Sustainment Center of Excellence - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

Sustainment Center of Excellence

Description:

Bradley A3 HOTT required for training. 08 ISSUE UPDATE. As of 18 Mar 09. Lead: ... addition to a turret maintenance HOTT, a trainer for hull maintenance training ... – PowerPoint PPT presentation

Number of Views:402
Avg rating:3.0/5.0
Slides: 39
Provided by: armytraini
Category:

less

Transcript and Presenter's Notes

Title: Sustainment Center of Excellence


1
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • (Ordnance-Quartermaster-Soldier Support
    Institute-Transportation)
  • Training Support System Review (TSSR)
  • Quarterly Update and Planning
  • Teleconference
  • 0900-1130, 24 Mar 09 at 757-878-7087. No pass
    code.
  • (Just let it ring until someone picks up)

Training Support The Armys Advantage
2
Agenda
  • Purpose
  • Suspense Items From Last VTC (see minutes)
  • Issues Update (by exception)
  • BCTSP
  • SRP
  • STSP
  • MER Reset
  • Key Planning Milestones
  • Way Ahead
  • TSSR Event Agenda
  • Questions / Discussion

3
Purpose
  • To provide CASCOM/SCoE Proponent leadership with
    an update on Training Support System
    Review/Mission Essential Requirements Review
    (TSSR/MER) issues captured during the May 2008
    SCoE TSSR/MER and establish the way ahead for the
    FY09 TSSR.

4
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • BATTLE COMMAND TRAINING SUPPORT ISSUES

Training Support The Armys Advantage
4
11/14/2009
5
TSSR Issue Sheet SCoE BC Training Strategy
As of 24 Nov 08
07 ISSUE UPDATE
  • Lead
  • SCoE Chris Johnson, christopher.johnson_at_us.army.m
    il
  • CTD Mr. Dave Bowman, david.bowman_at_us.army.mil

Issue SCoE BC Training Strategy
(07-01-BC-SCoE) Discussion The current SCoE BC
training strategy addresses pooling of assets to
support multiple-like BC requirements across the
installation in support of institutional and
operational tenant unit requirements
(Lee/Eustis). There is a disconnect between the
VCSA guidance (ACP Update on 17 Apr 08) and the
emerging BCTS as to the responsibilities of CoEs
in training Operational Forces. Currently
DAMO-TRS has only validated Installation
(Lee/Eustis) requirement SCoE support of POIs
(Lee/Eustis/Jackson (future)) DAMO-TR has not
resourced requirement to provide pre-deployment
training support to TSC, ESC etc.
  • STATUS Re-done draft BCTS is out for AO level
    staffing before being resubmitted. Institutions
    will have some limited Operational Training
    responsibility as directed by TRADOC.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline TRADOC, SCoE
coordinate logistics community BC training
requirements with FORSCOM, FIRST Army, USARC and
NGB. Next, provide comments to draft BCTS.
CAC-T consider all comments on draft BCTS obtain
approval of BCTS from DA G3.
5
6
TSSR Issue Sheet BCTC Facility
As of 24 Nov 08
07 ISSUE UPDATE
  • Lead DAMO-TRS (NSC-TCID for DAMO-TRS, Mr Dan
    Buchberg dan.buchberg_at_us.army.mil
  • Support SCoE, Chris Johnson
  • Issue BCTC Facility (07-02-BC-SCoE)
  • Discussion
  • Programmed MCA (Log U, PN64349) is a
    projected SCoE BSC facility to support school
    POIs.
  • BCTC is for tenant Operational units on Ft
    Lee and Ft Eustis. It is not a SCoE BSC
    facility. New FY 15 Operational BCTC MCA project
    competing in FY10-15 POM. Based on DP 91, BCTC
    Design Board consult with garrison and units to
    determine operational facility requirement.
  • STATUS BCTC requirement for Fort Lee was not
    validated on the FY10-15 POM. Will re-compete in
    FY12-17 POM. CAC-T, CTD and NSC reviewed the BCTC
    facility requirements for training ESC/BSC type
    units. Recommendation of increased building size
    resulted and was briefed to Mr. Moore.
  • Assistance necessary No
  • Discussion Will re-compete in FY12-17 POM.

