Environmental Information eXchange Network - PowerPoint PPT Presentation

About This Presentation
Title:

Environmental Information eXchange Network

Description:

Goal Create critical mass by end of 2004. 3 Measures with Specific Targets. 3 ... WY. KY. NC. GA. Last Update Feb 17, 2005. MO. VA. IN. SC. MI. eDMR. MI. WI ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 16
Provided by: hul6
Category:

less

Transcript and Presenter's Notes

Title: Environmental Information eXchange Network


1
State/EPA Environmental Information Exchange
Network Progress Report Presented by Melanie
Morris, Network Steering Board Member February
28, 2004
2
CY 2004 Performance Measures
  • Focus on both building infrastructure and
    exchanging data
  • Goal Create critical mass by end of 2004
  • 3 Measures with Specific Targets

3
Performance Goal 1
Success is defined as data flowing through to
destination systems with no diminution of
service.
Targets by Flow
4
Performance Goal 2
  • Success is defined as States that are capable of
    multiple flows (two or more) to partners.
  • Target 10-14 States doing multiple flows by end
    of 2004

5
Performance Goal 3
  • Success is defined as having the technical
    architecture in place by having partners
    establish fully functional Nodes.
  • Target 35 Nodes by the end of 2004

6
HOW DID WE DO???
7
Performance Goal 1 Targets
Summary Exceeded FRS (new data to EPA) Lots of
states ready for NEI in Spring 05 RCRAInfo and
SDWIS not available until end of CY2004 The
only one that got easier was FRS
Type Schema/EPA Can Receive and Process Goal Progress
FRS Yes/Yes 20 25
Beaches Yes/Yes 7 3
NEI Yes/Yes 12 6
PCS/IDEF Yes/Yes 10 2
RCRAInfo Yes/Yes 10 3
SDWIS Yes/Yes 10 3
Only 1 of 2 modules can be processed by EPA
PCS/IDEF is scheduled not available to all
Only RCRAInfo Handler can be processed by
EPA Available in December 2004
8
Performance Goal 2 States with Multiple Flows
  • Met goal with 10 states with more than 1 data
    flow
  • OR FRS, PNNWQX, NEI, Hazardous Waste
    Transporters (4) with RCRA Handler coming soon!
  • WA FRS, PNNWQX, Hazardous Waste Transporters,
    Fish Tissue with DOH (4)
  • NJ Beaches, FRS, NEI (3) with SDWIS coming soon
  • DE Beaches, NEI, and PCS/IDEF (3)
  • NH Beaches, RCRAInfo Handler, FRS (3)

9
Performance Goal 2 States with Multiple Flows
(contd)
  • Met goal with 10 states with more than 1 data
    flow (contd)
  • NY FRS, SDWIS
  • MI DMR, TRI
  • ME SDWIS, FRS
  • MD SDWIS, FRS
  • MS FRS, RCRAInfo Handler

10
Status of Network NodesDecember 31, 2004 31
Operational
WA
MT
ME
VT
ND
OR
MN
OR
NH
NH
ID
WI
SD
NY
MA
AK
WY
MI
RI
IA
CT
PA
PA
NE
NJ
NV
OH
IN
IL
UT
DE
CO
MD
WV
WV
CA
VA
KS
DC
MO
KY
NC
TN
OK
AZ
NM
NM
NM
SC
AR
HI
GA
AL
MS
MS
TX
LA
FL
FL
11
Other things to Report
  • Reusable tools and software code developed and
    shared.
  • Some demonstrated Node Configurations being
    downloaded and installed in 1 day.
  • States developed sharable XML Style sheets to
    convert drinking water lab data to SDWIS
  • States developed sharable Beach Monitoring web
    tools Great Lakes States going to adopt
  • Looking at numbers
  • Thousands of new FRS records at EPA (according to
    Pat)
  • New Partners
  • States environmental agencies exchanging data for
    the first time
  • States giving access to their data to other State
    Departments (one gave a copy of their Node Client
    for the other department to use to do a Query off
    their Node)

12
Year End Reflections
  • We fell short on the State to EPA data flows but
    we learned these were harder throughout the year
  • New data flows we werent expecting
  • Hazardous waste transporters across states
  • DEP/DEQ and DOH exchanges
  • If we make the tools (schema, and NFC) and rules
    available..the Network works
  • Proven by states being able to do flows quickly
    when these tools and Nodes are in place
  • Success in reaching ultimate goal of obtaining
    critical mass on the Exchange Network.
  • End of the year (last 2 months) momentum was
    greatstates just didnt get Nodes up but they
    started doing multiple flows.

13
February 2005 Update
  • Nodes
  • Flows

14
Status of State Nodes - February 15, 2005
WA
MT
ME
VT
ND
OR
MN
OR
NH
NH
ID
WI
SD
NY
MA
AK
WY
MI
RI
CT
IA
PA
PA
NE
NJ
NV
OH
IN
IL
UT
DE
CO
MD
WV
WV
CA
VA
KS
DC
MO
KY
NC
TN
OK
AZ
NM
NM
NM
SC
AR
HI
GA
AL
MS
MS
TX
LA
FL
FL
15
Development is in process
NE
DE
MS
MA
TX
NJ
NM
MI
MS
OR
DE
NJ
VA
IA
WA
WV
Handler Module in Production Only
MS
DE
MA
OR
PA
NH
KY
WA
LA
NE
NY
ME
MD
IL
Development is in process
MD
UT
ME
MN
MT
VA
CT
AL
SD
IA
NY
WA
DE
MO
NC
ND
OR
WV
WI
MS
SC
NH
KS
NE
OH
AZ
CA
CO
ID
IL
IN
MI
NM
PA
NJ
WA
OR
ID
AK
WA
OR
NJ
NH
ME
VT
RI
VA
IN
SC
MI
DE
NH
NJ
GA
CA
NC
eDMR
MI
WI
FL
COLOR KEY
In Development Operational
WA
AZ
DE
LA
ME
OR
WV
MI
WI
MS
SC
NH
KS
OH
ID
IL
IN
MD
MA
MN
NE
PA
CT
GA
SD
ND
IA
NV
CA
CO
MO
NJ
NM
NY
OK
TX
UT
VT
MT
VA
WY
KY
NC
AK
AL
Last Update Feb 17, 2005
Write a Comment
User Comments (0)
About PowerShow.com