Construction Industry Advancement Program

Description:

New Jersey Turnpike Authority. Working with New Jersey Turnpike Authority ... P500.158B PNC Bank Arts Center Amphitheater Improve. A500.TBD Authority Maint. ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 14
Provided by: JTWit
Learn more at: http://ciapofnj.org
Category:

less

Transcript and Presenter's Notes

Title: Construction Industry Advancement Program


1
Construction Industry Advancement Program
New Jersey Turnpike Authority
Working with New Jersey Turnpike Authority
Highway and Building Projects
John T. Withers, P.E.,P.P. Supervising Engineer,
Highways/Buildings - Design
November 19, 2009
2
HIGHWAYS / BUILDINGS - DESIGN CONSTRUCTION
AWARDS
  • YEAR CONTRACT AWARDS
  • 2008 122 Million (Actual)
  • 2009 235 Million (Actual)
  • 2010 338 Million (Projected)
  • 2011 649 Million (Projected)

3
2009 Contracts AwardedHighways / Buildings
Design Section
NUMBER CONTRACTS 5 4 3 2 3 1
CONTRACT DESCRIPTION PAVEMENT
RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM
IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY
RECONSTRUCTION INTERCHANGE IMPROVEMENTS
CONSTRUCTION AWARDED 35M 15M 32M 22M
128M 3M
TOTALS 235M
4
2010 Contracts to be AwardedHighways /
Buildings Design Section
  • AWARD
  • SCHEDULE
  • 1ST QTR
  • 1ST 4TH QTR
  • 1ST 4TH QTR
  • 1ST 3RD QTR
  • 3RD 4TH QTR
  • 4TH QTR
  • 4TH QTR
  • 3RD 4TH QTR

NUMBER CONTRACTS 3 6 6 4 2 3 2 6
CONTRACT DESCRIPTION PAVEMENT
RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM
IMPROVEMENTS ROADWAY IMPROVEMENTS ENVIRONMENTAL
MITIGATION UTILITY RELOCATION ROADWAY
RECONSTRUCTION INTERCHANGE IMPROVEMENTS
CONSTRUCTION ESTIMATE 20M 29M 49M 23M
7M 30M 120M 60M
TOTALS 338M
5
2011 Contracts to be AwardedHighways /
Buildings Design Section
  • AWARD
  • SCHEDULE
  • 1ST QTR
  • 2nd 3rd QTR
  • 2nd 3rd QTR
  • 1ST 2nd QTR
  • 2nd 3rd QTR
  • 2nd 3rd QTR

NUMBER CONTRACTS 3 7 6 8 6 5
CONTRACT DESCRIPTION PAVEMENT
RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM
IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY
RECONSTRUCTION INTERCHANGE IMPROVEMENTS
CONSTRUCTION ESTIMATE 20M 62M 81M 21M
315M 150M
TOTALS 649M
6
Pavement Restoration25M in Annual Resurfacing
Contracts(3 5 Contracts Ranging from 5M -
8M)
  • Turnpike Resurfacing
  • Milepost 0 to 74 (South)
  • Milepost 74 to 122 (North)
  • GSP Pavement Restoration
  • MP 0 to MP 75 (Southern)
  • MP 75 to MP 146 (Central)
  • MP 127 to MP 172 (Northern)

7
Facility Improvements
  • Contracts to be Awarded in 2010 / 2011
  • P500.155 NJSP Vehicle Maintenance Facility
  • P500.158B PNC Bank Arts Center Amphitheater
    Improve.
  • A500.TBD Authority Maint. Bldg. Improve. (5
    Contracts)
  • T500.TBD Turnpike Toll Bldg. Improve. (2 - 4
    Contracts)
  • P500.TBD Parkway Toll Area Improve. (3
    Contracts)

8
Sign System Improvements
  • Contracts to be Awarded in 2010 / 2011
  • T600.156 Turnpike Sign Panel Replacement 0 to
    48.7
  • A600.102A Install VMS on Turnpike and Parkway
  • A600.157 Advance Sign Structure Fab. (2
    Contracts)
  • A600.102(BCD) Install VMS/VSLS on TPK (3
    Contracts)
  • A600.102(EF) Install VMS on GSP (2 Contracts)
  • A600.TBD Guide Sign Improve on TPK GSP
    (North)
  • T600.TBD Guide Sign Improve on TPK (South)
  • P600.TBD Guide Sign Improve on GSP (South)

9
Roadway Improvements
  • Contracts to be Awarded in 2010 / 2011
  • P200.127 Parkway Guide Rail Improvements 0
    to 126
  • P200.159 Advance Clearing for GSP Widening
    48 to 63
  • P200.140 GSP Grading Drainage Improve 30
    - 48
  • P200.TBD Install Raised Pavement Markers on GSP
  • P200.171 GSP Drainage Improvements 0 to 140
  • T200.TBD Turnpike Median Barrier Repairs 0
    to 122
  • T200.TBD TPK Local Pier Abutment Protection
    Impr.
  • P200.TBD GSP Local Pier Abutment Protection
    Impr.

10
Environmental Mitigation
  • Contracts to be Awarded in 2010 / 2011
  • P900.121 Great Bay Boulevard Bulkhead
    Improvements
  • T700.TBD Piles Creek Wetland Mitigation

11
Utility Relocation
  • Contracts to be Awarded in 2010 / 2011
  • P900.TBD Relocation of Overhead Utilities MP
    63 to 80
  • P900.TBD Force Main Relocation MP 10 to 12
  • P900.TBD Advance Utility Relocation MP 48 to
    63

12
Roadway Reconstruction
  • Contracts to be Awarded in 2010 / 2011
  • P100.132 Widen Rehab Patcong Creek Bridge
    MP 31
  • P200.TBD Grade Separation Improve at Int. 9, 10
    11
  • P200.136 Widening of the GSP MP 58 to 63
  • P200.135 Widening of the GSP MP 52.5 to 58
  • P200.134 Widening of the GSP MP 48 to 52.5
  • P200.TBD GSP Shoulder Reconstruction MP 93.5
    - 99.5
  • P200.TBD GSP Shoulder Reconstruction MP 88.5
    - 93.5
  • P200.TBD GSP Shoulder Reconstruction MP 83.5
    - 88.5

13
Interchange Improvements
  • Contracts to be Awarded in 2010 / 2011
  • P300.172 Improvements to GSP Interchanges 141
    150
  • T300.188 Turnpike Interchange 10 Improvements
  • P300.TBD Operational Access Improvements to
    Int. 145
  • T300.176 Turnpike Interchange 9 Improvements
  • P300.TBD Improvements to GSP Int. 153
    154/155P
  • T300.TBD Turnpike Int. 15W Int. 16W
    Improvements
  • P300.TBD Improvements at GSP Interchange 157
  • T100.023 Tremley Point Connector Road
  • P300.TBD GSP Interchange 88 Improvements
  • T300.TBD Turnpike Interchange 8A Improvements
  • P300.TBD GSP Interchange 91 Improvements