Title: EXPOSURE SCENARIO WORKSHOP 78'11'2006
1EXPOSURE SCENARIOWORKSHOP7-8.11.2006
- Contributions to Break-out session from Danish
Paint Association. - Helle Simon Elbro
2Lifecycle steps
Application of paint
Service life
Synthesis of substances
PROFESSIONAL
CONSUMER
Manufacturer
Waste
Waste
Waste
Waste
3Project partners
Application of paint
Service life
Synthesis of substances
PROFESSIONAL
CONSUMER
Manufacturer
Dyrup and FDLF
Arbejdsmiljøhuset (Danish Painters
Occupational Health Service)
BASF BP (DuPont)
Jotun and CEPE
4Basic principle of CASE work
- RIP 3.2.2 guidance (deliverables, p-TGD)
- Later we will work with the CEPE methods
- Dummy formulation
- Present focus Solvent
- Use and Exposure dialogue between M/I and DU
CSR
ES
Conditions for safe use
(DNEL/PNEC)
Hazard assessment
Exposure assessment
Risk assessment
5Using Tools Annex A-5Questionnaire on DU use
- Focus on use rather than product!
- Used as inspiration rather than all to be filled
out not all is relevant for all uses. - Missing questions especially on determinants of
Environmental Exposure. - Too many details?
- Yes, because not all can be communicated all the
way up the supply chain. - No, amount of details are necessary to assess the
exposure.
6Present status
- Filled out questionnaire A5 has been send to
supplier - Several phone conferences have been held with one
supplier - Clarification of overall process
- Missing details
- Working in buildings vs. construction
workNormal professionals vs. Specialized - Formation of aerosols (size spectrum)
- Type of air pressure used by professionals
- General information (e.g. Danish Code number
system)
7Overall ES process
First step Development of the generic ESs
(g-ES)
Next step At the point of Registration.
CSR safe use arguments
B
C
D
E
M/I A
g-ES
Use description
DU 1
2
3
4
5
Further uses downstream
RESULT
g-ES 1
2
3
4
5
8Generic Exposure Scenario (g-ES)Industry
standards
M/I
g-ES
HAZARD (DNEL PNEC )
ALGORITM Quantitative Exposure Assessment (Models,
Exp. Data, decision tree) ? RMM
USE descriptors (frequency, conc. )
DU
9Overall ES process
First step Development of the generic ESs
(g-ES)
Next step At the point of Registration.
g-ES 1
M/I A
B
C
D
E
Agency
M/I A
g-ES
Use description
SDS
g-ES 1
DU 1
2
3
4
5
DU 1
Further uses downstream
Detailed use description (incl. CBI)
g-ES 1
g-ES 1
2
3
4
5
Use inside or outside ES?