AAM Roadmap Guidelines for Use - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

AAM Roadmap Guidelines for Use

Description:

Quotes of unreleased products must be approved by the BF/AAM CET. ... Alarm & Event Data Collection, Analysis and Benchmarking -AEA ... – PowerPoint PPT presentation

Number of Views:83
Avg rating:3.0/5.0
Slides: 13
Provided by: paulvel
Category:

less

Transcript and Presenter's Notes

Title: AAM Roadmap Guidelines for Use


1
AAM Roadmap - Guidelines for Use
? Please remove this slide before presenting.
  • This PPT is for internal use only. Information on
    this pink background is in planning, and should
    be presented as Preliminary date and content
    subject to change.
  • Quotes of unreleased products must be approved by
    the BF/AAM CET.Submit RQUPs at
    http//go.honeywell.com/rqup
  • This is the Advanced Alarm Management Roadmap. It
    is intended to provide customers with an insight
    into Honeywells direction for technology
    investments. Roadmaps are not to be used to make
    customer project commitments. Be sure to check
    the slide Notes for more information!
  • Use this roadmap only during the time frame
    indicated.
  • The latest roadmap is posted on the Employee Only
    pages under Products A-Z gt Alarm Management
    http//www.honeywell.com/ps
  • For more information on a particular product,
    please refer to the Employee Only pages.

- Indicates planned ship date. Note Actual ship
dates are subject to availability of product in
Manufacturing at the time an order is
received. - Indicates an intended function,
targeted for the time frame indicated. Actual
functional content and time frame are subject to
change.
2
Advanced Alarm Management Roadmap
Paul Vellacott 27th October 2009
CAUTION The following presents forward looking
plans that are subject to modification based on
many factors, including changing economic and
business conditions. These plans are not final
and may be modified or abandoned at any time.
The information in this presentation is provided
under the terms of a non-disclosure agreement
3
Advanced Alarm Management Suite (AAM)
  • Alarm Event Data Collection, Analysis and
    Benchmarking -AEA
  • Static reports for the regular audience
  • Dynamic analysis aids documentation/rationalisati
    on efforts
  • Management of Change
  • Alarm Documentation Rationalisation -ACM
  • Context Sensitive Operator Alarm Help -ACM
  • Audit Enforcement of Alarm Settings - ACM
  • Including Load Control
  • Mode Based Alarm Handling (dynamic configuration
    settings) -ACM
  • Boundary Management -ACM
  • Operate within the constraints of the plant
  • Alerts offload alarm system -UserAlert

4
AAM Roadmap
  • AAM Suite
  • ACM
  • AEA
  • UserAlert
  • OM Pro
  • AAM
  • BF Ops Management
  • Event Analyst

GUSPro Change to AAM Suite orDe-bundle
5
AAM 310 New Features
  • Advanced Alarm Management 310
  • Multiple Enterprise Models
  • Support Assets with same item name but in
    different branches
  • Support for BMA 320 Tags Power Function Blocks
  • More Direct upgrade from R300 to R310TPS R533 and
    earlier
  • Fixes to some AEA Reports
  • AEA allows manual Close Open Alarms
  • UA Server Configuration Utility mod
  • OPC Cache Reads or Device Reads
  • Now comes with an AAM Install guide
  • Supplements ACM, UA, AEA Install guides

Define Asset Model location at ACM control system
configuration
Consistent use of asset model
Continued support for Experion updates
6
AAM 320 Scope (4Q 2010 release)
Not committed. Subject to change without notice.
  • General Themes
  • Functional release
  • Experion Integration
  • Lower cost to implement and maintain
  • OM Pro 320 (BF 230 AAM 320)
  • New Control System qualification
  • Experion 400
  • TPN 682
  • TPS 420
  • Supported Platforms
  • PHD 210, 215, 300
  • Business Objects ?
  • Windows 2003, 2008 Server
  • Windows XP, Vista, Windows 7
  • SQL Server 2008

ACM drops Oracle support. Provide migration to
SQL.
7
AAM 320 Scope (4Q 2010 release)
Not committed. Subject to change without notice.
  • Advanced Alarm Management 320
  • ACM 320
  • Automated Update Process for Experion
  • Automated Update Process for TPS
  • Experion ACM Alarm Help Integration, ACM
    components only
  • BMA Support extensions
  • Improved scheduled enforcements
  • Improved mode based alarming
  • Move variables between consoles
  • Bulk delete of variables constraints
  • Restrict Operator disable alarm
  • Additional alarm related parameters
  • Improved recovery from ACM Enforcer Server
    outages
  • Variable (tag) based user defined documentation
    fields
  • Minor enhancements / PAR fixes
  • UserAlert 320
  • Minor enhancements / PAR fixes

Tag synchronisation, ie new, deleted, modified
tags. Similar to existing PHD tag synch process.
Requires Experion development work scheduled for
R410. Alarm Help UI will be Experion with data
sourced from ACM.
8
AAM Platform Support
See AAM specification sheet for full details
Subject to change
9
AAM Control System Support
See AAM specification sheet for full details
Subject to change
10
Event Analyst
  • Event Analyst (TPS) 130.4
  • Support for PHD 210
  • Separate Oracle DB
  • PHD double precision data type
  • EA R130.3 required for PHD R202

Complies with PHD application requirements
  • Event Analyst (TPS) 130.5
  • Support for PHD 215
  • Oracle 10g
  • Event Analyst (TPS) 130.6 (1Q 2010)
  • Support for PHD 300
  • SQL Server 2008
  • PHD 300 security

11
GUSPro
  • Last GUSPro release was R200 (ACM 200, UA 200, EA
    130)
  • Move forward by de-bundle or migrate to AAM
    Suite
  • Experion TPS customers with GUSPro?
  • Event Analyst now in Experion Trend with Events
  • ProMenu replaced by Experion shortcut menus
  • ProTrend replaced by Experion trending
  • What is left? ACM and UserAlert.
  • Does GUSPro make sense here?
  • TPS customers with GUSPro?
  • ProMenu/ProTrend now standard with GUS R360
    onwards - on CD
  • Customers can de-bundle into ACM, UserAlert,
    Event Analyst, PHD, EJC
  • OR migrate to AAM Suite (ACM, UserAlert, AEA)
  • Third party license fee for Crystal reports must
    be paid.
  • Contact Paul Vellacott for further details and
    ordering process.

12
2010 and Beyond
Not committed. Subject to change without notice.
  • Working on a major revamp of all L4 applications
  • Business FLEX (excluding BMA), OptiVision, POMS,
    AAM,
  • New applications will be developed on the new
    architecture
  • Migration will be provided for old applications
  • Existing products at end of line
  • Some old products will be dropped
  • Multi-year program, with hybrid releases for a
    few years
  • Web services and consistent platforms will permit
    interoperability

13
www.honeywell.com/ps
Write a Comment
User Comments (0)
About PowerShow.com