1Grouting of 2 skid-mounted ARIEL compressors with
Chockfast Red Red SG
Location Gronau Epe Germany Client
Essent The Netherlands Producer
of electricity Purpose Injection of gas
into salt voids at 2 kms depth at
240 bar
By Tom Hoekstra
2Set up
6 cyl. Ariel compressor
Schorch E-motor
3Anchor calculations
- Before grouting the achorbols following data need
to be checked or re-calculated - Required Bolt Force (kN)
- Bolt size
- Bolt length
- Pocketsize
- Planned torque (Nm)
- Groutlength
- Stretch-length
4Preparation grouting of the anchors
- The anchors are checked on
- Taped-in proper stretch-length
- Ring and (1 or 2 nuts)
- Anchor position in centre of hole
- and
- Clean and dry pockets
- Armaflex tube around jackbolts
5Install expansion joint rubber
- Expansion joints create restricted areas in
order to limit the flow of the grout - Potlife (temperature) versus flowdistance will
indicate the placement of the expansion joints - To avoid shrinkage-cracks after the heatsink,
joints are placed as a rule every 75-100 cm
6Install shuttering
7Some technical data - for 1 skid
- Total area to be grouted 9800 x 3430 mm
- Clearance 50 mm
- pouring hight (overpour) 80 mm
- Total quantity of Chockfast Red 54 units
- Anchordata (mms)
- 18 pcs
- M 30 x 3.5 class 8.8 L 500
- F 200 kN
- Pocket ?200 x 200 x 375
- L stretch 140
- L grout 300
- Actual elongation ? l 0.242
- Torque 1200 Nm
8Grouting the skid under the compressor
- The segment under the compressor could be
reached properly by using several spiro tubes of
Ø 125 with funnels, this enabled us to pour from
the inside as well.
This access made it possible to use the regular
Chockfast Red
9Grouting the skid under the e-motor
- In contrast with the compressor part
- the area under the E-motor could not be reached
(no man-holes were available in the skid) - Consequently all grout had to pass through a
slot of 50 x 1000 mm. - consequently Chockfast Red SG was applied
10Reduction on material use
- Tight shuttering close to the contour of the
skid avoided unnecessary coverage of floor
Red line indicates contours of shuttering
A reduction of 1000 kg grout was obtained The
total floorarea was coated afterwards with a
non-static coating
11Pictures of end result
12End result