Ron Hochnadel - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

Ron Hochnadel

Description:

Force CCH only operation during critical period. Reduce extraneous ... Time: 1:00 pm, Eastern Daylight Time. SAE Webex. Teleconference information. Conference call ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 6
Provided by: ronhoc
Category:
Tags: hochnadel | period | ron | time

less

Transcript and Presenter's Notes

Title: Ron Hochnadel


1
TECHNICAL DESIGN SPECIFICATIONS
Priority Status Presentation 06/18/2009
SAE DSRC Message Framework Subcommittee Status
Report and Update to the SAE DSRC Technical
Committee IEEE P1609 Working Group
Ron Hochnadel (206) 322-8085
Neal Probert (248) 488-8578
2
Agenda
  • Charter
  • Administration
  • Application Programming Interface
  • Software Requirements Specification
  • Interface Requirements Specification
  • Discussion

3
Application Programming Interface
ANNEX A
  • No formal API is proposed as part of J2735 or
    P1609.
  • Having an API is convenient for those groups
    doing joint RD work with equipment from multiple
    vendors
  • J2735 API elements (if an API is developed)
  • Message priority
  • Transmission power level
  • Existing APIs PATH, Kapsch, Denso
  • Probable APIs IntelliDrive (sm)
  • Specialized APIs OmniAir for standards
    interfaces testing
  • Considerations for APIs
  • ISO Reference Model
  • CORBA IIOP

4
Software Requirement Specifications
ISSUES
  • No formal SRS as part of J2735 or P1609.
  • To be followed by a Software Design Specification
    (SDS) which will define an API.

5
Interface Requirement Specifications
TABLE
  • IRS Descriptions as part of J2735
  • Radio Interface
  • Help needed from vendors
  • Application Interface
  • Data Flow
  • Enable SRS and API development as needed.
  • Informative to J2735 and P1609

6
Packet Header
Discussion
DISCUSSION
  • No formal API as part of J2735 or P1609.
  • What about ETSI TC-ITS?
  • No formal SRS as part of J2735 or P1609.
  • IRS Descriptions as part of J2735
  • Safety Considerations
  • Synchronize with CCH operation
  • Force CCH only operation during critical period
  • Reduce extraneous chatter of non-safety messages
  • Vehicles involved, or all vehicles in range

7
Message Framework Status Presentation
Questions Discussion Next DSRC Message
Framework Meeting Date Tuesday, July 21, 2008
Time 100 pm, Eastern Daylight Time
-----------------------------------------------
-------- SAE Webex -----------------------------
-------------------------- --------------------
-----------------------------------
Teleconference information ---------------------
----------------------------------
Conference call in (412) 380 2000
Ron Hochnadel ronh_at_intrass.com
Neal Probert probern_at_ntcna.nissan-usa.com
Write a Comment
User Comments (0)
About PowerShow.com