2003 Spring Simulation Interoperability Workshop - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

2003 Spring Simulation Interoperability Workshop

Description:

Provide implementation and usage information. Provide HLA BOM ... Ability to ease transition from old formats to new. Effects level simulation of JTIDS net ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 26
Provided by: pubS5
Category:

less

Transcript and Presenter's Notes

Title: 2003 Spring Simulation Interoperability Workshop


1
2003 Spring SimulationInteroperability Workshop
  • Link 16 Product Development Group (Link 16 PDG)

2
Link 16 PDG Spring 03 SIW Morning Agenda
  • 1015 1030 Introduction, Opening Comments
    (Adin Burroughs)
  • -Review of Action Items (Dr. Rob Byers) 
  • 1030 1100 03S-SIW-72, Representation of Link
    16 Communications
  • in the Joint Distributed Engineering Plant
  • (Mr. Zach Furness)
  • 1100 1200 Technical Discussions on High
    Fidelity Implementations
  • (James Nutaro)
  • -1100-1115 Review of current issues with
    synchronization
  • -1115-1130 RELNAV and RTT Experimentation
  • Requirements and Solutions
  • -1130-1200 High Fidelity Synchronization
    Proposal
  • 1200 1315 Lunch

3
Link 16 PDG Spring 03 SIWAfternoon Agenda
  • 1315 1700 03S-SIW-142, Draft Link 16
    Simulation Standard
  • -1315-1330 Introduction and Review of
    Sections 1 through 4
  • -1330-1415 Review of Section 5.1 (General
    Requirements)
  • -1415-1500 Review of Section 5.2 (DIS
    Implementation)
  •  1500 1515 Break 
  • -1515-1600 Review of Section 5.3 and Annex A
    (HLA Implementation)
  • -1600-1630 Review of Informative Annexes
    (Implementers Guidelines, Analysis)
  •   -1630 1700 03S-SIW-79, SIMPLE to DIS-J
    Annex 
  • 1700 1715 Meeting Wrap-up
  • -Review of action items (Dr. Rob Byers)
  •  1715 Adjourn Link 16 PDG
  • Meeting minutes will be taken by Dr. Rob Byers

4
SISO Tactical Datalink Study GroupLink 16
Product Development Group
  • Introduction to Study Group and Product
    Development Group

5
Link 16 PDG Goals
  • Create Implementable SISO Standard from TDL SG
  • Nominally referred to as DIS-J and HLA-J
  • Provide DIS technical solution
  • Provide HLA technical solution
  • Provide implementation and usage information
  • Provide HLA BOM
  • Provide materials to understand usage of the
    standard
  • Provide guidance for eventual incorporation into
    IEEE standards
  • PDG will concentrate on codifying and validating
    TDL SG identified technical solutions

6
SG and PDG Leadership
  • Adin Burroughs, Northrop Grumman IT
  • TDL SG and Link 16 PDG Chair
  • Joe Sorroche, TACCSF/ASRCC
  • TDL SG and Link 16 PDG Vice Chair
  • Neil Barrett, JITC
  • TDL SG Vice Chair Link 16 PDG Assistant Editor
  • Dr. Rob Byers, Northrop Grumman IT (DMT
    Standards)
  • TDL SG and Link 16 PDG Secretary

7
SG and PDG Membership
  • Boeing
  • VWC
  • DMT
  • Lockheed Martin
  • DMT
  • TACCSF
  • Northrop Grumman
  • Information Technology
  • Integrated Systems
  • Stasys
  • TRW
  • ASTi
  • General Dynamics
  • QinetiQ
  • ASRCC
  • SRC
  • MRI
  • MsTI
  • 3Com
  • Simulation, Inc
  • APC
  • CAS
  • Marzen
  • AMS
  • Plexsys
  • Raytheon
  • USAF/AFC2TIG
  • Australia Virtual Ship
  • USAF/AFAMS
  • USAF/AFRL
  • USAF/ASC
  • USAF/ASC-TM
  • USAF/DMT
  • USAF/NAIC
  • USAF/TACCSF
  • DMSO
  • Sparta
  • US Navy
  • US Army
  • DISA/JITC

8
SG and PDG History
  • Oct 01 Formed grass roots working group after
    community response to informal inquiries
  • Nov 01 Meeting at I/ITSEC
  • Initial Presentation of ideas, technical
    discussion
  • Decided to pursue becoming official SISO Study
    Group
  • Dec 01 SISO EXCOM Approves TOR
  • Feb 02 SG Reflector, AFAMS webpage established
  • Mar 02 First official meeting of TDL SG (Spring
    SIW)
  • Jun 02 Interim SG meeting at TACCSF
  • Jul 02 SG Meeting at Euro-SIW
  • Sep 02 SG Meeting at Fall SIW
  • Oct 02 Link 16 PDG Kickoff

