VISTAS and CALPUFF Modeling for BART - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

VISTAS and CALPUFF Modeling for BART

Description:

BART analysis degree of visibility improvement for various emission reduction strategies. ... VISTAS 12 km domain (possibly several 4 km sub-domains), based ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 12
Provided by: tomr183
Category:

less

Transcript and Presenter's Notes

Title: VISTAS and CALPUFF Modeling for BART


1
VISTAS and CALPUFF Modeling for BART
  • Tom Rogers
  • Florida Department of Environmental Protection

2
Proposed BART Modeling Requirement
  • Individual source exemption must show source
    impact lt 0.5 dv on all days.
  • BART analysis degree of visibility improvement
    for various emission reduction strategies.
  • Optional cap and trade program must show better
    visibility improvement than individual BART
    determinations

3
Which Models Does the Proposed BART Rule Specify?
  • an air quality model able to estimate a single
    sources contribution to visibility impairment
  • CALPUFF is strongly preferred

4
VISTAS Would Like
  • To provide for consistent and level
    implementation of the modeling within the VISTAS
    states.
  • To assist states and BART-eligible sources in
    completing this modeling, and states in reviewing
    BART modeling submissions.
  • Provide for CALPUFF training to states and
    possibly others.

5
What Is VISTAS Doing?
  • Developing a Protocol for all VISTAS states to
    follow.
  • Obtaining a Contractor to help states and
    BART-eligible sources in the BART analysis.
  • Obtain different Contractors to help states
    review BART-modeling.

6
VISTAS Draft Recommendations
  • May use a Q/D approach to screen BART-eligible
    sources for the determination of exemption.
  • Develop common CALMET dataset over the VISTAS 12
    km domain (possibly several 4 km sub-domains),
    based on 2001, 02, 03 MM5 data.

7
(No Transcript)
8
VISTAS Draft Recommendations
  • Possibly run CALPUFF for individual BART-eligible
    sources to determine if exempt.
  • Limited to SO2, NOx, primary sulfate and nitrate,
    and select other PM.
  • Still not sure what to do with VOC (CMAQ?)
  • Possibly (but less likely) run CALPUFF for
    selected individual BART analyses.

9
VISTAS Draft Recommendations
  • Details in the protocol for the CALMET, CALPUFF,
    CALPOST methodology will be developed with the
    assistance of the contractor.
  • The protocol will provide different procedures
    and methods for source-receptor distances of
  • Less than 50 km
  • 50 to 200 km
  • Greater than 200 km

10
What Does This Mean to States?
  • States still in charge. May allow deviation from
    the protocol for a BART-eligible source if
    appropriate.
  • All states and BART-eligible sources are strongly
    encouraged to use the common CALMET data.

11
What Does This Mean to States?
  • State may choose to have the contractor do some
    CALPUFF modeling.
  • State may choose to have VISTAS contractor review
    CALPUFF modeling performed by a BART-eligible
    source.
Write a Comment
User Comments (0)