Title: Regional Cal. Trigger Milestone: Major Production Complete
1Regional Cal. Trigger Milestone Major Production
Complete
- Receiver Card Electron Isolation
Clock Jet/Summary
fraction tested (needed)
EISO
Front
55/153 tested (126)
3/25 tested (18)
Clock
Back
(19/25 Custom Backpl Tested) (18)
2RCT Full Crate Operating at CERN- U. Wisconsin
- Used for HCAL, Global Calorimeter Trigger
integration tests
x 18
Rear Receiver Cards
Front Electron, Jet, Clock Cards
3CSC Trigger Major Milestone Structured Beam Tests
Track-Finder Crate(next slide)
- First time used full Track-Finding logic to
identify tracks in data - Full DAQ logging of inputs and outputs for
offline comparisons - L1A generation a major synchronization
accomplishment for trigger - Provided trigger for other subsystems
- Marks beginning of CSC Trigger operations at CERN
4Track-Finder Crate at CERN-- Florida, Rice, UCLA
- System of multiple peripheral crates (multiple
Muon Port Cards) to TF crate - Synchronization studies
- Multiple Sector processors to one Muon Sorter
- Fully functional in Beam Tests
- Provides trigger for the experiment
- Operating now for Integration tests
SP1
SP2(x 12)
MS (x1)
x 1
L1A signal distributed out of crate from CCB
5CSC Trigger Muon Port Card Sector Processor
- Muon Port Card (Rice)
- 6 built w/FPGA mezzanines, fully tested in beam,
in radiation, in crate w/ 7 Trigger Motherboards
connected to Sector Processor - Final board (w/small changes) is under final
testing followed by production start.
- Sector Processor (Florida)
- PPP built tested in structured beam
- In production (1st 2 made)
- Total needed 12
15 X 1.6 Gb/s optical links from MPC
Xilinx Virtex-2 800 User I/O
6Trigger Completion
- Operate fully functional trigger electronics at
CERN - Employed in myriad tests preparation activities
- Tests in Electronics Integration Center
- Prevessin 904 (see next slide)
- Labs row of racks for all electronics
subsystems - Test interfaces integration as much as
possiblebefore move to USC55 or slice tests - Surface Magnet tests in SX5
- With both HCAL and EMU
- More during magnet test
- Verify trigger functions interfaces w/detectors
on surface. - Installation in Underground CountingRoom (USC55)
- Expect start in December --ready for crates
- Racks Infrastructure installed
UndergroundCounting Room
7Trigger Install/CommissionPath to USC55 thru
Prevessin 904
- Assemble one each of critical racks in central
trigger core in underground counting room
Electronics Labs
trigger electronics integration racks
Contingency in case of further delays in USC 55
occupancy
Starts Now