Title: Road infrastructure construction projects
1Road infrastructure construction
projects Operational Programme Transport 2007
2013
Bulgarian Economic Forum 26 27th November
2009 Sofia, Sheraton Hotel
1
2- Road Infrastructure Agency is the only
beneficiary on Priority Axis II Development of
road infrastructure along the major national and
Pan-European transport axes. - On Operational Programme Transport 2007 2013
there are planned 990 million for construction
of 213 km motorways and 69 km I class roads, part
of the Pan-European transport corridors.
4
3Projects in Operational Programme Transport
- 1. Trakia MW (from Sofia to Burgas) 115 km
350 Million Euro - 2. Mariza MW (from BG to TR) 67 km 208
Million Euro - 3. Struma MW (from BG to GR) 132 km 250
Million Euro - 4. Kardshali Podkova (from BG to GR) 28 km
32 Million Euro - 5. Hemus MW (from Sofia to Varna) 8.5 km
32 Million Euro - 6. ?-79, Vraza Botevgrad (north of Sofia)
31 km 85 Million Euro - ?-79, Vidin Montana (from RO to BG) 20 km
32 Million Euro
S 990 Million Euro
5
4Projects on Operational Programme Transport
6
5Trakia MW, Lot 2 Stara Zagora Nova Zagora
from km 210200 to km 241900 Lot length
31.800 km
Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
- The tender procedure for construction is ongoing
- Selection of Contractor and signature of
contract April 2010 - End of construction Summer 2012
- Tentative cost of the investment in euro 96
million euro - The farm lands are acquired, in procedure is
excluding of the Forest Fund from Executive
Forest Agency - The archeological surveys will be closed till May
2010
7
6Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
Trakia MW, Lot 3 Nova Zagora Yambol from km
241900 to km 276200 Lot length 35.697 km
Start of the tender procedure December
2009/January 2010 End of construction Summer
2012 Tentative cost of the investment in euro108
million euro
8
7Sections of Trakiya MW in exploitation
Projected sections of Trakiya MW
Trakia, Lot 4 Yambol - Karnobat from km 276200
to km 325280 Lot length 47.683 km
Start of the tender procedure Spring 2010 End
of construction Autumn 2012 Tentative cost of
the investment in euro 146 million euro
9
8Maritza Motorway km 5 km 72
The project includes construction of a new
motorway section with a total length of 67 km.
- Start of the tender procedure In the Autumn of
2010 - Signature of Contracts for construction and
supervision end of 2010/ beginning of 2011 - End of construction Spring 2013
- Cost 208 Mil Euro
10
9Struma Motorway
Length for construction 132 km Indicative cost
of project 250 mil. Land Acquisition end of
2010 Archeological surveys till November
2010 Contracts for construction and supervision
for Lot 1 and Lot 4 first half of 2011. Lot 2 -
The preparation of tender documentation for
design is ongoing. Lot 3 - The Technical design
will be prepared with financing from the
Technical Assistance of the Operational Program
Transport. The preparation of Application form
for financing of technical design of Lot 3 is
forthcoming.
11
10 Hemus Motorway Section Sofia Ring Road
Yana road junction from km 0 to km 8460.
This connection is part of the Trans-European
Transport Corridor No IV. The total length of
the new construction project is 8,5km and will
connect the existing section of Hemus Motorway
with the Sofia Ring Road.
Start of the tender procedure Spring of 2010
Selection of Contractor Summer of 2010 End of
construction Spring of 2012 Tentative cost of
the investment in euro 32 million euro
12
11- Road I-5 Kardzhali Podkova
The project is part of the Pan-European Transport
Corridor No. IX. The project includes
rehabilitation of 8 km of the existing road and
24 km new construction from Kardzhali to
Podkova.
Start of the tender procedure Autumn of 2010
Selection of Contractor Spring of 2011
End of construction Spring of
2013 Tentative cost of the investment in euro 32
million euro
13
12?I. Road infrastructure projects for design 2010
2013 Construction 2014 2020
14
13- Lot 3 /Blagoevgrad - Sandanski/
- Total length 61 km
- It has 3 main sections
- 3.1 - Blagoevgrad Krupnik the site shall be
designed in 2010 - 2011 - 3.2 Krupnik Kresna (Kresna defile) 4 km
viaducts and 16 km tunnels - 3.3 - Kresna Sandanski the site shall be
designed in 2010 - 2011
15
14Trakia MW Lot 6 (Black Sea) The site is part of
the Pan-European Transport Corridor No. VIII and
connects the two biggest ports of the Republic of
Bulgaria Varna and Burgas Length100
km Indicative cost 350 million
16
15Sofia Kalotina MW
Length 50 km Indicative cost 150 million
17
16Sofia Gyueshevo MW
Length 85 km Indicative cost 260 million
18
17Shipka Tunnel
The total site length is approx. 3.2 km
19
18Thank you for the attention!
20