TSVFD Department Meeting
  • August 27, 2007

2
Building and Grounds Issues
  • Station 1
  • Engine room vapor lights have been repaired by FF
    Romano, and installed by the Township.
  • We have received one bid for the installation of
    heat tape for the roof over the ramp from G.E.
    Steigauf in the amount of 5,326. Chief Engineer
    Angstadt is soliciting more bids. Per the
    Township, 3 bids are needed with final approval
    by supervisors.
  • Magnetic white boards completed colored dots
    will be placed on all name tags to identify which
    platoon you belong in. If anyone does not have a
    name tag please see FF Rhoads.
  • Jay Vaughn will be contacting Lord Moyer to
    repair the curbing on the east side of the pad at
    the cost of the Township. Jay will also be taking
    care of painting the curb yellow across from
    station.
  • WINTER PROJECT Coming in months ahead we will
    be starting a cleaning spree of the mezzanine
    area. Any one who is available to help it would
    be greatly appreciated.

3
Building and Grounds Issues
  • Station 1 Continued
  • Rainbow Roofing completed repairs to the roof
    leaks
  • As you probably noticed the weed strip was
    removed outside of the training room. The next
    step will be the paving of that area and removing
    the foliage from the islands and replacing with
    stone.
  • Station 2
  • Nothing major at the moment
  • Lease of WWFC Space
  • Looking at renting the east side bays for the
    collapse and robot trailers, Squad 852 and Rehab
    85.
  • Letter being completed by WWFD to state that they
    have other plans for the east engine rooms and
    they are not available.
  • Training Site
  • The training site monies will be transferred to
    the Fire Prevention Trailer account. No money was
    taken from the Fire Department budget to pay for
    the removal and demolition of the training site.
    Chief Engineer Angstadt will be changing the
    accounts.

4
Operations
  • Run Card Updates have been submitted to Berks
    County Communications Center and should take
    effect shortly. Thanks to D/C Strause for going
    over the run cards and making appropriate
    changes.
  • EMA Table Top Exercise was well represented, with
    the exception of the Fire Dept. There will be two
    follow-up sessions with dates TBA. This is an
    exercise is very important for the officers of
    this dept. Please plan on attending.
  • All Apparatus License Plates have been renewed
    with the exception of E-851. The state has
    informed me that the current tag has no
    expiration date and is still legal to operate
    until the new tag arrives.
  • Hydrant Cap installation is in progress at this
    time with about ½ completed. Help would greatly
    appreciated.
  • Mobile radio programming was completed for the
    apparatus by RMI. Portable radio programming for
    officers will be done by FF Rhoads. Please
    arrange a time to have this completed.

5
Operations
  • Company Burn Session on August 18th went well.
    Members had a great day weather wise. We still
    need some continued practice with hose
    management, and PASS Alarm management. Overall I
    think the training went very well and thanks for
    everyone who attended the drill.
  • Total Visibility Personnel Records should be
    filled out by all operating personnel. New
    personnel will complete a form when being
    interviewed.
  • Web Site Update
  • Will require upgrade to expand (VFRA Section,
    Training, Public Relations)
  • Sponsors being lined up
  • A new section has been created that will allow
    members to view any fire department forms. There
    was also a TOP 10 FFs section created in the
    Members section. This will be updated the 1st of
    every month.
  • Anyone with pictures please see either D/C Roth
    or Schartel, or FF Rhoads
  • SOG Revisions ongoing. Draft revisions will be
    reviewed by Staff
  • Covers for Hydraulic lines, Pneumatic Lines and
    possibly Comm. Rope are being looked into by
    Spec. Ops Group along with Capt. Burns.

6
Operations
  • In reference to the news paper article about
    houses losing water pressure in the Shiloh Hills
    area. John Rothwell from Pa American water told
    me that the incident occurred the night of the
    Tanker drill in Gouglersville. Co. 56 used the
    hydrant at the lowest point in reference to
    Shiloh Hills and opened the hydrant too fast.
    This did not give the pump enough time to recover
    pressure. About 20 houses lost water at the top
    of the system. This resulted in a Water Boiling
    Advisory for the residents in that area. I am
    very surprised we did not receive any phone calls
    from irate citizens. PLEASE remember to open and
    close all water valves slowly.

