WG3 Presentation to SC4 Opening Plenary - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

WG3 Presentation to SC4 Opening Plenary

Description:

Converted from WD1 System Engineering perspective to 'proper EXPRESS' representation ... based upon AP203E2 short form, the new EA IRs, and earlier AP209 work ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 22
Provided by: gerald91
Category:

less

Transcript and Presenter's Notes

Title: WG3 Presentation to SC4 Opening Plenary


1
WG3 Presentationto SC4 Opening Plenary
  • Gerry Radack, Convener
  • Vico Equense, Italy
  • 2006-03-06
  • 0800 1000

2
Plenaries
  • Monday 1030-1200
  • Thursday 1600-1730

3
WG3 Teams
  • T01 Shape Representation
  • Goult, Ray J LEADER
  • T04 Materials
  • Moreno, Anna LEADER
  • Swindells, Norman DEPUTY
  • T08 Product Life Cycle
  • King, Timothy LEADER
  • URen, Jim DEPUTY
  • T09 Engineering Analysis
  • Hunten, Keith LEADER
  • T10 Electrical/Electronics
  • Klein, Lothar LEADER
  • Thurman, Thomas R DEPUTY
  • T19 Mechanical Products
  • Ungerer, Max LEADER
  • T22 Building and Construction
  • Haas, Wolfgang LEADER
  • Terai, Tatsuo DEPUTY
  • Kim, Inhan DEPUTY
  • T23 Ships
  • Barter, Mike LEADER
  • Mays, James L LEADER
  • T24 Manufacturing
  • Hardwick, Martin LEADER
  • Sakamoto, Chiaki DEPUTY
  • T25 Oil, Gas, Process and Power
  • Sandsmark, Nils LEADER
  • van Exel, Paul DEPUTY

4
T01 Shape Representation
  • Accomplishments since Hangzhou
  • Ballot issues on ISO 15926-3 (Geometry and
    Topology) resolved
  • New Draft of 15926-3 for review prior to release
  • Draft CD of PDQ-Shape document prepared

5
T01 Shape Representation
  • Plans for Vico Equense
  • Review ballot resolutions for ISO 15926-3
  • Review new draft of 15926-3 (with T25)
  • Review CD draft of PDQ-Shape document

6
T01 Shape Representation
  • Schedule for Vico Equense
  • Monday, 2006-03-06, 1330-1730
  • Discuss CD draft of Product Data Quality - Shape
    part 59 (Joint meeting with Parametrics).
  • Tuesday, 2006-03-07, 0800-1200
  • Review of early ballot comments on parts 111 and
    112, plus further review of part 59 (Joint
    meeting with Parametrics)
  • Tuesday, 2006-03-07, 1330-1730
  • Review of ISO 15926-3 TS
  • with T25
  • continue Wednesday 1330 if needed
  • ...

7
T08 Product Life Cycle
  • Accomplishments since Hangzhou
  • AP 233
  • Converted from WD1 System Engineering perspective
    to proper EXPRESS representation
  • New modules uploaded
  • AP 236
  • Resolved all SEDS

8
T08 Product Life Cycle
  • Plans for Vico Equense
  • AP 233
  • Review modules to ensure that they capture
    Systems Engineering requirements
  • Prepare for CD
  • AP 236
  • Plan for retailer implementation
  • Work on IS document

9
T09 Engineering Analysis
  • Accomplishments since Hangzhou
  • Participated in Binary file project
  • Attended workshop at NCSA (University of Illinois
    Champaign-Urbana) in US
  • Continued AP209E2 modularization
  • Created a prototype long form based upon AP203E2
    short form, the new EA IRs, and earlier AP209
    work
  • Completed the publication of Part 107 IS document
    in HTML using STEPMod

10
T09 Engineering Analysis
  • Plans for Vico Equense
  • Publication of remaining EA IRs (52, 53, 110)
  • Part 53 first pass complete save for fundamental
    concepts and assumptions clause
  • AP 209 e2 modularization and extension to fluid
    dynamic and thermal analyses
  • EXPRESS binary representation

