SDDC ARFORGEN Implementation Strategy - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

SDDC ARFORGEN Implementation Strategy

Description:

DEEMS. RSO&I IAW RDD. Redeployment IAW RDD. 100% ITV. Container Management. BCS3 Receive DLA Plug ... Ability to Operate w/i SUA TO (Port Operations) Receive ... – PowerPoint PPT presentation

Number of Views:117
Avg rating:3.0/5.0
Slides: 6
Provided by: sddc
Category:

less

Transcript and Presenter's Notes

Title: SDDC ARFORGEN Implementation Strategy


1
SDDCARFORGEN Implementation Strategy
Readiness of Army Forces Required to Source the
Expeditionary Bridge
Expeditionary Bridge
Global Force Pool
Available Forces
The Fight
Documentation
X
Embark
Debark Employ
X
In Transit Visibility
2
Transportation Terminal BattalionTraining
Readiness Strategy
RESET/TRAIN POOL
READY POOL
AVAIL POOL
R DATE
CDRs Assessment
CDRs Assessment
Open Expeditionary Seaport Operation or Surface
C2 Plug to TSC
Fixed Port Peacetime Operations
Follow-on Expeditionary Sea Port Operations
Ready for What
  • - Customer Wait Time/RDD
  • TWCF Cost
  • Booking/Billing Accuracy
  • - In Transit Visibility (ITV)
  • RSOI IAW RDD
  • Redeployment IAW RDD
  • 100 ITV
  • Container Management

Report Against What
  • Ability to Operate w/i SUA TO
  • (Port Operations)
  • Receive all Services Sea Port
  • Capability (Army Watercraft,
  • USCG Port Security, USN ELSF,
  • USMC Debark Units)
  • Ability to Provide Surface C2
  • to TSC
  • BCS3 - IBS
  • TCA2 - CMST
  • WPS - ICODES
  • DEEMS
  • BCS3 Receive DLA Plug
  • TCA2 Receive USCG Plug
  • WPS Receive UMC Plug
  • ICODES

Training What
USTC/ SDDC EXEVAL OF AC
Manning 75 MTOE Equipping 25 MTOE
SDDC EVAL
Deploy
Joint MRX
AC Train/Eval RC
Deploy
MRX
Regional Command CPX
3
Movement Control Battalion Training Readiness
Strategy
RESET/TRAIN POOL
READY POOL
AVAIL POOL
R DATE
CDRs Assessment
Ready for What
Deployment Support
UEx/UEy Movement Control
End-2-End Movement Control
Deployment Documentation Timeliness Accuracy In
Transit Visibility (ITV)
DEF/REF Capability to Perform Designated Mission
METL at Level Organized
Report Against What
DEF/REF Capability to Perform Joint Army METL
at all Levels
  • JLOTS
  • USAF TALCE Exercises
  • Receive DLA Plugs
  • Operate w/i Joint or
  • Other Service C2
  • - TCA2 Individual Tng
  • BCS3
  • TCA2 Rodeo w/ Units

- Movement Control METL - CTC/Warfighter
Training What
SDDC DDRC
Manning - 100 Aggregate Equipping 100 MTOE
Manning 100 Equipping 100
MTOE
100Joint Required
BN FTX
Manning 50 Equipping 50 Organic
50 SDDC
MRX CTC
JTFPO Ex
JLOTS
Warfighter
4
Terminal/Distribution BrigadeTraining
Readiness Strategy
RESET/TRAIN POOL
READY POOL
AVAIL POOL
R DATE
CDRs Assessment
CDRs Assessment
C2 Fixed Fort to Port Peacetime Operations
C2 Multiple Fort/Port Operations in Peace or
Follow-on Expeditionary Deployment/Distribution
Opns
Ready for What
Surface C2 Plug to TSC Synchronize Movement
Control and Terminal Operations
  • - Customer Wait Time/RDD
  • TWCF Cost
  • Booking/Billing Accuracy
  • In Transit Visibility (ITV)
  • OCCA Processing Timeliness
  • USC Carrier QA

Report Against What
  • RSOI IAW RDD
  • Redeployment IAW RDD
  • 100 ITV
  • Ability to Operate w/i TSC
  • Integrate Multi-Service
  • Capabilities
  • Integrate Distribution
  • Terminal Functions
  • BCS3 Receive DLA Plug
  • TCA2 Receive USCG Plug
  • WPS Receive UMC Plug
  • ICODES
  • BCS3 - IBS
  • TCA2 - CMST
  • WPS - ICODES
  • DEEMS?

Training What
USTC/ SDDC EXEVAL OF AC
Manning 75 MTOE Equipping 25 MTOE
SDDC EVAL
Deploy
Joint MRX
AC Train/Eval RC
Deploy
MRX
Regional Command CPX
5
SDDCBottom Line
  • SDDC Forces are Already Operating with an
    ARFORGEN-Like Model
  • CSA Dont hesitate to take credit
    for what you have done.
  • Need FORSCOM Validation/Course Correction to
    Ensure SDDC Supports
  • FORSCOM ARFORGEN
Write a Comment
User Comments (0)
About PowerShow.com