Title: Data%20Available%20for%20Map%203
1Data Available for Map 3
- Data available on corridor level
- Bubble charts
- Catalog data for route(s)
2Example Data
3Data Available
4Zooming in to View Specific Sites
- Attributes of specific sites displayed
- Length
- Type of guardrail
- Location
- Upgrade needed
- Accident data
5Zoomed In (Map 4)
6Data Available for Map 4
- User able to retrieve data on a site
- Site attributes
- Accident data
- Citizen Complaints
7Example data
8New Kent Guardrail Catalog
- Catalog of guardrails currently in place on
routes - 30
- 33
- 60
- 106
- 155
- 249
- 273
9Guardrail Catalog (cont.)
10Preliminary Alteration of Catalog
- All routes put in one workbook
- Worksheet for each route
- Column labels aligned vertically to conserve
space - Experimentation using queries
- Guardrails needing upgrades
11Analysis of Catalog Data
- Data analysis for each route
- Total number of guardrails
- Number of substandard guardrails
- Percentage of substandard guardrails
- Total length of guardrails
- Number of each type of end treatment
- Ultimately will be able to aggregate routes
12Guardrails Needing Improvement
13Improvements Needed For Different Routes
14Addition of HTRIS Data
- HTRIS data added to a few locations for
evaluation - Graphs to compare accidents at different nodes
15Location Key
16Accident Types at Locations
Note Bubble size is value of property damage ()
17Accident Types at Locations
Note Bubble size is value of property damage ()
18Cost Analysis
- Observations
- End treatments
- Needed on all guardrails
- Similar cost for all end treatments (2500)
- Costs that cannot be determined from data
- Removal costs
- Landscaping cost
- Cost variability comes from difference in length
19Visualization of Costs-Risk Tradeoffs
- Compare number and type of accidents vs. the cost
of replacing the substandard guardrail
20Accident Types at Locations
Note Bubble size is cost to upgrade ()
21Adoption of Quantitative and Qualitative
Factors/Endpoints
- Identify factors considered in decision
22Future Work
- Develop a fully detailed version of the map
- Investigate different integration methods between
the catalog and map
23Immediate Future Activities
- Screening for sites without guardrail currently
in place - Visual comparison between potential upgrades and
construction
24Resources
- Comparison Tool (Center for Risk Management of
Engineering Systems, 1999) - Graphical Aids to Decision Making (Tufte,
) - Transportation Planning ()
- Selection of Performance Metrics ()
25Guardrail Prevalence vs. Accidents
Bubble size is DVMT