OVERVIEW OF ISIS ACCELERATOR VACUUM SYSTEMS AND THEIR VENTING - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

OVERVIEW OF ISIS ACCELERATOR VACUUM SYSTEMS AND THEIR VENTING

Description:

HV insulator. failure. Tuner failures. Synchrotron & EPB. High vacuum system built to UHV standards ... Construction material. Merlin Vacuum System. Merlin ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 19
Provided by: iop2
Category:

less

Transcript and Presenter's Notes

Title: OVERVIEW OF ISIS ACCELERATOR VACUUM SYSTEMS AND THEIR VENTING


1
OVERVIEW OF ISIS ACCELERATOR VACUUM SYSTEMS AND
THEIR VENTING
  • By Shaun Hughes

2
The ISIS Accelerator
The accelerator produces a beam of protons at an
energy of 800 MeV (84 speed of light) and pulsed
at 50 Hz. Average beam current is 200 ?A,
therefore 160 kW on target.
3
Linac Vacuum System
  • Total Volume
  • 48000 Litres
  • Operating Pressure
  • 1x10-6 mbar
  • Pumps
  • 31 x 1,000 l/s TMP 4x 20,000 l/s Polycold
    Cryo-coils
  • Valves
  • Large DN250 Gate Valves
  • Gauges Interlocks
  • TPG300 controller interfaced to a PLC
  • RGA
  • Satellite based system each with faraday cup
    detector and radiation resistant cable

4
(No Transcript)
5
(No Transcript)
6
Tank 2 Lid Liner Removed
  • Reason for venting
  • RF window failures
  • Water leaks
  • Air leaks
  • HV insulator failure
  • Tuner failures

7
(No Transcript)
8
Synchrotron EPB
  • High vacuum system built to UHV standards
  • Built to be highly reliable, robust and be able
    to withstand high levels of radiation
  • Large tapered flanges, clamps and seals
  • Operating pressure
  • Volume
  • Pumps
  • Valves
  • 5 removable turbo/scroll roughing stations
  • TPG300 gauging system, PLC for control and
    interlocks
  • The RGA system

9
Ring Vacuum Ion Pumps
10
Removal of a Main Dipole Magnet

11
(No Transcript)
12
Target Containment Vessel Vacuum System
13
Beamline Vacuum Systems
  • Muon Neutron Beamline Vacuum Systems
  • Operating pressure
  • Volume
  • Construction material

14
Merlin Vacuum System
15
Merlin Vacuum system
16
The ISIS Second Target Station
Experimental Hall, Target Station and 5
instruments by end 2008
Proton Beam by end 2007
Budget 140M
17
SANS 2D Vacuum System
18
Acknowledgements
  • ISIS Vacuum Team
  • S Hughes
  • G Matthews
  • D Stringer
  • R Symes