Construction Analysis during the Design Process - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Construction Analysis during the Design Process

Description:

Construction algoritms. Analysis by object name: ... Construction analysis ... Further development of: Construction method, Humen resources, Material resources ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 19
Provided by: dsArc
Category:

less

Transcript and Presenter's Notes

Title: Construction Analysis during the Design Process


1
Construction Analysis during theDesign Process
  • www.ddss.arch.tue.nl
  • Bauke de Vries

2
4D-CAD
  • Linking building components with construction
    activities
  • Manual task of the construction planner
  • Dedicated systems NavisWorks, 4D Suite,
  • Advantages Simulation, Visualization

3
Challenge
  • Automation of the planning process.
  • Advantages
  • Independency from the planner
  • Quick first concept plan

4
Implementation
5
Construction algoritms
  • Analysis by object name
  • Walls are bearing floors, colums are bearing
    beams, etc.

6
Construction algorithms
  • Analysis by object elevation
  • Object with a lower elevation is bearing an
    object with a higher elevation

7
Construction algorithms
  • Analysis by directed graph
  • Each object is a node in a connection graph.

8
Construction algorithms
  • Analysis by object adjacency
  • Each object is a node in a topological graph

9
Construction analysis
  • Object of anlysis

10
Construction analysis
  • Move down

Inleiding Oriëntatie Doelstelling van het
onderzoek De algoritmen Implementatie
Case Study Reactie uit het bedrijfsleven
Conclusie en Aanbevelingen Einde
11
Construction analysis
  • The green objects have an intersection in the
    vertical direction with the red object

Inleiding Oriëntatie Doelstelling van het
onderzoek De algoritmen Implementatie
Case Study Reactie uit het bedrijfsleven
Conclusie en Aanbevelingen Einde
12
Construction analysis
  • The red object has in intersection with the green
    objects in the horizontal direction

13
Construction analysis
  • Example
  • Objects adjacent to floor

14
Pilot study
15
Planning comparison
Real planning
Generated planning
16
Differences
  • Concurrency whenever possible
  • Unlimited resources
  • Construction method

17
Complete process
18
Experiences
  • Model preperation through clash detection
  • Generated planning 2 months longer than real
    planning over a a period of 1 ½ year
  • Suitable for a quick first guess
  • Further development of Construction method,
    Humen resources, Material resources