Title: Simulation of DY processes
1Simulation of DY processes in the COMPASS
Spectrometer Michela Chiosso Torino, 5-6 March
2007
2MC Simulation chain
- ???Drell-Yan dimuon events generation with
Bianconis generator - DY_AB5
- output file .dat with energy, ???? for both ??
and ???in LAB Ref system - ???Conversion of generated data to a format
readable from ComGeant - 3. Processing of generated data with ComGeant
- muon run spectrometer with smaller target
(see Lauras talk) - 4. Reconstruction of simulated events.
3Generated events
- ???- beam on transversely polarized NH3 target
(spin along LAB y) - ? 0.1 GeV/c lt PT lt 6.0 GeV/c
- ??Generated 500000 events per file
- 1. S200 (P?- 106 GeV /c)
- a. 1.0 GeV lt M???? lt 3.5 GeV
- b. 3.5 GeV lt M???? lt 9 GeV
-
- 2. S300 (P?? 160 GeV /c)
- a. 1.0 GeV lt M???? lt 3.5 GeV
- b. 3.5 GeV lt M???? lt 9.0 GeV
- ???Processed so far, with ComGeant, 50000 events
per each generated file - ? Reconstruction with Coral
4MW1 and MW2 acceptance
Total acceptance ?????in MW1 ???? in MW2
????? in MW1 and ????? in MW2
5Vertex coordinates
mm
mm
Vertex distribution
6MW1 and MW2 acceptance
Total acceptance ?????in MW1 ???? in MW2
????? in MW1 and ????? in MW2
generated ????? in MW1
????? in MW2 ????? in MW1,
????? in MW2
Q2
Pt
Xf
67.5 2.5
30
71.5 GeV lt M???? lt 2.5 GeV
53 GeV ?- beam(S100)
84.0 GeV lt M???? lt 9.0 GeV
53 GeV ?- beam
91.0 GeV lt M???? lt 3.5 GeV
106 GeV ?- beam (S200)
MC
RC
101.0 GeV lt M???? lt 3.5 GeV
106 GeV ?- beam
RC
MC
111.0 GeV lt M???? lt 3.5 GeV
106 GeV ?- beam
MC
RC
121.0 GeV lt M???? lt 3.5 GeV
106 GeV ?- beam
Q2
Pt
Xf
131.0 GeV lt M???? lt 3.5 GeV
160 GeV ?- beam
MC
RC
141.0 GeV lt M???? lt 3.5 GeV
160 GeV ?- beam
RC
MC
151.0 GeV lt M???? lt 3.5 GeV
160 GeV ?- beam
MC
RC
161.0 GeV lt M???? lt 3.5 GeV
160 GeV ?- beam
Q2
Pt
Xf
173.4 GeV lt M???? lt 9.0 GeV
106 GeV ?- beam
MC
RC
183.4 GeV lt M???? lt 9.0 GeV
160 GeV ?- beam
MC
RC
193.4 GeV lt M???? lt 9 GeV
106 GeV ?- beam
Q2
Pt
Xf
203.4 GeV lt M???? lt 9 GeV
160 GeV ?- beam
Q2
Pt
Xf
21 - MC
- RC inside MW acceptance
22Acceptance Reconstruction Efficiency
106 GeV ?- beam
Q2
Pt
Pt
23Acceptance Reconstruction Efficiency
160 GeV ?- beam
Q2
Pt
Pt
24- The chain is ready to be used DY_AB generator
Converter ComGeant Coral Phast - Work
is in progress. - Still a lot of job has to be
done!