11
T09 Engineering Analysis
  • Schedule for Vico Equense
  • Attend EXPRESS Binary Data Project as possible
  • Monday Afternoon, Thursday
  • Publication of EA IRs (primarily 53, and looking
    foirward to 52, 110)
  • AP209 e2 modularization and extension to fluid
    dynamic and thermal analyses

12
T23 Ship Team
  • Accomplishments since Hangzhou
  • AP 227 e22005 published
  • NSRP pilot demonstration using test ship design
    planned for April in Washington DC on
  • AP 215 (ship arrangement)
  • AP 212 (electrotechnical design and installation)
  • AP 209 for Engineering Analysis and
  • AP 218 for Steel Processing.
  • NSRP Implementation Forum is doing AP 216 testing
    on pre-production software

13
T23 Ship Team
  • Plans for Vico Equense
  • No meeting planned
  • TBD 2006-06-25/30 Toulouse, France
  • TBD 2006-10-22/27 Hershey, PA, United States

14
T24 Manufacturing
  • Accomplishments since Hangzhou
  • AP 224 ed3 IS sent to Geneva
  • AIC 522 ed2 IS sent to Geneva
  • AP 219 DIS sent to Geneva
  • AP 223 CD ballot in progress
  • AP 229 NWI ballot in progress

15
T24 Manufacturing
  • Plans for Vico Equense
  • Plan demonstrations in Toulouse
  • Prepare scope for NWI on CNC Traceability
  • Review scope and status of APs
  • Meet with T60 on gears

16
T24 Manufacturing
  • Schedule for Vico Equense
  • Monday, 2006-03-06, 1330-1730
  • Status update of all APs
  • Status update on AP-238 CC2 implementation
  • Status update on AP-224/AP-240/AP-238 integration
  • Planning for demonstrations in Toulouse
  • Tuesday, 2006-03-07
  • Review of CNC Traceability model
  • Scoping for CNC Traceability model
  • Further planning for Toulouse demonstration

17
T24 Manufacturing
  • Schedule for Vico Equense
  • Wednesday, 2006-03-08
  • Review of AP-229 forging model
  • Review of AP-223 casting model
  • Review of AP-219 inspection model
  • Thursday, 2006-03-09
  • Meet with TC60 to discuss Gears and AP-224
  • Meet with Lothar Klein to discuss modeling issues

18
T25 Oil, Gas, Process and Power
  • Accomplishments since Hangzhou
  • AP 221 DIS ballot successful. Ballot issues
    resolutions prepared
  • ISO 15926-3 NWI/CD/TS participation from five
    nations secured
  • ISO NWI/TS 15926-4 Pilot ballot resolution
    progressed
  • ISO15926-5 draft terms of reference prepared
  • ISO 15926-6 revised working draft prepared
  • ISO 15926-7 NWI/CD/TS ballot resolution progressed

19
T25 Oil, Gas, Process and Power
  • Plans for Vico Equense
  • Resolve ballot issues for AP 221 DIS
  • Review ISO CD/TS 15926-3 draft (Joint with T1 and
    WG12)
  • Review ISO CD/TS 15926-4 draft
  • Review ISO 15926-6 WD
  • Review progress on ISO15926-7 CD/TS ballot issues
    resolution
  • Review study on ISO 15926-7, Gellish Tables, AEX
    methodology, XMpLant, and NE 100
  • Review progress and plan further work on the PWI
    for Process Monitoring Data
  • Participate in the ad-hoc work group on a MA for
    reference data

20
T25 Oil, Gas, Process and Power
  • Schedule for Vico Equense
  • Monday
  • 1330-1730 T25 - Oil, Gas, Process and Power
    plenary Reports on progress and plans
  • Tuesday
  • 0800-1000 ISO10303-221 DIS Ballot Comments
    Workshop
  • 1030-1200 Review study on ISO 15926-7, Gellish
    Tables, AEX methodology, XMpLant, and NE 100
  • 1330-1730 Meet with WG12 and WG3/T1 to review
    ISO CD/TS 15926-3 draft
  • Wednesday
  • 1030-1730 MA for reference data
  • Thursday
  • 1030-1200Review TS draft of ISO 15926-4 and WD
    draft of ISO 15926-6

21
Vacancies
  • Deputy leaders of T1, T9, T19
  • T19 experts
Write a Comment
User Comments (0)
About PowerShow.com