Title: Plant Engineering


1
Plant Engineering Programs
Presented by Duane Phleger, Manager Plant Engineering Programs APP Site Visit October 30 November 4, 2006
2
Plant Engineering Programs Review Agenda
  • Purpose
  • Goals
  • Engineering Programs Listing
  • Engineering Programs Review

3
Purpose- Engineering Programs
  • Promote and coordinate engineering programs to
    assist with the reliable, efficient, and safe
    operation of the fossil and hydro generating
    fleet units

4
Goals- Engineering Programs
  • Identify engineering programs based on cost
    benefit that will safely improve the reliability
    and efficiency of the units
  • Initiate the implementation of identified
    engineering programs and coordinate with plant
    staff and Engineering Services personnel to
    assure the programs are functional
  • Assist in the evaluation of the programs and
    benefits to identify savings, reliability
    improvements, and efficiency improvements

5
Engineering Programs Listing
  • Preventive/Predictive Maintenance (PM/PdM)
    Programs
  • Plant Reliability Optimization (PRO) Process
  • Generation Performance Team
  • Cycle Equipment Optimization
  • High Pressure Heater and Condenser Program
  • Boiler Reliability Optimization (BRO)Program
  • Critical Piping Program
  • Electrical Equipment Optimization Program
  • Rotating Equipment Optimization Program
  • Civil Engineering Programs
  • Material Handling Review

6
PM/PdM Program
  • Goals
  • Improve unit reliability, efficiency and safety
    through maintenance efficiency using PM/PdM
  • Increase the ratio of PM/PdM hours to corrective
    maintenance hours to reduce equipment down time
  • Reduce maintenance costs
  • Improve communication
  • Foster system consistency
  • Identify benefits- CBA

7
PdM Tools
  • Vibration Analysis
  • Thermography
  • Ultrasonics
  • Electromagnetic Interference (EMI) Monitoring
  • Operator rounds and observation with AutoTour
  • Fleetwide Monitoring

8
Plant Reliability Optimization (PRO) Process
  • Assessment/Workshop
  • Implementation Plan
  • Reliability Basis Development
  • Condition Based Maintenance Development
  • Work Control (PaSTA)
  • Continuous Improvement

9
Generation Performance Team
  • Sponsor-Mark McCullough
  • Team lead- Barry Rederstorff Coordinator- Kim
    Stalnaker
  • Core team- PEP, Engineering Services, Region
    Engineering, Plant Personnel
  • Action plan developed
  • Expectation- reduce system heat rate and improve
    performance to reduce costs and gain back
    generation
  • Website developed
  • Communication and Training

10
Cycle Equipment Optimization
  • Identify cycle equipment that may impact unit
    reliability and efficiency
  • Equipment examples
  • HP Heaters
  • Expansion joints
  • Valves and pumps
  • Condensers
  • Develop teams as needed to incorporate applicable
    engineering programs

11
Boiler Reliability Optimization (BRO)
  • Sponsor- Steve Burge
  • Team Lead- Jerry Journey
  • Identified priority areas to address
  • Goals
  • Ties to PRO - PM/PdM
  • Goal of zero tube leaks in coal fleet by 2006

12
Electrical Equipment Optimization
  • Coordinators-Charlie Williams and Don Border
  • Sponsor-Steve Burge
  • Charter developed
  • Equipment identification and prioritization top 4
    systems
  • Generator
  • Transformers
  • Switchgear/starters
  • Cables
  • Busses and motors tied
  • DC systems and Equipment protection

13
Rotating Equipment Optimization
  • Coordinator- Matt Crockett
  • Sponsor- Bill Vineyard
  • Core team
  • Charter developed
  • First project identified-Smart Signal test at
    Amos U-3
  • First phase complete with recommendations
  • Closely aligned with the PM/PdM program
  • Remote Monitoring Initiative

14
Civil Engineering Programs
  • Coordinators-Jeff Anderson/JT Davis
  • Equipment identification and prioritization
  • Cooling towers
  • Stacks
  • Circ water systems
  • Bridges, dams, dikes
  • Roofs and ductwork
  • Equipment program identification and coordination
    with ES and Plants

15
Critical Piping Program
  • Coordinators-Jeff Anderson/Donnie Robertson
  • Core team
  • Hanger system evaluation
  • Flow Accelerated Corrosion (FAC)
  • Life Fraction Expended (LFE)
  • Circular Letter being developed
  • Continuing Development

16
Material Handling Review
  • Coordinator- Don Border
  • Equipment identification and prioritization
  • Conveyors and belts
  • Unloaders
  • Tanks and piping
  • Heavy moving equipment

17
Plant Engineering Programs
Questions??