Title: Generic Space Ground System WBS


1
Generic Space Ground System WBS Cost Drivers
  • Project Proposal Presentation
  • OR 680

2
The Project Team
  • Team members
  • Ron Bryan ( Team Lead )
  • Jim Anthony, Rich Johnson, Kelvin Kercado, Ken
    McKenzie, Sean Stapleton
  • Faulty advisor
  • Dr. Loerch gt OR consultation
  • Dr. Brouse gt SE consultation
  • External Sponsor Tim Anderson (The Aerospace
    Corporation)
  • Project type SE

3
What is a Ground Station?
4
The Problem 1
  • Ground system cost estimation is a poorly
    understood field.
  • Different customers acquire different ground
    system elements and capabilities
  • Cost estimates usually developed on ad hoc basis
  • Special purpose WBS
  • Special purpose, analogy-based cost methods built
    on the fly
  • Specialized models exist, but none are adequate
    to estimate an entire ground system
  • No two ground stations are exactly alike
  • No known modern comprehensive ground system cost
    model

5
The Problem 2
  • An Unprecedented
  • Amount of money will be spent on ground systems
    in next ten years
  • Need for ground system cost estimates exists
  • However each customer is interested in different
    ground elements and capabilities
  • Current models do not meet todays requirements
  • Need a high quality cost estimation model

6
Statement of Work
  • Develop a WBS for a generic space ground station
  • WBS consists of costable building blocks
  • Leaf elements must be mutually exclusive
  • Identify candidate primary cost drivers for the
    leaf elements of the WBS
  • Verify and show that the final generic WBS can be
    applied to foreseeable specific ground stations
    (or major subsystems) of varied composition and
    capability
  • Propose cost modeling methods / techniques that
    can be used to build a ground station cost model
    using this WBS

7
Scope
  • Assume government Space Ground Stations
  • Military, Intelligence and Civilian
  • WBS and cost drivers for design through
    operations.
  • Exclude Government Program/Contracting Office
    costs
  • Final product is not a cost model
  • But will recommend Cost Modeling techniques

8
Sample Existing WBS
  • But
  • No Cost Drivers!
  • Unknown Flexibility
  • Customer Dissatisfaction

9
Cost Driver Constraints
  • Final cost model will be used for budgeting and
    should cost studies.
  • What is knowable 10 years in advance?
  • E.g. What will we know about software?
  • SLOC?
  • Median Programmer Income?
  • What types of functions will it perform?
  • What data will it operate on?

10
Sample Cost Elements
  • MIL-HDBK-881A, 30 July 2005 states the following
    items are Common Elements that comprise the
    costs associated with each WBS line
  • System Test and Evaluation
  • Peculiar Support Equipment
  • Common Support Equipment
  • Operational and Site Activation
  • Initial Spares and Repair Parts
  • Integration, Assembly, Test, and Checkout
  • Systems Engineering
  • Program Management
  • Training
  • Data
  • Industrial Facilities

11
Technical Approach 1
  • Plan project schedule and deliverables
  • Confirm understanding of SOW and deliverables
    content
  • Prepare and deliver draft proposal for client
    sign-off
  • Deliver final project proposal

12
Technical Approach 2
  • Build knowledge and gather data
  • Literature review
  • Identify fundamental requirements
  • Identify studies that address costs and staffing
    requirements
  • Site visits
  • Interview ground system program managers
  • Observe fundamental ground system functions and
    representative hardware, software, manpower and
    overhead needs

13
Technical Approach 3
  • Analyze existing Cost Element Structures
  • Army, NASA, NRO
  • Determine key discriminators through engineering
    estimates and experience
  • Additional input provided by SMEs and vendors
  • Integrate WBS and cost information

14
Technical Approach 4
  • Apply the Spiral Development Model
  • Prepare a preliminary WBS
  • Iterate on client/mentor feedback to draft
  • Iterate on client/mentor feedback to final
    deliverable
  • Develop an appropriate cost estimating
    methodology recommendations

15
Preliminary Project Schedule 1
16
Preliminary Project Schedule 2
17
Projected Project Risks
  • VV scope is unbounded
  • Any Foreseeable is not achievable
  • We will select 5 sample configurations
  • Access to domain knowledge/SMEs
  • Can impact quality of information
  • We must work to develop independent expertise and
    sources of information

18
Why a 5 Project-Specific Bonus?
  • The Aerospace Corporation hires many GMU SEOR
    Grads, and funds its employees to go through the
    SEOR MS programs.
  • A good project outcome
  • Increased industry reputation for GMU SEOR
  • More SEOR students
  • More department funding!!
  • Susan Jones is on the SEOR Advisory Board

19
Questions
  • Questions?
  • Thoughts?
  • Suggestions?

20
Ground Station Cost ModelingProject Presentation
  • Backup
  • Slides

21
The Aerospace Corporation POCs
22
References
  • Wertz, J.R., and Larson, W.J., Space Mission
    Analysis and Design, 3rd Edition, Space
    Technology Library, Microcosm Press and Kluwer
    Academic Publishers, 1999.
  • Turner, S., Bujewski, T., Bush, J. and G. Knebel,
    Automation in Satellite Ground Systems, GSAW,
    Manhattan Beach, CA, 2005.
  • Rich, M., Lazar, S., Betser, J., Space
    acquisition strategy - just how important is the
    ground segment?, GSAW, Manhattan Beach, CA,
    2003.
  • Simmons, C. B. (1998). Evaluation criteria for
    satellite ground systems, GSAW, El Segundo, CA,
    1998.

23
Cost Estimating Techniques
  • Top-Down Estimating (Analogy)
  • Low to medium fidelity
  • Can be conducted early in the development phase
  • Estimate fidelity increases with smaller levels
    of generalization
  • Parametric Estimating
  • Medium to High fidelity
  • Leverages wide base of industry data
  • Parametric tools allow sensitivity analysis for
    identification of cost drivers and affordability
    activities
  • Estimates are sensitive to tool calibration
  • Bottom-Up Estimating (Grass Roots)
  • Very high fidelity
  • Estimate is based on existing vendor quotes,
    bills of materials, actual expenditures

24
Identification of Cost Drivers
  • Method 1 Sensitivity Analysis (Parametric Tool)
  • Determine key attributes that impact cost through
    manual parameter manipulation
  • Compare sensitivity of all parameters of cost
    contributors
  • Method 2 Engineering Estimation
  • Determine key discriminators through engineering
    estimates and experience
  • Input provided by SMEs and vendors
  • Method 3 Conduct Market Research
  • Examine previously fielded systems and FOIA
    contracts
  • Determine cost contributors from actual
    expenditures
  • Determine cost drivers through research and SMEs