1High EnergyHigh IntensityHadron Beams
Network
coordinated by W. Scandale and F. Zimmermann
report to Governing Board preliminary work
program and budget request
- http//care-hhh.web.cern.ch/care-hhh/
2deliverables milestones
deliverables 2004 HHH HHH-APD web site gt
OK 2005 creation of web-based beam dynamics code
repository gt OK http//oraweb.cern.ch9000/pls/
hhh/code_website.startup 2007 web based database
for s.c. cables and magnets gt OK,
http//sdb.web.cern.ch/sdb frequently
visited! milestones web reference for IR optics
gt OK http//care-hhh.web.cern.ch/care-hhh/SuperL
HC_IRoptics/IRoptics.html booster synchrotron
optics gt delayed to 2008 structured list of
intensity limits gt nearing completion scaling
laws for magnet and cryogenic cost gt 2008
2 summer students 1 doctoral student
code for importing FNAL and BNL data almost
complete ITER, NED and US-LARP also being looked
at
1 summer student
3WP1 Advancements in Accelerator Magnet
Technologies (AMT)
4planned AMT workshops
- 19-20 November 07 CARE-HHH-AMT workshop on Heat
Generation and Heat Transfer in Superconducting
Magnets (THERMOMAG07), Paris, 2 days - minimizing and evacuating heat in the next
generation of superconducting magnets for high
intensity particle accelerators, such as the IR
magnet for the LHC luminosity upgrade and the
fast cycling magnets for FAIR and for the LHC
injector chain upgrade - identify the state of the art on
- (1) cooling techniques (fluids and regimes),
- (2) heat transfer mechanisms,
- (3) modeling of heat transfer from coils to
cooling system, - (4) heat transfer experiments identify a common
set of thermal design criteriaSpring 08 - Spring 08 a conclusive workshop
? CARE07 HHH highlight talk by D. Tommasini
5WP2 Novel Methods for Accelerator Beam
Instrumentation (ABI)
6planned ABI workshops
- Dec. 2007 HHH-ABI annual workshop on Tools for
Diagnostic Systems at High-Intensity (Pre-)
Accelerators Emittance Preservation and
Measurements in the Accelerator Chain, Chamonix,
France - Dec. 08 a conclusive workshop
7WP3 Accelerator Physics and synchrotron Design
(APD)
8planned APD workshops
- 7-9 November CARE-HHH-APD workshop on LHC IR
Upgrade (LUMI'07), INFN Frascati, Italy - new low-beta quadrupoles,
- detector-integrated dipoles and quadrupoles,
- crab cavities,
- wire compensation,
- experience with new DAFNE IR (crab waist IR)
- Spring 08 CC 08 on crystal collimation
- Spring 08 CRAB 08 on crab cavity progress
- Fall 08 a conclusive workshop (LUMI 08)
9Gantt chart until end of 2008 AMT and ABI
10Gantt chart until end of 2008 APD
11conclusions -work program budget
- support for HHH scientist exchanges
- 8 more workshops from now until end of 2008
- final report on HHH including
- final report on HHH-AMT
- final report on HHH-ABI
- final report on HHH-APD
- funds still available about 40 keuro