Title: LARP/LHC%20Calendar


1
LARP/LHC Calendar
  • LARP in 2007
  • Opening of LHC_at_FNAL
  • Crystal collimation workshop March (at CERN)
  • Full collaboration meeting April, LBL
  • Beam-beam compensation workshop June (?), SLAC
  • Deliver tune tracker, luminometer, Schottky
  • Mini collaboration meeting October, FNAL
  • LHC in 2007
  • Injector machine studies March - November
  • Last magnet lowered March
  • LHC Tunnel closed August
  • First beam in LHC November
  • Collisions at 450 Gev November/December

2
450 GeV Phases
Phase
1 First turn
2 Establish circulating beam
3 450 GeV initial
4a 450 GeV - consolidation
4b 450 GeV system commissioning
5a Two beam operations
5b Collisions
6 Increase intensity
S. Myers (CERN)
3
Visits
  • Visitors to FNAL
  • E. Laface (CERN) Jan 29-31
  • R de Maria (CERN) Feb 7 25
  • Visits to CERN
  • Schottky related
  • Beam Commissioning ?
  • LAFS ?

4
IR and Beam-beam in 2007
  • IR optics with magnets inside detector combined
    function magnets, other variants
  • Nonlinear error correction of IR magnets
  • Nonlinear chromaticity correction
  • Beam-beam performance of different layouts
  • Experimental test of wire compensation (RHIC ?)
  • Beam-beam compensation simulation
  • Investigate use of ODR for LHC beam imaging at IP