Y
Recommendation/Timeline Awaiting final POM
determination. SCoE provide minimal required BC
and C2 system training for operational units
tenant on Lee/Eustis until BCTC is operational.
6
7
TSSR Issue Sheet Constructive SIM/STIM ERF-L
As of 24 Nov 08
07 ISSUE UPDATE
  • Lead
  • SCoE Chris Johnson, christopher.johnson_at_us.army.m
    il
  • Issue Constructive SIM/STIM ERF-L
    (07-04-BC-SCoE)
  • Discussion
  • ERF-L provides fidelity for brigade and below
    sustainment operations
  • ERF-L may not be appropriate for
  • Leaders heading to EAB units ISO theater-level
    operations.
  • SSI for personnel and financial
    managementreplacements postal operations, etc.
  • Other schools that fall under SCoE and that might
    require LOD (JAG, Chaplain, Maritime)
  • STATUS NSC currently conducting CoE/Institution
    Requirements Study for Sim/Stim. This study will
    reevaluate the requirement of ERF-L. In addition
    Full Spectrum LOD will complete BETA test in Feb
    09 and may be suitable for fielding in secong
    half 09.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Next, NSC (CD, OPS,
LESD) and SCoE analyze POI use cases to determine
if existing sim/stim capability ( ERF-L or other)
meets POI requirements. If other capability is
required, must include PEO STRI, TCM Gaming
Technology, etc. in the analysis.
7
8
TSSR Issue Sheet LVC Training Connectivity
As of 28 Aug 08
07 ISSUE UPDATE
  • Lead
  • SCoE Chris Johnson christopher.johnson_at_us.army.mil
  • Issue LVC Training Connectivity (07-06-BC-SCoE)
  • Discussion
  • SCoE should consider future requirements for
    integrated LVC training. Should not consider LVC
    just because it is technologically feasible need
    to determine the value added for BC training.
  • IOT conduct that training, consider the
    potential network capability to connect Digital
    Ranges, Battle Labs, BCTC, and/or School houses
    (local distant). Considerations should also
    include Video, Wireless, Voice over IP, Video
    Teletraining and Teleconferencing, Voice
    communications nets, Digital nets, Secure and
    Classified nets and Satellite coverage.
  • STATUS Ongoing action.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline SCoE examine the BC
training strategy and current capabilities
available IOT identify additional capabilities
required to fully satisfy any future LVC training
requirement.
8
9
TSSR Issue Sheet Gaming Technology in POIs.
08 ISSUE UPDATE
As of 7 May 09
  • Lead CASCOM TSD, ATTD
  • Chris Johnson, christopher.johnson_at_us.army.mil
  • Support TCM Gaming
  • Sheldon Parks, Sheldon.parks_at_us.army.mil

Issue Gaming Technology (GT) to enhance or fill
training gaps in institutional POIs.
(08-02-BC-SCoE) Discussion Initial focus of
this discussion is AIT however, GT capabilities
should be applicable beyond AIT and SCoE. Some
CoE POI training gaps are thought to have a
gaming solution. These gaps need to be clearly
identified before determining if they are
suitable for GT. Need an authoring SW-based
capability that allows SCoE to easily create and
edit scenarios/vignettes to satisfy SCoE training
objectives. Would require a multi-media device
(e.g.laptop, PDA, Game-boy).
  • STATUS The Gaming Program of Record (POR) is
    currently fielding the Gaming Product Line,
    scheduled completion is SEP 09. The primary
    education and training application is VBS2 in the
    Gaming product line.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline TCM-Gaming will demo
VBS2 for the SCoE during the TSSR in May 09.
SCoE hardware fielding and NET is planned for SEP
09.
9
9
11/14/2009
10
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • SUSTAINABLE RANGE PROGRAM ISSUES

Training Support The Armys Advantage
10
11/14/2009
11
TSSR Issue Sheet Range Control Facility
08 ISSUE UPDATE
As of 8 Dec 08
  • Lead FLVA
  • Mr. Bryan Holtman, DPTMS FLVA, 804-765-366
  • Mr. Tom Taylor, DPTMS-Range Manager FLVA,
    804-765-3673

