4-Hybrid Thermal Test System Status
Sam Burke UCSB HEP Group
2
Progress
  • Thermoelectric (TE) Power Supply Tested in
    Constant Current Mode
  • Temperature and Humidity Sensors in hand
  • 6ft Rack Located in basement
  • New Transformer for Coolie Box on order
  • New TE power connectors ordered

3
Equipment Rack
4
Current Needs
  • NIM Crate
  • NIM Pulse Generator
  • NIM-TTL-NIM Converter
  • NIM OR Logic Module

5
Current Needs
  • Dedicated PC setup with bar code reader, serial
    port, 2 PCI slots for Aachen modules
  • Table to hold Test Chamber and PC (next to rack)
  • New Coolie Box back panel
  • Plumbing (airwater) design

6
Future Plans
  • Test Coolie Box
  • Communicate with Digital Temperature Sensors
  • Install equipment in rack
  • Order Thermoelectric Element
  • Design Temp Sensor PC Card