Title: SNuMI Transfer Line Magnets


1
SNuMI Transfer Line Magnets
  • Vertical bend dipoles
  • Horizontal bend dipoles
  • Horizontal bend mirror dipoles
  • Trim dipoles
  • Main quadrupoles
  • Trim quadrupoles
  • 3Q120 quadrupoles

2
Vertical bend dipoles (ADCW)
  • Injection line 4 each
  • Extraction line 2 each
  • Spare 1 each
  • Rebuild old 8 GeV line dipoles with 3/4 spacer
    in back leg to open gap

3
(No Transcript)
4
Issues
  • Can we find all seven original magnets?
  • Ramp to make heat load acceptable
  • Is lamination insulation still good enough for
    ramping?
  • Do we need to reinsulate the coils for long-term
    reliability?
  • Will leakage field require shielding the Recycler?

5
Horizontal dipoles (PDD)
  • Injection line 5 each
  • Build more to design of permanent magnet dipoles
    in MI-8

6
(No Transcript)
7
Issues
  • Existing design, tooling, procedures
  • Havent built any for 10 years
  • Measurement system on last legs
  • Need funding at start of FY08

8
Horizontal bend mirror dipoles
  • Injection line 1 each
  • MI-8 1 each
  • New design permanent magnet

9
(No Transcript)
10
Issues
  • Conceptual design does not meet strength specs
  • Work needed to meet field uniformity needs
  • Should share tooling with PDD
  • Need funding at start of FY08

11
Trim dipoles (various)
  • Reuse magnets from RR ? MI lines

12
(No Transcript)
13
Issues
  • None

14
Main quadrupoles
  • Injection line 10 each
  • Extraction line 10 each
  • Reconfigured RR30 straight 16 each
  • Retrim/rebuild permanent quads from RR30 straight
    (44 available)

15
(No Transcript)
16
Issues
  • Higher strength required than regularly achieved
    in the past
  • Try choosing best ferrite bricks
  • Trim quads available
  • Tight time schedule for during shutdown
  • Re-establish procedure soon
  • Dress rehearsal in months before shutdown

17
Trim quadrupoles
  • One for each permanent quadrupole in the
    injection line matching section
  • Main Ring trim quadrupoles
  • Excess spares

18
(No Transcript)
19
Issues
  • None

20
3Q120 quadrupoles for NuMI
  • Primary proton beam 5 each
  • Spare 1 each
  • Build new, low inductance, water cooled magnets
    to Main Injector design

21
(No Transcript)
22
Issues
  • Need funding at start of FY08