Issue Range Control Facility. (08-03-SRP-SCoE) D
iscussion Due to BRAC-COE increased training
load and the consolidation of AIT on Ft. Lee
(from Ft. AP Hill, APG, Redstone Arsenal, Ft.
Eustis), the installation has identified a
requirement for a range control facility capable
of conducting 24 hour operations, needed to
control the live fire range complex. This is
especially critical due to the close proximity of
major civilian thoroughfares and urban
encroachment (Hopewell, Colonial Heights, Prince
George, and Petersburg).
  • STATUS
  • 75 design completed (80K)
  • Requirement is still in need of funding and/or
    POM recognition. Identified in FY08 T-BUD
    (Projects)
  • Assistance necessary No
  • Discussion

R
Recommendation/Timeline Request funding
through the T-BUD funding requirement process
and/or TRADOC Soldier Focus funding (750K)
12
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • SOLDIER TRAINING SUPPORT PROGRAM ISSUES

Training Support The Armys Advantage
12
11/14/2009
13
TSSR Issue Sheet Plan for move of OD TADSS to
SCoE
As of 23 Mar 09
09 ISSUE UPDATE
  • Lead
  • Ms. Gayle Olszyk, OCS
  • Mr. Bob Santillan, ATSC-Fielded Devices, (757)
    878-2910
  • Issue OD/PEO-STRI/ATSC plan for move of OD TADSS
    to SCoE (08-01A-SP-SCoE)
  • Discussion
  • Not everyone is tied-in to the plan for the
    movement of devices from current locations to the
    SCoE.
  • Example is EST-2000, APG does not want to
    release 4 SS to meet Fort Lee endstate
    requirement.
  • STATUS Currently working with PEO-STRI on
    weekly basis to discuss move requirements,
    building requirements and ROM update for FY09.
    In FY09 124/6 BEMT systems will be shipped from
    OMMS to North Range.
  • Assistance necessary Yes
  • Discussion PEO-STRI will pack, move and set up
    TADSS at new location.

G
Recommendation/Timeline Have provided FY09
course move dates to PEO-STRI. Will update
remaining PEO-STRI managers by 30 APR of any
changes to the FY10-11 move.
14
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • ORDNANCE ISSUES

Training Support The Armys Advantage
15
TSSR Issue Sheet BEMT reset planning
As of 23 Mar 09
08 ISSUE UPDATE
  • Lead
  • John DeRaimo, CASCOM SID, 804-765-2342
  • John Archer, CASCOM BRAC,
  • Sonia Klein, ATSC STIDD, 757-878-2910x2074

Issue Basic Electronic Maintenance Trainer
(BEMT) reset planning (08-09-SP-SCoE) Discussion
BEMT Trainers require reset starting in FY11.
Redstone, APG, and Edgewood need to be reset at
Ft Lee (vice moving old systems or being reset
prior to the move to Lee). The same is true for
Knox systems moving to Ft. Benning. Current
on-hand/required for each location are Redstone
(OMEMS), 220 APG (OMMS), 239 and, Knox, 74.
The Ft. Lee BRAC Team must validate total
requirement for BEMT at Ft. Lee to ensure reset
and refresh in conjunction with moves. 13
additional instructor station required at Ft. Lee
to meet 322 configuration. (448/28) for 14 BEMT
classrooms in Building C-3 at Lee.
  • STATUS Ongoing action.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Training Strategy
draft developed (Nov 08) needs further
refinement. Intent is to conduct a BEMT working
group at RSA 3-5 May 09 to finalize the training
strategy and develop draft requirements
documentation (CPD/STRAP).
15
11/14/2009
16
TSSR Issue Sheet Bradley HOTS upgrade for RSA
As of 17 Mar 09
08 ISSUE UPDATE
  • Lead
  • LTC Mike Helm, CASCOM, 804-765-2540

Issue Bradley HOTS upgrade for Redstone Arsenal
(05-03-12OD-SCoE) Discussion RSA need their
HOTS upgraded (currently, A1 version is on hand).
PM is aware of requirement. Requirement is
currently not funded. Currently Redstone uses
actual turrets to conduct training, but lacks the
ability to insert faults for troubleshooting.
  • STATUS CG signed memorandum outlining Bradley
  • Maintenance Training Strategy requirements.
    Memorandum given to PM on 2 Nov 08 for review and
    recommendations. IPT conducted with PM and
    PEO-STRI on 18-19 Feb 09. 14M currently
    available for Bradley training systems. System
    priorities established.  
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Implement priorities
with available and in future budgets.
16
11/14/2009
17
TSSR Issue Sheet Sustainment for Virtual
Welding Trainers
As of 13 Mar 09
08 ISSUE UPDATE
  • Lead
  • CW5 Peters, OMMS-WMSD, 410-278-9887.
  • John DeRaimo, CASCOM-SID, 804-765-2342

