PMT Test @ Univ. of Tokyo - PowerPoint PPT Presentation

About This Presentation
Title:

PMT Test @ Univ. of Tokyo

Description:

Set up. PMT (Al Strip Type) TB0094 TB0102 TB0286 TB0302 (now ... Ratio of alpha peak with LED ON to one with LED OFF. Number of photoelectrons from LED per second ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 12
Provided by: yoshiharu4
Category:
Tags: pmt | setup | test | tokyo | univ

less

Transcript and Presenter's Notes

Title: PMT Test @ Univ. of Tokyo


1
PMT Test _at_ Univ. of Tokyo
  • Yasuko HISAMATSU

ICEPP, The University of Tokyo
MEG VRVS meeting Jan. 20th, 2004
2
PMT Output Deterioration
  • During the pi0 beam test _at_PSI, output from some
    PMTs reduced by 20-30 when beam was ON.
  • (The background was estimated to be
    1.5106p.e.)
  • Similar change was observed under the background
    simulated using LED pulses
  • -gt The Deterioration of old type PMT output due
    to the high rate background.
  • Output from Al Strip Type PMT (new type) needs
    to be tested under the high rate background.

Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
3
PMT Test _at_ Univ. of Tokyo
  • Set up

PMT (Al Strip Type) TB0094 TB0102 TB0286
TB0302 (now being analized) TB0284 TB0568
Liq. Xe
PMT
5.5MeV alpha peak
Alpha source(241Am ) LED
PMT
ADC channel
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
4
Condition and Procedure
  • alpha source 200Hz,
  • LED pulse height 500p.e. 12000p.e. per event
  • pulse shape 10nsec
  • rate 100Hz 10KHz
  • Trigger alpha self trigger (veto by LED driver
    pulse)
  • Procedure
  • Pedestal Run Gain calibration using LED
  • Alpha Run _at_ LED OFF
  • Alpha Run _at_ LED ON (LED high rate
    background)
  • -Change LED Pulse height, rate and PMT
    gain

Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
5
Condition and Procedure
  • DAQ
  • -Alpha run with LED OFF
  • -Alpha run with LED ON
  • The cause of the change in PMT output
  • Breeder current ?
  • Deterioration of photocathode?

The change in PMT output?
Low gain run
Peak/Sigma (gain independent)
Ratio of alpha peak with LED ON to one with LED
OFF
Number of photoelectrons from LED per second
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
6
For instanceTB0302
5e5 gain peak (LED ON)/peak (LED OFF)
1e6 gain peak (LED ON)/peak (LED OFF)
107p.e. per sec
1e6 gain (peak/sigma _at_LED ON)/ (peak/sigma _at_LED
OFF)
7
Result
X number of photoelectrons per second from
LED Y alpha peak (_at_LED ON) / alpha peak (_at_LED
OFF)
  • 5e5gain

TB0094
TB0102
TB0268
TB0302
?
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
8
Result
X number of photoelectrons per second from
LED Y alpha peak (_at_LED ON) / alpha peak (_at_LED
OFF)
1e6gain
TB0094
TB0102
TB0268
TB0302
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
9
Result
X number of photoelectrons per second from
LED Y (peak/sigma _at_LED ON) / (peak/sigma _at_LED
OFF)
1e6gain
TB0102
TB0094
TB0302
TB0268
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
10
Schedule
  • DAQ
  • Jan. 21-22 2PMTs
  • Jan. 27-28 2PMTs
  • 10 PMTs will be tested and analized before the
    meeting at PSI.

Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
11
Summary
  • 4 Al Strip Type PMTs (new type) have been tested
    under the high rate background environment at the
    university of Tokyo.
  • So far, for the 4 PMTs, the stability of PMT
    output is better than 10 under the background up
    to 107 p.e. per sec.
  • No output deterioration so far under background
    of 1.5 106p.e.
  • In order to confirm the stability of PMT
    performance under the high rate background,
    additional 6PMTs are going to be tested.
  • The more precise analysis is now going on.

Additional Comments Of the 4 PMTs, the HV of 2
PMTs tripped frequently. The cause of
this HV trip is now being investigated.
Yasuko HISAMATSU Jan. 20th, 2004 MEG VRVS Meeting
Write a Comment
User Comments (0)
About PowerShow.com