Title: Plant Engineering
1Plant Engineering Programs
Presented by Duane Phleger, Manager Plant Engineering Programs APP Site Visit October 30 November 4, 2006
2Plant Engineering Programs Review Agenda
- Purpose
- Goals
- Engineering Programs Listing
- Engineering Programs Review
3Purpose- Engineering Programs
- Promote and coordinate engineering programs to
assist with the reliable, efficient, and safe
operation of the fossil and hydro generating
fleet units
4Goals- Engineering Programs
- Identify engineering programs based on cost
benefit that will safely improve the reliability
and efficiency of the units - Initiate the implementation of identified
engineering programs and coordinate with plant
staff and Engineering Services personnel to
assure the programs are functional - Assist in the evaluation of the programs and
benefits to identify savings, reliability
improvements, and efficiency improvements
5Engineering Programs Listing
- Preventive/Predictive Maintenance (PM/PdM)
Programs - Plant Reliability Optimization (PRO) Process
- Generation Performance Team
- Cycle Equipment Optimization
- High Pressure Heater and Condenser Program
- Boiler Reliability Optimization (BRO)Program
- Critical Piping Program
- Electrical Equipment Optimization Program
- Rotating Equipment Optimization Program
- Civil Engineering Programs
- Material Handling Review
6PM/PdM Program
- Goals
- Improve unit reliability, efficiency and safety
through maintenance efficiency using PM/PdM - Increase the ratio of PM/PdM hours to corrective
maintenance hours to reduce equipment down time - Reduce maintenance costs
- Improve communication
- Foster system consistency
- Identify benefits- CBA
7PdM Tools
- Vibration Analysis
- Thermography
- Ultrasonics
- Electromagnetic Interference (EMI) Monitoring
- Operator rounds and observation with AutoTour
- Fleetwide Monitoring
8Plant Reliability Optimization (PRO) Process
- Assessment/Workshop
- Implementation Plan
- Reliability Basis Development
- Condition Based Maintenance Development
- Work Control (PaSTA)
- Continuous Improvement
9Generation Performance Team
- Sponsor-Mark McCullough
- Team lead- Barry Rederstorff Coordinator- Kim
Stalnaker - Core team- PEP, Engineering Services, Region
Engineering, Plant Personnel - Action plan developed
- Expectation- reduce system heat rate and improve
performance to reduce costs and gain back
generation - Website developed
- Communication and Training
10Cycle Equipment Optimization
- Identify cycle equipment that may impact unit
reliability and efficiency - Equipment examples
- HP Heaters
- Expansion joints
- Valves and pumps
- Condensers
- Develop teams as needed to incorporate applicable
engineering programs
11Boiler Reliability Optimization (BRO)
- Sponsor- Steve Burge
- Team Lead- Jerry Journey
- Identified priority areas to address
- Goals
- Ties to PRO - PM/PdM
- Goal of zero tube leaks in coal fleet by 2006
12Electrical Equipment Optimization
- Coordinators-Charlie Williams and Don Border
- Sponsor-Steve Burge
- Charter developed
- Equipment identification and prioritization top 4
systems - Generator
- Transformers
- Switchgear/starters
- Cables
- Busses and motors tied
- DC systems and Equipment protection
13Rotating Equipment Optimization
- Coordinator- Matt Crockett
- Sponsor- Bill Vineyard
- Core team
- Charter developed
- First project identified-Smart Signal test at
Amos U-3 - First phase complete with recommendations
- Closely aligned with the PM/PdM program
- Remote Monitoring Initiative
14Civil Engineering Programs
- Coordinators-Jeff Anderson/JT Davis
- Equipment identification and prioritization
- Cooling towers
- Stacks
- Circ water systems
- Bridges, dams, dikes
- Roofs and ductwork
- Equipment program identification and coordination
with ES and Plants
15Critical Piping Program
- Coordinators-Jeff Anderson/Donnie Robertson
- Core team
- Hanger system evaluation
- Flow Accelerated Corrosion (FAC)
- Life Fraction Expended (LFE)
- Circular Letter being developed
- Continuing Development
16Material Handling Review
- Coordinator- Don Border
- Equipment identification and prioritization
- Conveyors and belts
- Unloaders
- Tanks and piping
- Heavy moving equipment
17Plant Engineering Programs
Questions??