Issue Sustainment for Virtual Welding Trainers
(08-02-SP-SCoE) Discussion Virtual Welders
were purchased by OMMS. Need sustainment
funding. Purchased off the shelf by OMMS. Eight
student stations and one instructor station. Has
been online for a yearmanufactures warranty has
two years left on it. Support runs out in June.
No requirement document. Trying to link to SEW
STRAP.
  • STATUS Recommend closing the issue. Virtual
    Welder supports MOS 44B, which is undergoing
    consolidation. In addition, manufacturer of the
    Virtual Welder has undergone a merger and may not
    support the device. As part of the analysis for
    the MOS consolidation and Skills Based Training,
    we will relook requirements.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Close issue.
17
11/14/2009
18
TSSR Issue Sheet M109A6 Panel Trainers are out
of date
As of 21 NOV 08
08 ISSUE UPDATE
  • Lead
  • USAFAS DOTD/TCM Cannon - Steve Sells,
    stephen.sells_at_us.army.mil, DSN 639-3454, Comm
    (580) 442-3454
  • Support
  • USAOMMS - AJ Jones, aj.jones_at_us.army.mil. DSN
    298-7385, Comm (410) 278-7385
  • TCM-HBCT - Mike Karbon, michael.karbon_at_us.army.mil
    , DSN 786-6681 Comm (586) 214-6681

Issue M109A6 Panel Trainers are out of date
(08-03-SP-SCoE) Discussion The M109A6 Panel
Trainers became outdated when the turrets were
modified several years ago. USAFAS, with input
from USAOMMS, is developing the requirements to
replace the outdated panel trainers with virtual
3-D desk top trainers. PM HBCT is working the
funding for the new trainers with PM FSP.
  • STATUS Unfunded requirements for the M109A6
    included in FY10-15 POM review. Efforts include
    coordination with PEO STRI Customer Support
    Group. M109A6 cost estimates are 0.75M for
    Non-Recurring Expenses in FY11 and 1.6M in FY12
    for updates.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Continue to refine cost
data. Continue coordination and requirements
development effort. Replace Panel Trainers with
3D Virtual Desk Top Trainers.
19
TSSR Issue Sheet Bradley A3 DTT software upgrade
As of 19 Nov 08
08 ISSUE UPDATE
  • Lead
  • John Clancy, CASCOM TD, 804-765-1130
  • Terry Young, 1/81 Armor Bn, 502-624-5685
  • Steve McWilliams, OMMS, 410-278-4115
  • LTC Mike Helm, CASCOM, 804-765-2540

Issue The Bradley A3 DTT and Instructor/Operator
Station require software upgrade.
(08-06-SP-SCoE) Discussion The upgrade is in
support of the Bradley A3 Chassis Modernization
Embedded Diagnostics (CMED).
  • STATUS CG signed memorandum outlining Bradley
    Maintenance Training Strategy requirements.
    Memorandum given to PM on 2 Nov 08 for review and
    recommendations. IPT conducted with PM and
    PEO-STRI on 18-19 Feb 09. 14M currently
    available for Bradley training systems. System
    priorities established.  
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Implement priorities
with available and in future budgets.
19
11/14/2009
20
TSSR Issue Sheet Bradley A3 CMED software
upgrade
As of 18 Mar 09
08 ISSUE UPDATE
  • Lead
  • Tim Durbin, CASCOM SID, 804-765-1206
  • Assist Terry Young, 1/81 Armor Bn, 502-624-5685
  • Assist Steve McWilliams, OMMS, 410-278-4115

