2SCOPE OF THE PRESENTATION
- SA Air Force Strategic Transformation Plan
Towards Vision 2012 - CAF. - Representivity in the SA Air Force - CAF.
- Representivity in Core Musterings - CDAPP.
- Aviation Awareness (Project SIYANDIZA) - CDAPP.
2
3SA AIR FORCE STRATEGIC APPROACH
EMPOWER ORGANISATION
Today
Vision 2012
EMPOWER INDIVIDUALS
3
4SCOPE
- Structure of the Plan.
- Planning Fundamentals.
- SA Air Force Vision 2012.
- Key Strategic Issues.
- Transformation Strategy.
- Considerations for Implementation.
4
5Structure of the Transformation Plan
SECTION 1 FUNDAMENTALS
SECTION 2 SAAF VISION 2012
SECTION 5 TRANSFORMATION STRATEGY
SECTION 3 ENVIRONMENTAL ANALYSIS
SECTION 6 FORCE STRUCTURE DESIGN
SECTION 4 KEY STRATEGIC ISSUES
SECTION 7 IMPLEMENTATION GUIDELINES
5
6Planning Fundamentals
? Mandate To provide and manage the Air Defence
capability of the Department of Defence on
behalf of the DOD, thereby participating in
the service to ensure the sovereignty ... ?
Focus Air Power Excellence. ? Motto Our People,
Our Air Force, Our Future. ? Mission The South
African Air Force provides combat ready air
capabilities for the SANDF in service of our
country. ? Strategic To establish the South
African Air Force as a provider of Approach
combat ready air power by means of transforming
our people and optimising our assets through
dynamic strategic leadership.
? Mission The South African Air Force provides
combat ready air capabilities for the SANDF
in service of our country.
6
7SAAF Vision 2012 The Air Force of the Future
? The SA Air Force is able to maintain an
affordable and sustainable balance between the
structural elements of air power Equipment,
People, Doctrine - each element developed to
its full potential and employed with maximum
efficiency. ? It can conduct all operations
entrusted to it with an exceptional degree of
dependability and skill. ? It can afford its
force design, sustain all required force
preparation and force employment, and maintain
high standards of aviation safety.
7
8SAAF Vision 2012 The Air Force of the Future
- ? It has a rejuvenated, affordable, sustainable,
representative and skilled "one force" human
resource component, consisting of Regular
Force, Reserve Force, Public Service Act
Personnel and out-sourced human resources, which
it develops and maintains through a
well-established and comprehensive human resource
strategy formulation and planning process. - ? It is free of racial stereotypes and gender
biases, and offers opportunities for all its
members to find self-fulfilment and contribute
meaningfully to the creation of air power
excellence, and it is free of crime from within
its own ranks. - ? It has well-developed strategies and plans
aimed at the optimum application of air power,
and its personnel are proficient in air power
fundamentals.
8
9SAAF Vision 2012 The Air Force of the Future
? It has a common, shared Air Force culture and
ethical code which promotes unity amongst its
members who share a common passion for military
aviation. ? It is able to respond efficiently
and timeously to national priorities as and when
called upon. ? It has successfully integrated
all new aircraft systems into the SA Air Force,
and can operate them at the intended flying rates
with a high degree of operational
efficiency. ? It consistently achieves high
levels of efficiency and organisational
effectiveness through a mature systems
management approach.
9
10 Key Strategic Issues
- Human Resources Development and Utilisation.
- Affordability and Sustainability.
- Structural Aspects.
- Force Preparation and Force Employment.
- Common Air Force Culture and Ethics.
- Integration of New Aircraft Acquisitions.
- System Integrity.
- Air Power Knowledge and Doctrine.
10
11Human Resources Development and Utilisation
- It is not representative of the South African
nation. - Much needed expertise and skills leave the Air
Force. - The different elements of the Air Force are not
coordinated in a cost effective, single force. - The human resource management process is not
optimised for the needs of individuals and the
Air Force.
11
12Affordability and Sustainability
Operational
16
Contracts
25
50
Personnel
9
AMG
2003/04 Budget R2,148,673,000 Fixed Cost 84
(RM1,799,755,554) Operational 16 (R348,917,446)
12
13Force Preparation and Force Employment
- Insufficient flying hours for force preparation
and force employment. - This impacts on readiness levels, morale and
retention. - Inability to meet all national expectations for
external force employment and support to the
people of South Africa at the same time.
13
14Integration of New Aircraft Acquisitions
- Integration of the first new aircraft (Agusta
A109) into the Air Force to start in November
2003. - Preparation of the infrastructure and support
system to accept the new aircraft. - Training of representative and competent
aircrew and technicians required to successfully
employ the new systems.
14
15System Integrity
- Most aircraft systems and air bases have, to
some degree, deteriorated over a period of time
due to persistent under- funding. - Air bases, support systems and some aircraft
are in need of upgrades and repairs.
