Description:

Review growth in local purchase/local manufacture requirements ... UHF/HF Radio, 0.23. Radar, 0.68. Other NRBA. Systems, 0.44. Inspections, 0.10. Navigation/Insts. ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 14
Provided by: navs4
Category:

less

Transcript and Presenter's Notes

Title: NAVICP Top 2 Aviation Supply Chain Concerns


1
NAVICP Top 2Aviation Supply Chain Concerns
  • Presented to the Senior Executive Partnership
  • Round Table 10
  • 2 May 2007

2
Naval Aviation Supply
NAVICP Concerns
  • Meet Warfighter Material Availability
    Expectations
  • Decrease Customer Direct Turn Over (DTO)
    Backorders
  • Reduce Organic Depot Awaiting Parts (AWP) Levels
  • Support CNO Cost-Wise Readiness Objectives
  • Implement Ready For Tasking (RFT) Focus
  • Expand Utilization of Performance Based Logistics
    (PBLs)

The War On Terror And The Battle Against Cost
... We Must Win Both
3
Decrease Customer DTO Backorders
Backorder Breakdown (NAVICP Managed Items)
  • Observations
  • DTO slice of the pie is too big
  • We must do a better job of filling outfittng /
    stock rqmts to prevent DTOs
  • To succeed, we must reinforce our day to day
    efforts on basic business

F M S
Outfitting
DTO
Stock
4
Decrease Customer DTO Backorders
The Way Ahead
  • Reinforce sound supply chain management practices
  • as part of day to day business operations
  • Continually improve requirements forecasting
  • Execute timely placement of procurements
  • Ensure on-time delivery of all due-in material
  • Pursue aggressive expediting, where required
  • Utilize intense customer collaboration to
    prioritize efforts

Focus on the Basics
5
Reduce Organic Depot AWP
Fleet Readiness Center AWP Scorecard
FRC
Bottomline Need To Reduce The Negative Trends
6
Reduce Organic Depot AWP
What We're Doing
  • Continue aggressive interface with FRC-Ds / DLA
  • Validate requirements, target expediting, and
    discuss select inhibitors
  • Focus on AWP with BBs, overaged AWP, and AWP with
    single downers
  • Review growth in local purchase/local manufacture
    requirements
  • Reinforce process discipline and reconcile data
    bases
  • Conduct DLA site visits ICP AWP Summit Business
    meetings
  • Assemble and disseminate AWP report card
  • Develop AWP Entitlement metric
  • NAVICP developing with DSCR, FRC-D
    supply/production reps, NAVAIR
  • Entitlements set by site, based on historical
    induction rates, budgeted delay time

7
Implement Ready for Tasking (RFT) Focus
RFT Overview
  • RFT Defined The right readiness, at the right
    time, at the right cost
  • Amount of required readiness for any given
    aircraft is determined by mission
  • RFT replaces traditional Full Mission Capable
    (FMC) standard... Aircraft and all mission
    systems ready at any given time
  • RFT creates some Initial Support Challenges
  • RFT is dynamic...must be defined for each T/M/S
    and each mission...effort is in its infancy
  • Virtually all current metrics are based on FMC
    standard...RFT will demand revised metrics to
    properly focus support efforts

Paradigm Shift From Readiness At All Costs To
Cost-wise Readiness
8
Implement Ready for Tasking (RFT) Focus
Current Effort
  • The Naval Aviation Enterprise (NAE) is working
    three FY07 goals to support RFT attainment
  • Achieve necessary RFT gap closure
  • Identify and prioritize systems degrading RFT
  • Improve reliability of RFT degraders

Right readiness, right time
RFT Availability (E-2C)
RFT Entitlement
RFT Gap
Degraded RFT
Actual RFT
9
Implement Ready for Tasking (RFT) Focus
E-2C Example
10
Expand Utilization of PBLs
The Essence of PBLs
  • What we buy
  • Comprehensive performance package... not
    individual parts
  • Value Proposition
  • Substantially improved performance at less than
    or equal to cost
  • Why they work
  • Government sets performance, establishes
    long-term fixed price relationship ... Fixed
    price "pay for performance" contract motivates
    vendor to reduce failures / consumption
  • Long term commitment enables vendor to balance
    risk vs. investment

Vendor asked to provide superior performance
at no additional cost
A Reengineering Tool To Improve Readiness Through
Improved Reliability And Better Availability
11
Expand Utilization of PBLs
PBL Program Performance
Availability
Reliability
Inventory Reduction
H-60 FLIR ... 40 increase ALR-67 (v)3
Radar Warning Receiver- 53 increase
Aviation Tires ... - Wholesale
Inventory reduced by 90 - Plane-side
inventories reduced by 66
F/A-18 SMS - availability was 65 ... now 98
ARC - 210 Radio availability was 70 ...
now 85 APU - availability was 70 ... now
95 F404 engine availability was 43 ... now
99
12
Expand Utilization of PBLs
Current Enterprise Objectives
  • PBL Cost Reduction
  • - Reduce the cost of PBLcontracts renegotiated
    inFY07 by an average of 2
  • Reduce AVDLR costs for items supported by PBLs
    renegotiated in FY07
  • Support NAE cost-wise readiness goals and
    objectives

PBL Demand Coverage Goal
- Increase aviation demand covered
by PBL contract to 28 by
the end of FY07 Benefits -
Enhance supply support at equal or lower
cost - Achieve select reliability
improvements - Support NAE RFT and
ACWT goals and objectives
13
Summary
  • NAVICP Top Priority is Meeting Enterprise
    Performance Expectations

as defined by
CNO Guidance and Our Customers
while
Improving the Supply Chain and Reducing Life
Cycle Costs
Write a Comment
User Comments (0)
About PowerShow.com