Mojave Ground Squirrel Partnership Workshop - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Mojave Ground Squirrel Partnership Workshop

Description:

Fund population biologist/statistician to determine most efficient method of locating MGS ... Translocation/ reintroduction of MGS. 3 - Adaptive management plan ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 16
Provided by: rth61
Category:

less

Transcript and Presenter's Notes

Title: Mojave Ground Squirrel Partnership Workshop


1
Mojave Ground Squirrel Partnership Workshop
2
Goal
  • Ensure long-term protection of MGS habitat
    viability of species

3
1 - Determine the extent of the MGS range
  • Prioritize areas to be surveyed/monitored to
    determine presence/absences
  • Update current MGS map
  • Fund population biologist/statistician to
    determine most efficient method of locating MGS
  • Conduct presence/absence surveys

4
2 - Determine habitat type
  • Determine preferred habitat type
  • Determine ecological requirements

5
3 - Adaptive management plan
  • Long term monitoring for status trends
  • Population estimates and baseline population data
  • Create and maintain central data base
  • Standardize data collection techniques
  • Translocation/ reintroduction of MGS

6
Adaptive management cont.
  • Continue to support research that promotes
    conservation of the species
  • 1) Locate core populations
  • 2) Determine important corridors between core
    areas.
  • 3) Determine barriers to movement and id measure
    to minimize barriers
  • 4) Document genetic variation through out the
    range

7
Adaptive management cont.
  • Assess the need for and develop as necessary
    education materials that will assist in the
    conservation of the species.

8
4) Develop/implement measures to sustain long
term viability
  • Limit the loss of habitat and effects on MGS
    populations through the application of effective
    conservation measures and when applicable through
    mitigation and compensation
  • 1) Restore and enhancement of habitat
  • 2) Avoid/minimize impacts to MGS and its habitat

9
Measures to sustain long term viability cont.
  • Secure and/or manage sufficient core habitat and
    corridors to maintain self sustaining populations
  • Task 1) Develop and implement interim
    conservation measures
  • Task 2) Maintain genetic variation through out
    the range

10
  • Foster communication and coordination among
    participants and other interested parties to
    identify opportunities for collaborative action
    to further the acquisition, protection,
    restoration and management of MGS habitat.

11
Monitoring
  • Hire a statistician/population biologist
  • Phase I
  • 1) Develop experimental design for presence
    absence throughout range.
  • 2) Assess method of monitoring for statistical
    validity, using accepted scientific methods, i.e.
    Grid vs transects, trapping, vocalization,
    cameras, etc.

12
Monitoring cont.
  • Phase II
  • 3) ID aspects of population biology (age
    specifics, population size, density dependence,
    survival rate, reproductive rate, sex ratio,
    etc.) though population viability analysis with
    simulation models.

13
Monitoring
  • Phase III
  • Analysis of spatial needs, number of location of
    core populations and connectivity.

14
(No Transcript)
15
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com