Issue The Bradley A3 Chassis Modernization
Embedded Diagnostics (CMED) software requires
upgrade to allow for hull fault insertion
capabilities. (08-07-SP-SCoE) Discussion The
upgrade is in support of the Bradley A3 CMED
(Hull) training. Currently the Bradley A3 turret
has fault insertion capabilities with Vehicle
Diagnostic Management Software (VDMS).
  • STATUS CG signed memorandum
    outlining Bradley Maintenance Training Strategy
    requirements. CASCOM hosted a Bradley Maintenance
    Training IPT on 18-19 Feb 09. Training
    equipment/device requirements were validated with
    PM, TCM and PEO-STRI representatives. IPT
    participants formulated a priority list for
    acquisition and fielding of Bradley TADSS.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline PM representatives are
exploring funding options to support short and
long term acquisition strategy so schools can
receive TADSS as rapidly as possible.
20
11/14/2009
21
TSSR Issue Sheet Bradley A3 HOTT required for
training
As of 18 Mar 09
08 ISSUE UPDATE
  • Lead
  • Tim Durbin, CASCOM SID, 804-765-1206
  • Assist Terry Young, 1/81 Armor Bn, 502-624-5685
  • Assist Steve McWilliams, OMMS, 410-278-4115

Issue A Bradley A3 Hands-On Turret Trainer
(HOTT) is required for future Bradley training
due to substantial number of Bradley A3 platforms
being fielded. (08-08-SP-SCoE) Discussion If
the future Bradley fleet will primarily be
composed of the Bradley A3 variant, it is
imperative that a HOTT be developed in order to
support turret training requirements. In addition
to a turret maintenance HOTT, a trainer for hull
maintenance training should simultaneously be
explored. IAW the M2A3/M3A3 System Training Plan
(STRAP) version 12.2 approved 8 April 2003,
provisions are outlined for maintenance trainers
in support of Ordnance MOSs
  • STATUS CG signed memorandum outlining Bradley
    Maintenance Training Strategy requirements.
    CASCOM hosted a Bradley Maintenance Training IPT
    on 18-19 Feb 09. Training equipment/device
    requirements were validated with PM, TCM and
    PEO-STRI representatives. IPT participants
    formulated a priority list for acquisition and
    fielding of Bradley TADSS.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline PM representatives are
exploring funding options to support short and
long term acquisition strategy so schools can
receive TADSS as rapidly as possible.
21
11/14/2009
22
TSSR Issue Sheet Sustainment for Major
Assemblies
As of 13 Mar 09
08 ISSUE UPDATE
  • Lead
  • Tim Durbin, CASCOM SID, 804-765-1206
  • Steve McWilliams, OMMS, 410-278-4115

Issue Sustainment for Major Assemblies used for
Maintenance Training (08-23-SP-SCoE) Discussion
Major assemblies (engines, transmissions,
transfers, etc) that are used for Maintenance
Training at APG, FT Knox and FT Jackson become
worn over time from the frequent disassembly and
assembly of the items. There are currently no
procedures in place to periodically refresh or
reset these items as we are now doing with the
TRADOC Equipment Modernization Plan. Procedures
need to be established and internalized to plan
for the refresh of these items.
  • STATUS Developed and submitted unfunded
    requirements to CASCOM. UFR is low on the
    priority list. Memorandum for Chief of Ordnance
    signature to request sustainment at PM level is
    in staffing.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Program Managers plan
for the sustainment of these items in the Life
Cycle Management Plan for the system. Addressed
at 10-12 June 2008 summit. Recommend CASCOM
engage ASAALT community, outlining the funding
issue, to see if there is a method to get funding
through the Life Cycle Management Command.
22
11/14/2009
23
TSSR Issue Sheet Basic hydraulics training
capability
As of 23 Mar 09
08 ISSUE UPDATE
  • Lead
  • Steve McWilliams, OMMS, 410-278-4115
  • John DeRaimo, CASCOM SID, 804-765-2342
  • Sonia Klein, ATSC-STIDD, 757-878-2910

Issue Basic hydraulics training capability.
(08-04A-SP-SCoE) Discussion A number of MOSs
require hydraulic training, much like basic
electronics training. The current hydraulics
system trainer is antiquated, and there is a
desire to explore the possibility of
incorporating basic hydraulics training
capabilities into the current BEMT system.
Current Hydraulic Trainer, device number 55-23,
is outdated. Leverage BEMT to incorporate
hydraulics training capability. Requires
Proponent to update the BEMT requirements
document (ORD, 99) to a Capability Production
Document (CPD) and update the System Training
Plan (STRAP). ATSC will provide Proponent
assist.
  • STATUS A two-day BEMT training strategy
    meeting was held from 21 - 22 Oct 08 at Redstone
    Arsenal, AL. Leveraging hydraulic training into
    the ORD was discussed during this meeting.
  • Assistance necessary No
  • Discussion