15
16SAAF Vision 2012
TODAY
Vision 2012
16
17Transformation Plan - HR Component
- Formulation and urgent implementation of a
comprehensive, integrated Air Force Medium Term
HR Strategy (approved in Feb 03), compilation of
an Air Force HR Short-term Support Plan with
specific HR objectives and targets (approved in
Feb 03, and annually in Jan). - Effective utilisation of the Air Force Reserves
as a means of optimising all resources at the
disposal of the Air Force. - Retention of people in core musterings,
focusing on career management, remuneration,
and working and living conditions.
17
18Transformation Plan - HR Component
- Aviation awareness program (SIYANDIZA) focusing
on the recruitment of military aviation
specialists to continue. - Culturally fair selection process which makes
adequate provision for all culture groups to be
developed and implemented. - Learning opportunities to be structured so that
transformation goals and operational
requirements are met at the same time. - Overseas learning opportunities to be actively
sought out and utilised. - Invitations to SADC countries to send students
for training in the SA Air Force.
18
19Transformation Plan - HR Component
- Exploiting common ground in aviation training
between the SAAF and commercial aviation
sector. - Military leadership, the ethics of airmen, the
art of officership, and a general military
ethos must be a high priority in military
aviation training. - Enabling environment to be created at all SAAF
training institutions to foster an atmosphere
conducive to learning. - Requirement identified for the flight
screening of candidates to confirm flying
aptitude, reducing the risk of later suspension.
19
20Transformation Plan - Affordability
Operational
30
Personnel (Incl. AMG)
48
22
Contracts
Contracts
2003/04 Budget R2,148,673,000 Fixed Cost 70
(R1,504,071,100) Operational 30
(R644,601,900) Additional for Operational
R295,684,454
20
21Transformation Plan - Affordability
- HR component maximum of 10 000 (including PSAP
and AMG) by Mar 06 AMG to reduce to 500
personnel variable within 10 000 total 90 in
core technical musterings. - Logistic restructuring in accordance with a new
logistic support philosophy to improve cost and
work share with industry to be completed by Dec
03 financial benefits to be redistributed to
increase flying hours and restore system
integrity.
21
22Transformation Plan - Affordability
- A mechanism for cost recovery for services
rendered to clients external to the DOD to be
firmly established. - Implementation of Public Private Partnerships
(PPPs) to reduce the cost of ownership of
selected air bases. - Implementation of South African Excellence
Model for continuous improvement and increased
internal efficiency.
22
23Transformation Plan Force Preparation
- Air Force Board has set a strategic goal to fly
an annual average of 60 000 hours per year by
2010.
- Increase of 24 000 hours from 2003 average
increase of 3 000 hours per year (from 2003). - Additional funds allocated to flying hours in
2003 provides an increase of 5 000 flying hours.
23
24Transformation Plan Force Preparation
- Strong emphasis to be placed on operational
readiness status through a structured measuring
and reporting process. - Increased emphasis to be placed on annual force
preparation exercises, such as Golden Eagle,
to practice the planning and execution skills
of the SAAF. This will, where possible and
practical, be combined with other Services and
regional partners.
24
25Transformation Plan New Aircraft
- First Agusta A109 in South Africa for hot and
high trials. - First Hawk has arrived in South Africa for
engine performance trials. - Specific career paths and training programs
being developed to ensure representative,
competent and well-trained crews. - Infrastructure development programs being
compiled to meet the needs of the new aircraft.
25
26Transformation Plan System Integrity
- A Systems Integrity Recovery Plan scheduled for
completion by Jun 03, and the integrity of all
major systems to be restored by 2005. - Income from the sale of excess items to be
used to restore system integrity, and a Disposal
Plan of Excess Defence Articles scheduled for
completion by Jun 03. - Restoration of Base facilities and
infrastructure a high priority.
26
27Transformation Plan Force Structure 2012
AFB LOUIS TRICHARDT 2 GRIPEN 85CFS HAWK 17C A109
ORYX 102 VARIOUS
AFB WATERKLOOF 17 ORYX A109 21 INKWAZI,
FALCON, CITATION 28 C130 HERCULES 44
MED/LT TRANSPORT, C-185 41 C208 CARAVAN
KING AIR PC-12 60 BOEING 707 104
VARIOUS111 VARIOUS
AFB HOEDSPRUIT LASS MDW CC SCHOOL 101 VARIOUS
AFS DURBAN 15 ORYX A109 105 VARIOUS
AFB LANGEBAANWEG CFS ASTRA
AFB BLOEMSPRUIT 87 ALO III ORYX 16
ROOIVALK 106 VARIOUS
AFS YSTERPLAAT 22 ORYX A109 35
C47-TP 80 NAV SCHOOL 110 VARIOUS
AFS PORT ELIZABETH 15C A109 108 VARIOUS
AFB OVERBERG VARIOUS TEST TYPES
27
28Considerations for Implementation
- Air Force Board adopted all Key Strategic
Issues as focus areas for direct control in
2003/04. - The success of Vision 2012 depends on
incremental successes in the implementation of
the Transformation Plan. A detailed
implementation matrix managed by the senior
leadership in the SA Air Force will ensure that
set milestones are achieved. - Emphasis on operational readiness is retained
throughout. All directors and Base Commanders
report to CAF at the quarterly Operational
Readiness Forum. - Low tolerance levels for non-achievement of
targets.
28