Title: Order 693 Compliance


1
(No Transcript)
2
Order 693 Compliance
LTTIWG Conference Call
December 14, 2007
3
Order 693 Paragraph 1051
  • The Commission directs the ERO, through the
    Reliability Standard development process, to
    modify FAC-012-1 and any other appropriate
    Reliability Standards to assure consistency in
    the determination of TTC/TFC for services
    provided under the pro forma OATT, and requires
    that those processes be the same as those used in
    operation and planning for native load and
    reliability assessment studies. Changes to the
    process of calculating TTC are appropriate if
    implementation is coordinated with revisions to
    the other applicable operating or planning
    standards. We acknowledge that reliability
    regions have historically calculated transfer
    capability using different approaches, and we
    agree that regional differences should be
    respected.336 However, as already discussed above
    regarding ATC, TTC requirements will be
    determined in the ERO Reliability Standards
    development process, and any request for a
    regional difference from the Reliability
    Standards must take place through the ERO
    process.
  • 336 For example, WECC has a documented open
    process for establishing TTC for the Western
    Interconnection.

4
Ralph Honeycutt Questions
  1. What changes or modifications has the ICT
    contemplated to comply with paragraph 1051 of
    Order 693, which requires consistency in the
    determination of TTC/TFC for services provided
    under the pro-forma OATT, and requires that those
    processes be the same as those used in operation
    and planning for native load and reliability
    assessment studies.? emphasis added

5
Ralph Honeycutt Questions
  1. I do not recall this specific paragraph being
    specifically discussed as to what changes the ICT
    and Entergy are considering.  Perhaps this issue
    needs to be discussed at the next LTTIWG/NTTIWG
    meeting.  It seems that any changes may need to
    be reflected in the tariff.

6
ICT / Entergy Response
We do not believe any changes currently are
required.  However, we are awaiting NERC's
resolution of this requirement in FAC-012-1 and
related standards, at which point Entergy and the
ICT will review the current Entergy processes to
assure consistency with the requirements that are
put in place.