A
Recommendation/Timeline CASCOM TD OD determine
if hydraulics requirements need to be added to
the BEMT Requirement Document . If not, then
look at adding Hydraulics TADSS into TWV
requirements as a common hydraulics trainer.)
23
11/14/2009
24
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • TRANSPORTATION ISSUES

Training Support The Armys Advantage
25
TSSR Issue Sheet USAODS Driver Trainers
Distribution Plan
As of 13 March 09
06 ISSUE UPDATE
  • Lead
  • Mr. Charles J. (CJ) Florence, TSCH-ADSO,
    757-878-6557
  • Mr. Joe Giunta, PEO-STRI, 407-384-3688
  • Mr. Kevin Landy, ATSC-STIDD, 757-878-2910
  • Issue USAODS Driver Trainers Distribution Plan /
    LCMP is outdated (06-11-01TC-SCoE)
  • Discussion
  • Currently there are multiple variants of the
    ODS system fielded all covered by WCLS
  • 26 thru PEO-STRI original plan called for these
    26 to be upgrade to a CDT variant
  • 47 were purchased by TRADOC
  • Thru LCMP the PM is responsible for execution
    (cradle to grave)
  • Life Cycle Management Activity, responsibility
    of the PM is not being executed (PM-TV did not
    sign LCMP)
  • There are ongoing unauthorized modifications to
    these devices. Army unable to control
    configuration management
  • Current conditions put at-risk current HQDA
    funding support
  • STATUS ONGOING Driver trainers will move from
    Ft Bliss to FLW in July/Aug 09. Further, the
    PM-TV continues to work the tech refresh funding
    via the WSR in support of TADSS. However,
    theres no current funding available for FY 09.
    The TSCH supports the migration path of USAODSs
    to CDT trainers.
  • Assistance necessary No
  • Discussion

G
  • Recommendation/Timeline
  • Update, approve and fund LCMP by PM-TV
  • Future Drivers Trainers should be CDT

25
26
TSSR Issue Sheet Conduct of FORSCOM required
vehicle operator training
08 ISSUE UPDATE
As of 13 March 09
  • Lead USATSCH
  • Mr. Charles J. (CJ) Florence, TSCH-ADSO,
    757-878-6557
  • Assist
  • Mr. Sam Woolf, CASCOM TD, 804-765-1442
  • Ms Hope l. Bean, Movement Branch, 804-765-1453

Issue Conduct of FORSCOM required vehicle
operator training is limited due to lack of
virtual simulator support (08-11-SP-SCoE) Discussi
on Resource constraints dictate that drivers,
commanders, and their units do not have
sufficient operational miles/hours (or other
resources) to hone these individual and
collective skills in a purely live-fire or
live-maneuver environment. Therefore, drivers
will require access to virtual training
capabilities. Current construct of the 7th
SBDEs driver training program consists of 23
hours of classroom and 17 of hours of live
driving prior to a Soldier being certified to
operate a vehicle on Ft Eustis and Ft Story, VA.
Systems will support deployment training for up
to 3,395 FORSCOM personnel. It is anticipated
that 8 hours of live training will be replaced by
virtual training
  • STATUS On 4 Mar 09, the USATSCH received an
    official tasker from HQDA/TRADOC tasking
    IN508236 to develop a Comprehensive, Army-wide
    Driver Training Strategy.
  • Milestones - Presentation of the proposed Drs
    TRNG strategy to
  • 14 August 2009 USATSCH AC/COT
  • 21 August 2009 CASCOM DOT/CG
  • 28 August 2009 TRADOC G3/5/7
  • 5 September 2009 TRADOC DCG/COFS
  • 22 September 2009 TRADOC CG
  • 30 September 2009 DA G/3/5/7
  • Assistance necessary Yes
  • Discussion Integrated Concept Development Team
    (ICDT)

