1
Status of Beam-Beam CompensationFebruary 05
  • Vladimir Shiltsev

2
General Comments
  • 3.5 hours of beam studies in parallel with IBS
    experiment
  • used for checking optimum alignment
  • nothing new found, poor lifetime at dQ0.004
  • Situation with man-power is improving
  • Visitors from IHEP helped in Oct-Dec, one more in
    Feb
  • EE support help growing (Bob H, Howie)
  • Cryo guys on high gears
  • Kip is out (Feb 7th) but ?
  • Seva Kamerdzhiev of GSI has accepted RA offer
  • Tan J.-P.Carneiro (new RA) work on versions of
    BBQ

3
Hardware Status
  • Magnets
  • low current tests OK (50A), found cryo problem
    (N2 to He)
  • test in February (Klebaner, Martinez, IHEP rep)
    ? decision
  • 2kA test and measurements at E4R (IHEP Zhang)
  • QPM and PSs
  • In good shape, tests to start Feb 9 (Hively)
  • TEL-2 electro-vacuum parts
  • SEFT e-gun - parts by Feb 15, assembled by Mar
    1
  • remaining parts of vacuum system designed by
    Mar 15, parts by May 15
  • collector - design by Sep
  • ion pumpsm gauges, etc - - in good shape
  • Cryo
  • byspass with spare started design, be ready by
    shutdown
  • 14kV HV Modulator RD
  • Specs sent (H.Pfeffer), no response yet

4
TEL-2 E4R
5
Diagnostics/Controls
  • TEL BPMs
  • develop HV pulser, calibrate TEL-1 and 2
  • no progress yet
  • Tune Measurements
  • build a system and explore gated noise with 1.7
    GHz Schottky and 21 MHz PLL no progress
  • same with baseband Schottky/PLL Tan has
    preliminary results, Lebedev, Semenov and
    Carneiro started gated BBSchottky
  • Loss monitors
  • an application reporting running averages
    B0PLOS, D0AHTL no progress
  • Controls
  • write OAC to stabilize e-beam position wrt
    proton (pbar) orbit
  • write T74 subpages for TEL-2
  • No progress