Title: Road infrastructure construction projects


1
Road infrastructure construction
projects Operational Programme Transport 2007
2013
Bulgarian Economic Forum 26 27th November
2009 Sofia, Sheraton Hotel
1
2
  • Road Infrastructure Agency is the only
    beneficiary on Priority Axis II Development of
    road infrastructure along the major national and
    Pan-European transport axes.
  • On Operational Programme Transport 2007 2013
    there are planned 990 million for construction
    of 213 km motorways and 69 km I class roads, part
    of the Pan-European transport corridors.

4
3
Projects in Operational Programme Transport
  • 1. Trakia MW (from Sofia to Burgas) 115 km
    350 Million Euro
  • 2. Mariza MW (from BG to TR) 67 km 208
    Million Euro
  • 3. Struma MW (from BG to GR) 132 km 250
    Million Euro
  • 4. Kardshali Podkova (from BG to GR) 28 km
    32 Million Euro
  • 5. Hemus MW (from Sofia to Varna) 8.5 km
    32 Million Euro
  • 6. ?-79, Vraza Botevgrad (north of Sofia)
    31 km 85 Million Euro
  • ?-79, Vidin Montana (from RO to BG) 20 km
    32 Million Euro

S 990 Million Euro
5
4
Projects on Operational Programme Transport
6
5
Trakia MW, Lot 2 Stara Zagora Nova Zagora
from km 210200 to km 241900 Lot length
31.800 km
Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
  • The tender procedure for construction is ongoing
  • Selection of Contractor and signature of
    contract April 2010
  • End of construction Summer 2012
  • Tentative cost of the investment in euro 96
    million euro
  • The farm lands are acquired, in procedure is
    excluding of the Forest Fund from Executive
    Forest Agency
  • The archeological surveys will be closed till May
    2010

7
6
Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
Trakia MW, Lot 3 Nova Zagora Yambol from km
241900 to km 276200 Lot length 35.697 km
Start of the tender procedure December
2009/January 2010 End of construction Summer
2012 Tentative cost of the investment in euro108
million euro
8
7
Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
Trakia, Lot 4 Yambol - Karnobat from km 276200
to km 325280 Lot length 47.683 km
Start of the tender procedure Spring 2010 End
of construction Autumn 2012 Tentative cost of
the investment in euro 146 million euro
9
8
Maritza Motorway km 5 km 72
The project includes construction of a new
motorway section with a total length of 67 km.
  • Start of the tender procedure In the Autumn of
    2010
  • Signature of Contracts for construction and
    supervision end of 2010/ beginning of 2011
  • End of construction Spring 2013
  • Cost 208 Mil Euro

10
9
Struma Motorway
Length for construction 132 km Indicative cost
of project 250 mil. Land Acquisition end of
2010 Archeological surveys till November
2010 Contracts for construction and supervision
for Lot 1 and Lot 4 first half of 2011. Lot 2 -
The preparation of tender documentation for
design is ongoing. Lot 3 - The Technical design
will be prepared with financing from the
Technical Assistance of the Operational Program
Transport. The preparation of Application form
for financing of technical design of Lot 3 is
forthcoming.
11
10
Hemus Motorway Section Sofia Ring Road
Yana road junction from km 0 to km 8460.
This connection is part of the Trans-European
Transport Corridor No IV. The total length of
the new construction project is 8,5km and will
connect the existing section of Hemus Motorway
with the Sofia Ring Road.
Start of the tender procedure Spring of 2010
Selection of Contractor Summer of 2010 End of
construction Spring of 2012 Tentative cost of
the investment in euro 32 million euro
12
11
  • Road I-5 Kardzhali Podkova

The project is part of the Pan-European Transport
Corridor No. IX. The project includes
rehabilitation of 8 km of the existing road and
24 km new construction from Kardzhali to
Podkova.
Start of the tender procedure Autumn of 2010
Selection of Contractor Spring of 2011
End of construction Spring of
2013 Tentative cost of the investment in euro 32
million euro
13
12
?I. Road infrastructure projects for design 2010
2013 Construction 2014 2020
14
13
  • Lot 3 /Blagoevgrad - Sandanski/
  • Total length 61 km
  • It has 3 main sections
  • 3.1 - Blagoevgrad Krupnik the site shall be
    designed in 2010 - 2011
  • 3.2 Krupnik Kresna (Kresna defile) 4 km
    viaducts and 16 km tunnels
  • 3.3 - Kresna Sandanski the site shall be
    designed in 2010 - 2011

15
14
Trakia MW Lot 6 (Black Sea) The site is part of
the Pan-European Transport Corridor No. VIII and
connects the two biggest ports of the Republic of
Bulgaria Varna and Burgas Length100
km Indicative cost 350 million
16
15
Sofia Kalotina MW
Length 50 km Indicative cost 150 million
17
16
Sofia Gyueshevo MW
Length 85 km Indicative cost 260 million
18
17
Shipka Tunnel
The total site length is approx. 3.2 km
19
18
Thank you for the attention!