CMS Forward Pixel Detector Status _at_ESE
CD Project Status Meeting May 16th,
2006 Guilherme Cardoso
  • Electronic Systems Engineering

2
The CMS forward pixel detector
Forward Pixel Detector
Barrel Pixel Detector
  • ? 3 high resolution space points for h lt 2.2
  • Expected resolution r- ?, 10 ?m r - ?, 17 ?m

3
Forward pixel detector components













Plaquette (672, 5 types)
Sensors
Detector Unit (672)








Bump bonded

ROC (4,500)

VHDI (672, 7)

Blade, (96)

Panels, (192,4)
P-4
P-3
½ -Disk (8, 2 types)
Cooling channels, (96, 4)
June 06 04
D\cms\aaa-www\6-assbly-blade-r.ppt
4
Pixel Panel
? First panel assembly
2x5
2x4
2x3
? Readout from 24 readout chips
5
CMS Test Stands
  • Description
  • Development of PCI-based (using ESEs PTA system)
    test stands to characterize production pixel
    modules and panels
  • Scope
  • Design of firmware and associated hardware to
    interface PTA to CMS pixel modules and panels
  • Schedule
  • Task has been completed
  • ESE Effort
  • Budgeted 4 FTE months, charged the project 4 FTE
    months.
  • Stakeholders
  • Marcos Turqueti, Lorenzo Uppleger, Simon Kwan

6
Test beam setup
120 GeV ?
Y
X
?
?
?
?
?
?
?
O
Z
Y(3)
Y(11)
X(4)
X(5)
X(9)
X(10)
CMS
  • Telescope of 6 BTeV pixel detectors (50 ?m ? 400
    ?m)
  • 2 Y-measurement planes
  • 4 X-measurement planes
  • CMS pixel detector in the center
  • Track projection error
  • about 3 ?m on X-direction about 8 ?m on
    Y-direction.

7
Photograph of setup at Meson Area 6
8
CMS Test Beam
  • Description
  • Development of a DAQ system to test radiated CMS
    pixel modules
  • Scope
  • Characterize pixel sensors and modules before and
    after radiation damage
  • Install pixel modules at MTest
  • Design DAQ to acquire data for offline analysis
  • Schedule
  • First and second test beam runs completed.
  • Third run scheduled for July
  • ESE Effort
  • Budgeted 4 FTE months, charged the project 4 FTE
    months
  • Stakeholders
  • Marcos Turqueti, Lorenzo Uppleger, Simon Kwan

9
CMS System Integration
  • Description
  • Assist in integrating the CMS DAQ
  • Scope
  • Leverage our experience with FE electronics to
    assist CMS DAQ system integration effort at SiDet
  • Schedule
  • May 2006 to October 2006
  • ESE Effort
  • 1 FTE per month
  • Stakeholders
  • Marcos Turqueti

10
CMS Upgrades
  • Description
  • CMS pixel detector that will replace current
    detector in 2009
  • Scope
  • Not yet defined
  • Schedule
  • Starting now, first FNAL workshop in August
  • ESE Effort
  • Prepare presentations, documents, reviews, etc.
  • Stakeholders
  • Guilherme Cardoso