26
27
TSSR Issue Sheet Capabilities document for
locomotive trainer
As of 23 Feb 09
06 ISSUE UPDATE
  • Lead
  • Mr. Caprio, CASCOM, 804-765-1882
  • Donna Heck, TRADOC G-3/5/7, 757-788-3884
  • Tim Durbin, CASCOM SID
  • Issue No capabilities document for locomotive
    trainer thus no sustainment funding.
    (06-11-08TC-SCoE)
  • Discussion
  • Two trainers were purchased by DCSLOG for TSCH
    757th Trans Bn (Milwaukee, WI).
  • Without capabilities document no sustainment
    funding for LETS system. Sep 08 warranty ended.
  • No sustainment dollars identified for FY10 or
    11.
  • STATUS Sustainment dollars available thru
    FY09. LETS non-system CPD previously denied by
    ATSC - Locomotive is a Commercial of the Shelf
    (COT) item not supported by any TOE, therefore no
    system CPD can be developed. Non-system CPD/STRAP
    currently being staffed.
  • Assistance necessary No
  • Discussion
  • STRAP/CPD complete , both documents being staffed.

Y
Recommendation/Timeline Peer-Peer staffing for
CASCOM developed CPD and STRAP completed.
Presently in Army World-Wide Staffing. Est.
completion May 30, 2009
28
TSSR Issue Sheet Funding legacy watercraft TADSS
As of 22 Aug 08
08 ISSUE UPDATE
  • Lead
  • Don Topping, TSCH, 757-878-1069
  • Fred Williams, PD AWS, 586-574-8830
  • Andrew Lawfield, PM Force Projection,
    586-753-2677
  • Keith Caprio, CASCOM, 804-765-1882
  • Issue No funding for legacy-class watercraft
    TADSS. (08-10-SP-SCoE)
  • Discussion
  • Legacy-class watercraft (LSV, LCU, etc.) Training
    Aids, Devices, Simulators, and Simulations
    (TADSS) remain a continual unfinanced requirement
    (UFR).
  • While this fleet of watercraft has been fielded
    new technology upgrades (e.g. C4ISR
    capabilities), TADSS technology
    refresh/modernization has not been program funded
    (although, the TSCH has been aggressive about
    pursuing other funding sources).
  • As the Army watercraft life cycle manager,
    Product Director, Army Watercraft Systems (PD
    AWS, Mr. Fred Williams) coordinate with DA G8,
    TRADOC Capabilities Manager-Transportation, and
    the USATSCH in identifying, requesting,
    obtaining, and executing funding sufficient to
    resolve this issue.

ISSUE CLOSED REQUIRES NO FURTHER ACTION
  • STATUS PD AWS has submitted funding requests in
    the FY10-15 POM sufficient to fund non-JHSV TADSS
    requirements, if approved. JHSV TADSS funding
    requested in the FY10-15 POM, 9.9M, is short by
    approximately 1.7M. This shortfall and any
    other shortfalls resulting from receiving less
    than the amount of funding requested in the
    FY10-15 POM will be requested in the FY12-17 POM.
  • Assistance necessary No
  • Discussion

G
Recommendation/Timeline Costs for TADSS
refresh/upgrades provided to PD AWS by USATSCH as
of 15 Aug 08.
29
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • QUARTERMASTER ISSUES
  • NO TSSR Level Issues
  • All issues are being worked in-house

Training Support The Armys Advantage
30
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • SOLDIER SUPPORT INSTITUTE (SSI)
  • Financial Management School/Adjutant General
    School

Training Support The Armys Advantage
31
TSSR Issue Sheet FMS/AGS Film-Based Case Studies
As of 2 Mar 09
09 NEW ISSUE
  • Lead
  • Ms. Terry Hancock, Chief, Financial Management
    School Distributed Learning (803) 751-8675
    terry.hancock2_at_conus.army.mil

Issue Obtain TRADOC G-3/5/7 funding to develop
two leadership development film-based case
studies Discussion Enhance leadership training
by developing adaptive leaders who can perform
effectively in a complex environment and overcome
unfamiliar challenges and experiences, and to do
so as quickly and efficiently as possible for the
large numbers of resource management and adjutant
general leaders required for the current
operating environment. Film-based media combined
with the learner scaffolding components of the
AXL.Net system will enhance both dL and resident
leadership training at all echelons
  • STATUS Established a funding line item on the
    TRADOC G-3/5/7 FY09 priority list and requested
    3rd quarter resourcing
  • Assistance necessary No
  • Discussion Continue to track status on on FY09
    priority list

G
  • Recommendation/Timeline
  • Aggressively pursue funding throughout FY 09
  • Analyze requirements and develop UFR

