Title: Skeleton:%20Hardware%20Alignment%20for%20EMU%20meeting


1
Skeleton Hardware Alignment for EMU meeting
  • James N Bellinger
  • 15-Mar-2009

2
Things to add
  • Time estimates for repeating the work in May (and
    August)
  • Time estimates for work TBD
  • Transfer Lines
  • Barrel
  • Barrel to Endcap
  • Pix from Barrel progress
  • Stuff Ive forgotten in the skeleton

3
What we Have Now
  • Link on Plus side
  • Some Link on Minus (serious disk misalignment!)
  • Link to MABs
  • Z for ME2,3,4, ME-2,3,4, ME1/2
  • Z for ME1/3 about to be blessed
  • Some barrel numbers

4
Want pix of
  • Marcus chamber tilts, updated w/ ME1/3
  • Check
  • Illustrative barrel Z variation w/ field
  • Fit plots for ME1
  • Check
  • Fit plots for ME2
  • Check

5
Muon Endcap Hardware AlignmentPreliminary
Green Not blessed yet
lt?zME1/3gt -2.2 mm
Nominal CSC position
Nominal CSC position
CMS Side view
?
?
rglobal
?
?
?
?
lt?xgt 1.3mrad
?x 0
lt?xgt 3.9mrad
lt?xgt 3.7mrad
lt?xgt 3.4mrad
lt?xgt 3.5mrad
zglobal
?
?
lt?xgt 4.4mrad
lt ?xgt 4.4mrad
?
?
?
?
?
?
?x 0
lt?xgt 4.7mrad
lt?xgt 3.9mrad
lt?zME1/2gt -5.04 mm
lt?xgt 3.4mrad
lt?xgt 3.6mrad
lt?xgt 4.2mrad
lt?xgt 3.4mrad
lt?zME-1/2gt 5.94 mm
?
?
lt?zME2/1gt -12.58 mm
lt?zME-2/1gt 13.18 mm
lt?zME-3/1gt 12.60 mm
lt?zME-4/1gt 12.89 mm
lt?zME3/1gt -12.35 mm
lt?zME4/1gt -12.46 mm
lt?zME1/1gt -17.57 mm
lt?zME-1/1gt 16.73 mm
?
?
nom.
nom.
?
?
?
?
?
?
Pink Aligned by Tracker-Muon Link
system Blue Aligned by Muon Endcap Optical
System Red Not aligned yet
?
?
ME1/3,2/2,3/2 ?z-5 mm to IP globally
ME-1/3,2/2,3/2 ?z5 mm to IP globally
?
?
?
?
Not to scale
? Muon Endcap stations ?
ME2
ME3
ME4
ME-1
ME-2
ME-4
ME-3
ME1
6
ME2 SLM 2-5 in Z with 10 measurements at B0T
7
Laser hits on CCDs ME2 SLM 2-5 in Z at B0T
8
Distancemeter and dists
DCOPS dowels
Chamber surface estimates
RedReal GreenSim
ME12 ASPD
IR target
MAB ASPD
ASPD P4
Animated
9
In the pipeline
  1. Some X/Y information for ME/- separately
  2. Barrel muon
  3. ME-1
  4. Refit Endcap using relative X/Y info from step 1
  5. Proof of principle linking MAB with Endcaps via
    Transfer Lines

10
Hardware-dependant
  • Minus side Link
  • Disks so badly assembled that components couldnt
    talk to each other!
  • MAB DCOPS X/Y
  • End-to-end X/Y
  • Better care assembling disks
  • Requires some adjusting of the lasers

11
Order of Tasks for Endcap
  • Independent validation of data quality in all
    detectors
  • Stand-alone reconstruction of SLMs and Transfer
    Lines
  • When Link results are available Big Bang

12
Barrel HW Geom
Endcap HW Geom
Bi weekly MWGR
DT StandAlone m align
AR vs. TK
surveytracks dr correction
CSC align w/cosmics
Adjust LD-
Close CMS
Full Link Geom _at_ 0T
Full Barrel HW Geom _at_ 0T
Full Endcap HW Geom _at_ 0T
weekly MWGR
Integrated HW Geom _at_ 0T
CRUZET S w w/o tracker
CRAFTS
Full Link _at_ B3.8T
Full Barrel HW Geom _at_ B3.8T
Full Endcap HW Geom _at_ B3.8T
Integrated HW Geom _at_ 3.8T
Integrated HW track-based Geom
LHC dev.
DT align with CRAFT2 cosmics
CSC align with CRAFT2 cosmics
collisions
DT align with collision tracks
CSC align with collision tracks
13
Time Estimates
  • IFF
  • the disks were assembled with reasonable accuracy
    AND
  • there were no major hardware failures
  • THEN repeating the work with fresh data in May
    should be quickorder of a week or two (?)
  • Doing it again in August should be very much
    easier

14
But
  • Some tasks will be done for the first time in
    May Transfer Line inclusion, for example.