Title: Keynote Overcoming Barriers to School Efficiency
1Keynote -- Overcoming Barriers to School
Efficiency
- Richard G. Hawes, Director
- Department of Facilities Management
2We Walk The Walk..
Hybrid Electric Car Of Energy Resources Team
3Common Barriers
- Lack of Awareness
- Lack of Motivation
- Controlling New School Design
- Cost Constraints New Buildings
- Resource Constraints Existing Buildings
4Overcoming Lack of
Awareness
- Track Utility Costs And Communicate To CFO
- Utilize Free Resources To Compare Your Energy
Performance To Benchmarks - Are You Significantly Below Average?
5Energy Star Ratings for Sampled MCPS Schools
6Overcoming Lack of
Awareness
- Show Potential Savings
- Use Free Resources
- State And Federal Programs / Tools / Websites
- Beware Of Vendor Claims, Credibility
- Average Retrofit Program Among County Agencies
Has ROI gt 20 - Energy Use In New Schools Has Decreased Up To 30
Without Increasing First Costs
7Overcoming Lack of
Motivation
- Green Sells
- Even When Energy Savings Isnt Understood
- Award / Reward Systems
- Share Of Savings Returned To School (SERT)
- Operated By Contractor For MCPS
- Looking At External Awards This Year Energy
Star Plaques, Earth Apple Awards
8Overcoming Lack of
Motivation
- Curriculum Units On Energy
- Developing Units In All Disciplines
- Create A Culture Of Energy Conservation
- Example Photovoltaic Unit At Goshen ES
9(No Transcript)
10Overcoming Lack of
Motivation
- Curriculum Modules Being Tied Directly Into
System Wide Instructional Planning Model - Must Complement, Not Compete With Basic
Instructional Goals
11(No Transcript)
12(No Transcript)
13Controlling New School Design
- Legislation For Life Cycle Cost Analysis / Energy
Budgets - If You Have It On The Books, Enforce It
- County Code 8-14A New Building Design
- Originated In Montgomery County By Community
Advisory Groups - Public Schools Construction Program In Maryland
Also Requires Life Cycle Cost Analysis
14Controlling New School Design
- Adopt Guidelines To Direct A/E Firms On Critical
Points - Official Energy Codes Are Weak
- Enforce IES Design Light Levels
- Standardize On Selected High Efficiency Lamps
- Enforce Energy Efficient HVAC Types, Standardize
- Standardization Improves Maintenance
15Cost Constraints New Buildings
- Efficient Buildings Are Not Necessarily More
Expensive - Based On DOE Research, And Local Experience Over
The Past 15 Years, Integrated Designs Improve
Quality And Efficiency, Without Increasing Total
Cost Of Project - Efficiency Requires More Thinking, Not More Money
16Cost Control By Integrated Design
17Early Involvement Pays
Savings Potential
Cost to Include
SD
DD
CD
PD
18Cost Constraints New Buildings
- Exception Geothermal Energy Exchange
- 0 to 20 Higher HVAC System Cost
- Rapid Payback Through Combined Energy And
Maintenance Savings.
19(No Transcript)
20Geothermal/Ground Source Heat Pump Systems dont
actually create heat. Instead, they move heat
that already exists. Water is circulated through
a closed Ground Loop system consisting of HDPE
pipes buried beneath the ground.
21Geothermal Meets Challenges of Customers
- Improved Operating Efficiencies
- Energy Reduced 25 To 50
- Maintenance Reduced 66
- Maximize Building Comfort
- Room By Room Control
- Heating Or Cooling Always Available
- Quiet Operation
- Credit Toward LEED Certification
22Installing The Geo Heat Exchanger
Drilling The Boreholes 100 To 300 May Be Needed
23Resource Constraints Existing Buildings
- Energy Capital Improvement Program
- Since 1978 Has Demonstrated Positive Cash Flow
Over Each 6-year Funding Cycle - Find The Smoking Ballast?
- Use Utility Operating Funds For Incentive
Programs, And Quick Payback Projects (lt1 Year)
24Resource Constraints Existing Buildings
- New Funding Options Were Looking At This Year
- QZAB Funding
- Aging School Funds
- Lease Agreements (Through MCPS Master Lease With
Bank Of America) - Federal School Renovation Program
- Community Energy Loan Program (Maryland)
25Successes To Date
- 70 Of Schools Have Lighting Retrofits
- 85 Of Schools Have Energy Management Control
Systems - 3.5 Million Saved Through Occupant Awareness
Programs - All New Buildings Meet Energy Guidelines
- One Geothermal School Open, One In Design
26New Initiatives
- Energy Resources Team Created
- Energy Manager Position Created
- Utility Analyst Position Created
- Energy Now Reports To Directors Office
- With Existing Five Energy Management Technicians,
And New Customer Service Specialist
27New Initiatives
- Energy Resources Team Created (2001)
Energy Control Central For 170 Schools
28New Initiatives
- Pursue Outside Funding Opportunities Of Energy
Improvements - Utility Deregulation
- Contracts For Electricity And Natural Gas Proving
Very Rewarding - Internet Based Automation Systems For SERT And
Energy Management
29The End
Hybrid Electric Car Of Energy Resources Team
30For More Information
- Please Visit Out Website At
- WWW.MCPS.K12.MD.US/Departments/Facilities/GreenSch
oolsFocus