
  • The needed documentation is in hands.
  • The tests are on the way (at FNAL).
  • After the new test stand set up at NICADD NIU the
    RD with MRS will be continued.

3
MRS parameters
4
Status of the new test stand.
  • Two crates (NIM, CAMAC) and some of the necessary
    modules has been shipped to lab. 6 from PREP
    FNAL.
  • The vital modules (ADC and GRIB controller ) are
    not available at FNAL at this time.
  • FSU agreed to lend parts till the March of 2004.
  • The person responsible for the new test stand has
    to proceed with material move request and so on.
  • What kind of software are we going to use ?

5
Current activity
  • Extruder is up with 21 die (November 4 first
    run for the ME department after long
    interruption). Will be continued on Thursday. A
    new motor for the loader has been installed and
    tested. A new polymer coating of the hopper.
    Problem still exist.
  • The PO for 1500 (Viscosity vs shear rate
    dependence measurements, first set) has been
    send.
  • The meeting between Gary Teafoe, Mike Roman and
    ME department has been organized ( to clarify the
    set of measurements on the 21 cm die ).
  • The comparative measurements of the BC 404, BC
    408, FNAL extrusion( Ru 106 and cosmic bulk
    measurements ) work is in progress. For this
    purpose I am using the NICADD made test stand.
  • Working with Dmitry on photosensors.
  • New (old) PMTsdividers have been spotted at
    lab.6 and tested. Two trigger counters have been
    assembled. There is a hope that patient (trigger)
    will be back to normal life.

6
The problems and their curing.
  • Nitrogen line
  • Delay with ALICE tests (due to the 21 die
    running)
  • a new hopper
  • Talk to Jerry Blazey.
  • To switch die as soon as possible and start with
    10 holes die without pins.
  • The decision should be taken (FNAL or other
    vendor or NIU).

7
A plan for the next two weeks.
? To make happy ME DEP. with all parameters they
need for the simulations. ? Proceed with
preliminary MRS tests at FNAL. ? ?1NIM paper
(proceed with some additional measurements of the
scintillator bulk). ? ?Probable run for the
ALICE.