9
SG and PDG Current Status
  • DIS and HLA structures and methodologies defined
  • Finishing guidelines for HLA Ultra High
    Fidelity Synchronization
  • Initial Draft of SISO STD-002 released
  • Document being reviewed in the afternoon
  • Appendixes under consideration

10
SG and PDG Current Status
continued
  • Reference Implementation by Northrop Grumman IT
  • Funded by USAF Agency for Modeling and Simulation
    under Joint Synthetic Battlespace Infrastructure
    Initiative
  • Being implemented in CCD Product
  • Fidelity Level 3 testing complete on 21 Mar

11
SG PDG Spring 03 Update Way Ahead
  • Complete submittals of changes to DIS-EBV (Mar
    03)
  • Complete Link 16 Simulation Standard
  • Second Draft at Euro 03 SIW
  • Form Ballot Groups (August 03)
  • Release Final Draft by Fall 03 SIW
  • Enter Balloting (September 03)
  • Brief NATO C3A TDL ITS (September 03)
  • Next Years Terms Of Reference for TDL Study
    Group?
  • Link 11A, 22, TIBS

12
Challenges with CurrentDIS/HLA Standards
  • DIS Standard lacks detail for interoperability
  • DIS was never finished
  • No standard enumeration list for TDL types within
    DIS
  • Multiple DIS implementations in the wild
  • Ability to exchange TADIL J messages, no ability
    to simulate JTIDS networks
  • No methodology defined for HLA

13
Goals for New Standard
  • Standard, interoperable implementation
  • Easy initial implementation
  • Minimal impact on current users, e.g. NATO SIMPLE
    Standard
  • Ability to ease transition from old formats to
    new
  • Effects level simulation of JTIDS net
  • Ability to route datalink data separately from
    truth data
  • Minimize bandwidth utilization
  • Discrete definitions of fidelity
  • Identify FOM/SOM data items for HLA JTIDS
    emulation

14
Goals for New StandardEffects to Be Simulated
  • Timeslot allocation/metering of data with nominal
    values or from an actual NDL
  • Segmenting of data into NPGs
  • Segmenting of data into Nets
  • Multi-netting
  • Crypto-netting
  • Net entry procedures
  • Synchronization
  • Multiple NTRs

15
Goals for New StandardEffects to Be Simulated
continued
  • Relnav
  • Multiple JTIDS units transmitting at same time
  • Waveform/RF simulation
  • Antenna, propagation details
  • Additional JTIDS Datatypes
  • Link 16 Enhanced Throughput
  • VMF
  • Free Text (Voice/Imagery)

16
Goals for New StandardEffects Not Covered
  • Individual Pulses
  • Effects of conflicting pulses if hopping patterns
    coincide

17
Comparison/Contrast of DIS-J to SIMPLE
  • SIMPLE encompasses and wraps around DIS
  • Not only TADIL, but environment as well
  • TADIL-TALES is a part of DIS and HLA
  • TADIL-TALES currently only addresses Link 16
  • Other datalinks will be efforts of the Study
    Group over the next year
  • Does not address additional needs in the
    environment generation
  • TADIL-TALES addresses needs of higher fidelity
    Link 16 RF simulation

18
SG and PDG On-Line Resources
  • SISO Reflectors
  • http//www.sisostds.org (go to reflectors)
  • All discussions and documents from the SG and PDG
    are available from the reflector page
  • AFAMS Hosted Discussion Server and Document
    Repository
  • http//www.afams.af.mil
  • Click on programs and exercises, listed on this
    page
  • DMSO Reflector
  • Currently not in use, has archives for Nov-Jan 01

19
Link 16 PDG 03S-SIW-072
  • Representation of Link 16 Communications in the
    Joint Distributed Engineering Plant
  • Zach Furness

20
Link 16 PDG
  • Technical Discussions on High Fidelity
    Implementations
  • Adin Burroughs, James Nutaro

21
Current Level 4 Synchronization
  • Renamed to Medium Level Synchronization
  • Requires participants to be time synchronized
  • Participants go through Low Fidelity
    Synchronization
  • Participants then go through a series of RTT
    exchangemethod for simulating this has been the
    crux of much debate
  • Problem has been in overcoming latency

22
Current Level 4 Synchronization
23
Current Level 4 Synchronization
  • This allows simulators to go through fine
    synchronization, simulating the effects of fine
    synchronization
  • This meets the needs of effects based
    simulatorsmission training/rehearsal, compliance
    testing
  • This does not meet the needs of the Link 16
    Experimentation/Analysis community, where
    simulation of the RTT exchange needs to happen
    with errors lt1MS
  • Will attempt to meet this via HLA effects
  • If HLA cannot meet these needs, will need to move
    to a JTIDS Communication Server for ultra-high
    fidelity analysis/experimentation

24
Link 16 PDG03S-SIW-142
  • Review of SISO STD-002
  • Draft Link 16 Simulation Standard

25
Link 16 PDG Wrap-up
  • Action Item Review
  • Review of upcoming schedule
  • TDL SG Reminder!
Write a Comment
User Comments (0)
About PowerShow.com