7
Apparatus Issues
  • Exhaust on E853 scheduled for permanent repair on
    Sept. 4th.
  • R-85 winch rope/cable to be ordered.
  • 100 on the winch with 50 extension in storage
    bag.
  • R851 rattle has been fixed by PBL found vacuum
    leak- has been repaired
  • Engine 85-1 back from Penn Diesel fixed
    transmission leak
  • August Inspection schedule
  • E85, E852, E-853, Car 85
  • Driver Training Protocol
  • Chief/Capt OK
  • Commissioner OK
  • Chief Engineer/Asst Chief Engineer one time
  • Any qualified driver for practice
  • Final OK

8
Special Operations
  • Budget and equipment needs being studied
  • R-85 Rope Cable for winches has been over viewed
    and will be ordering 100 rope cable for the
    winch along with a 50 extension that will be
    placed in a storage bag
  • All rope rescue rope has reached its shelf life.
    7 Spools of rope 600 long of 7 different colors
    will be ordered. The ropes will be split into 1-
    300 section, 1- 200 section, and 1- 100
    section. All rope will be placed on R-85, R-851,
    E-851, Sq-851
  • Spec Ops Training
  • Developing Phase III training scheme for rescue
    operations

9
Special Operations
  • Kids Safety Trailer / Fire Prev. / Public
    Relations
  • Preparing SOG for trailer operations
  • Use sway bars and load equalizers EVERY TIME YOU
    MOVE THE TRAILERS
  • Will be posted on the trailer at the hitch
  • Appearance Schedule
  • 9/22 WW Chapel
  • 9/29 Day Mohnton Parade / Night Fireworks
  • 9/29 Night Wilson Sound Panorama
  • Helmet Tetrahedrons
  • Helmet tetrahedrons will be handed out following
    tonight's meeting to those members who are
    strictly exterior firefighters. These
    tetrahedrons will make it easier for the command
    staff to identify interior vs. exterior
    firefighters.

10
Training
  • August
  • 27 NO DRILL DEPT MEETING
  • September
  • 3 NO DRILL LABOR DAY HOLIDAY
  • 8 (Sat) Skills Drill
  • 10 Vehicle Rescue Ops
  • 17 Ventilation Practices
  • 24 NO DRILL DEPT MEETING
  • 24 FM Browns Tech Rescue Drill w/51
  • 29 (Sat) Helicopter Landing Drill (Medevac 4)
  • October
  • 1 4TH Qtr Consumption Checks/ Chimney Evol.
  • 6 SATURDAY SKILLS DRILL
  • 8 NO DRILL FIRE PREVENTION OPEN HOUSE
  • 15 Fire Evolutions
  • 22 NO DRILL DEPT MEETING
  • 26-28 FRI-SUN ENGINE/TRUCK Operations (CLASS)
  • 29 Swift-Water Rescue Demo/ Classroom

11
Training
  • Misc. Stuff
  • Long range planning
  • Haz Mat Ops Refresher Mon Tues Oct. 1st 2nd
  • 10/26,27,28 Engine / Truck Class
  • 12/1 CPR
  • 1/7 Meters (SFA)
  • Standpipe training at Spring Ridge Corp Ctr will
    be later in the fall
  • Please check your training records against your
    personal records
  • Printouts available from FIREHOUSE software (See
    career staff)
  • Rescue certs (BRP, VRT)
  • May affect PPE issue protocol
  • RACC Department Liability Release form
  • 2nd Quarter Training Requirement met by just
    about all

12
Training
  • Outstanding Certifications
  • (if you have them, please get us a copy)
  • Bloodborne Pathogens
  • C. Burns, Pajski, R. Ahrens, Henry, Rodriquez,
    Homan, Sharma, Wentzel
  • CPR
  • Etechberger, Woll, Ragonese, Balthaser, B.
    Cummings, Heere, Henry Rodriquez, Tercha,
    Boulanger, Delorenzo, Gerhart, G. Hostetter,
    Klusewitz, Noecker, Pagerly, A.J. Pollock

13
IMPORTANT DATES
  • September 13 Training Staff
  • September 20 Staff
  • September 24 Dept Meetings

14
  • ROUNDTABLE
Write a Comment