31
32
TSSR Issue Sheet CASCOM -SSI Relationship
As of 20 Mar 09
09 ISSUE UPDATE
  • Lead
  • Mr. Kevin Landy, Training Systems Management
    AMD, ATSC (757) 878-2910, ext
    2075 kevin.landy_at_us.army.mil

Issue Determine role/interaction between
CASCOM and SSI regarding the development of
System Training Plans (STRAP). Discussion
SSI has limited experience with STRAP development
due to the small number of systems under their
control. SSI has received limited assistance
from CASCOM with the development of training
plans for DIMHRS and GFEBS. This has lead to
inconsistencies in the documents, i.e. format. In
both cases the PM for both programs has acted as
the training developer. This is most likely a
result of an unclear relationship between the
organization's.
  • Assistance necessary Yes
  • Discussion Track status on FY09 priority list
  • STATUS Working

Y
Recommendation/Timeline Meet with key
representatives to establish the role/interaction
of the organizations. ATSC will do a staff visit
to SSI for SWT training and discuss its role in
the STRAP process. 3rd QTR 09
32
32
11/14/2009
33
CASCOM and the U.S. Army Training Support Center
  • Sustainment Center of Excellence
  • MER UPDATE

Training Support The Armys Advantage
34
STSP and MER Reset Issue SCoE Warrior FTX
NEW DRAFT ISSUE
As of 1 Dec 08
  • Lead
  • Doug Gretka, CASCOM, 804-765-1495 and LTC Jack
    Demuynck, QMCS, (804) 734-3175

Issue Realign FTX related TADSS requirements to
FT AP Hill Discussion The SCoE has changed the
location of the TRADOC mandated 5 day AIT FTX
from Ft Lee, VA to FT AP Hill, VA. The QMCS will
begin 100 of its FTX at FAPH beginning Jan 09.
The OCS will begin arriving in the 4th QTR of
FY09 and will continue to build, culminating with
10 of their Soldiers training by 4th QTR FY11.
TCS will only have one course (88N) participating
in the FTX and that course load begins training
at FAPH in the 1st QTR of FY11.
  • STATUS New requirement
  • Assistance necessary No
  • Discussion

R
  • Recommendation/Timeline
  • Conduct Mission Essential Requirements
    reassessment to identify TADSS requirements in
    support of realignment
  • Realign TADSS, as defined by the QMCS, to be
    located at FT AP Hill TSC IAW MER analysis.

35
SRP and MER Reset Issue SCoE Warrior FTX
As of 1 Dec 08
NEW DRAFT ISSUE
  • Lead
  • Doug Gretka, CASCOM, 804-765-1495 and LTC Jack
    Demuynck, QMCS, (804) 734-3175
  • Issue Realign FTX related range requirements to
    FT AP Hill
  • Discussion
  • The SCoE has changed the location of the TRADOC
    mandated 5 day AIT FTX from Ft Lee, VA to FT AP
    Hill, VA. The QMCS will begin 100 of its FTX at
    FAPH beginning Jan 09. The OCS will begin
    arriving in the 4th QTR of FY09 and culminate to
    100 in 4th QTR FY11. TCS will only have one
    course (88N) participating in the FTX and that
    course load begins training at FAPH in the 1st
    QTR of FY11.
  • The SCoE will utilize ranges for M16A2/M4
    qualification/ zero Convoy Live Fire Range
    Urban Operations Site
  • STATUS New requirement
  • Assistance necessary No
  • Discussion

A
  • Recommendation/Timeline
  • Conduct Mission Essential Requirements
    reassessment to identify Range requirements in
    support of realignment
  • Realign applicable range program requrieements,
    as defined by the QMCS, to be located at FT AP
    Hill TSC IAW MER analysis.

36
Key Planning Milestones
37
Way Ahead
  • Continue working ongoing/emerging issues, as
    needed (Program / Proponent)
  • Solidify key planning milestone dates for FY09
    TSSR/MER (ATSC / SCoE)
  • Publish draft agenda to key participants (NLT end
    of Mar)
  • Conduct AO level coordination meetings (Mar-Apr)
  • Finalize issues/agency (NLT 1 May)

38
QUESTIONS/ DISCUSSION
Write a Comment
User Comments (0)
About PowerShow.com